Tangshan issued air pollution control plan for April

Published: Mar 31, 2020 11:03
China’s top steelmaking hub, Tangshan in Hebei province, has issued its air pollution control plan for April, continuing to exempt steelmakers that are graded as A and B on their environmental status,

SHANGHAI, Mar 31 (SMM) – China’s top steelmaking hub, Tangshan in Hebei province, has issued its air pollution control plan for April, continuing to exempt steelmakers that are graded as A and B on their environmental status, from production restrictions.

 

The curbs on grade-C steel mills will vary. Ganglu, Jinxi’s eastern and western plants, Wenfeng, Tanggang Medium & Heavy Plate, Delong are required to cut capacity of their sintering and pelletising machines and blast furnaces by at least 20%, while the cut is expanded to at least 30% for Donghai, Donghai Special, Jiujiang Wire, Xinda, Yanshan, Rongxin, Songting and Zhayi, and to at least 50% for Tangyin, Chunxing, Tanggang Stainless, Guoyi, Jinma, Donghua, Kaiheng, Ruifeng and Jing’an.

 

Tanggang is ordered to halve capacity of the 360 m2 sintering machine in its southern plant, and to suspend all blast furnaces and two sintering machines but a 3,200 m3 blast furnace and two sintering machines in its northern plant.

 

The plan will not impose production curbs on steelmakers in Tangshan including Tianzhu, Xinbaotai, Huaxi, Rongcheng and Jianlong, either.

 

In March, grade-C mills that helped supply heat were required to cut capacity of their sintering and pelletising machines, lime kilns and blast furnaces by at least 50% in the second half of the month, while this curb, of the same degree, was required of other grade-C mills for the full month.

 

SMM learned that steel mills in Tangshan did not comply with the curbs, however.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
May 27, 2026 14:15
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
Read More
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
Nanyang Zhongjie Receives Approval for Waste Lead-Acid Battery Collection Project
[Waste Lead-Acid Battery Collection Enterprise Updates] Recently, the Xinye Branch of the Nanyang Municipal Ecology and Environment Bureau in Henan Province officially approved the Environmental Impact Assessment Report for the waste lead-acid battery collection, storage, and transfer project of Nanyang Zhongjie Environmental Protection Technology Co., Ltd. (Wan Xin Huan Shen [2026] No. 8). The project will construct a comprehensive workshop integrating weighing, loading and unloading, and storage, with designated areas for intact batteries, dedicated storage rooms for damaged batteries, and temporary hazardous waste storage rooms, with a designed annual collection and transfer capacity of 5,000 mt of waste lead-acid batteries.
May 27, 2026 14:15
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
May 19, 2026 17:28
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
Read More
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
Dongying Xinsanyuan's 200,000 mt Lead-Acid Battery Recycling Project on Track for 2026 Completion
[Secondary Lead Enterprise Updates] It was reported that the 200,000 mt lead-acid battery environmental protection utilization project of Dongying Xinsanyuan Environmental Protection Technology Co., Ltd. was under orderly construction and progressing on schedule, and was expected to be completed and put into operation before the end of 2026. As a key project in Dongying City, Shandong Province, the project had a total investment of 480 million yuan, covering an area of 103 mu. Once completed, it will fill the regional gap in the harmless treatment and resource utilization of waste lead-acid batteries, injecting new momentum into regional green circular development.
May 19, 2026 17:28
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
May 15, 2026 15:24
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
Read More
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
Southeast Asia Lead Supply Tightens, Premiums Rise Due to Environmental Measures and Shipping Delays
[SMM Lead Market News] It was learned that since April, affected by environmental protection rectification and extended shipping cycles, lead smelters in Southeast Asia have experienced production cuts and shutdowns. Lead ingot supply has gradually tightened, spot premiums have risen, and high-grade lead ingots have even become difficult to source. Currently, the SMM Malaysia lead ingot 99.99-99.995% CIF premium was quoted at $150-170/mt, with a few suppliers once again making exploratory offers at a premium of $200/mt, though no transactions have been concluded at this price.
May 15, 2026 15:24