Steel supply pressure from capacity replacement in China to take hold in 2021

Publicado: May 18, 2020 16:20
China’s iron and steel sector is unlikely to substantially feel the supply pressure stemming from concentrated capacity replacement until next year, as most of the projects will not come online until the end of this year, SMM expects.

SHANGHAI, May 18 (SMM) – China’s iron and steel sector is unlikely to substantially feel the supply pressure stemming from concentrated capacity replacement until next year, as most of the projects will not come online until the end of this year, SMM expects.

 

The second half of 2020, an anticipated peak year for steel capacity replacement in China, is expected to see 83% of new iron-making capacity for the full year, 79.3% of converter steel-making capacity and 81.6% of electric furnace steel-making capacity for the year coming on stream. Supply pressure from those new capacity, however, is unlikely to take hold until next year, as the commissioning of most of those facilities is in December.

 

China’s iron-making capacity to shrink 320,000 mt/year in 2020

 

A total of 38 blast furnaces, with combined iron-making capacity of 57.54 million mt on an annualised basis, are expected to come online in China this year, with 47.76 million mt, or 83%, in H2, according to data compiled and calculated by SMM.

 

By region, 52.2% of the new capacity for this year is in north China, 19.4% is in the east and 13.1% is in the south, while the top steelmaking province of Hebei is the home to 77.5% of north China’s new capacity.

 

China’s new iron-making capacity coming online in H2 is estimated to require 81.19 million mt of iron ore per annum, and the majority of those raw materials will be sourced from abroad, as the proportion of foreign ore usage to total iron ore usage at those projects ranges 50%-100%, or averages 80%.

 

For the full year of 2020, 57.86 million mt of blast furnace capacity will go offline, indicating a net reduction of 320,000 mt.

 

Table 1: China’s new iron-making capacity anticipated in H2 2020   

Source: SMM

 

Steel-making capacity to decline 5.8 million mt/year this year

 

This year, converters coming online in China are estimated to reach 47.57 million mt on an annualised basis, with 37.7 million mt, or 79.3% in H2, while those going offline will total 57.86 million mt, with 50.41 million mt in H2. That implies a net decline of 10.29 million mt for the year.

 

EF steel-making capacity in the country, however, is expected to see a net increase of 4.49 million mt for 2020, boosting annual steel scrap consumption by 2.81 million mt.

 

A total of 26 EF lines will be put into operation this year, translating to 22.92 million mt of steelmaking capacity, while 18.43 million mt will come offline. About 81.6%, or 18.71 million mt of new EF capacity for the year will not come online until H2.     

 

Table 2: China’s new steel-making capacity anticipated in H2 2020  

Source: SMM

 

Guangxi Liuzhou to commission 7.5 million mt/year of bar capacity in August

 

Guangxi Liuzhou Iron and Steel plans to put 7.5 million mt on an annualised basis of rebar and high-speed wire rod into operation in August, which will exert downward pressure on long steel prices in China.

 

Rolling capacity in China is expected to grow at least 25.2 million mt this year, as the country’s industry ministry did not put a brake on the expansion of such capacity.

 

Most of the facilities will not come online until December, which will have limited impact on the market in H2.

 

Table 3: China’s new rolling capacity anticipated in H2 2020

Source: SMM

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
11 Sep 2026 18:30
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Leia mais
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
On September 9, 2026, Australia initiated its second sunset review of anti-dumping measures on galvanized steel sheet from India, Malaysia and Vietnam, and separately launched a sunset review of countervailing measures on imports from India. The review covers July 2025-June 2026, with the final report expected by February 11, 2027. As galvanized steel is the largest end-use sector for zinc, the measures directly affect export costs and competitiveness, potentially impacting Australia’s domestic zinc demand and supply chain. Maintaining the duties would provide some protection for domestic steel and coating capacity, while termination could increase low-priced imports and affect regional zinc consumption. The final outcome remains subject to the authorities’ determination.
11 Sep 2026 18:30
Projeto de expansão de US$ 200 milhões da JCC Hongyuan Copper visa aumentar a capacidade para 550.000 toneladas até 2027
7 Sep 2026 15:43
Projeto de expansão de US$ 200 milhões da JCC Hongyuan Copper visa aumentar a capacidade para 550.000 toneladas até 2027
Leia mais
Projeto de expansão de US$ 200 milhões da JCC Hongyuan Copper visa aumentar a capacidade para 550.000 toneladas até 2027
Projeto de expansão de US$ 200 milhões da JCC Hongyuan Copper visa aumentar a capacidade para 550.000 toneladas até 2027
O projeto de expansão de 300 mil toneladas/ano de cátodos de cobre da JCC Hongyuan Copper, subsidiária da Jiangxi Copper Corporation, entrou na fase de aviso público de pré-aprovação de sua avaliação de impacto ambiental em 4 de setembro, com investimento total de aproximadamente 1,416 bilhão de yuans. O projeto está previsto para iniciar a construção em setembro de 2026 e ser concluído em dezembro de 2027. Após a conclusão, a capacidade total da JCC Hongyuan saltará de 250 mil toneladas para 550 mil toneladas.
7 Sep 2026 15:43
Iene japonês sobe e USD/JPY cai abaixo de 159 em meio a especulações de intervenção
3 Sep 2026 19:00
Iene japonês sobe e USD/JPY cai abaixo de 159 em meio a especulações de intervenção
Leia mais
Iene japonês sobe e USD/JPY cai abaixo de 159 em meio a especulações de intervenção
Iene japonês sobe e USD/JPY cai abaixo de 159 em meio a especulações de intervenção
[SMM Expresso Metais Preciosos] O iene japonês disparou acentuadamente durante o pregão de quarta-feira, com o USD/JPY caindo abaixo de 159 e fechando em queda de 0,92%, a 158,69, alimentando especulações sobre intervenção cambial japonesa. O índice do dólar também caiu fortemente, e o ambiente de dólar mais fraco deu suporte aos metais preciosos.
3 Sep 2026 19:00
Steel supply pressure from capacity replacement in China to take hold in 2021 - Shanghai Metals Market (SMM)