Iron ore demand fell as virus outbreak sent more steel mills into maintenance

Publicado: Feb 12, 2020 15:52
Supply may also weaken on the expectations of lower domestic production of iron concentrate amid virus impact

SHANGHAI, Feb 12 (SMM) – The amount of molten iron daily production affected by maintenance at steelmakers has climbed from 78,700 mt to 220,000 mt over the extended Chinese New Year holiday that ended on February 9, according to a SMM survey, as more mills scale back production to contain the spread of coronavirus. 


Post-holiday restrictions on raw material shipment and elevated stocks of finished products continued to impact the production of molten iron, with the daily affected volumes rising to 269,000 mt as of February 12. This is expected to reduce demand for iron ore by 457,000 mt per day. 

 

 


As squeezed profits keep steel mills purchase cautiously and the impact of COVID-19 delayed the resumption of downstream demand, iron ore deliveries from Chinese ports are likely to remain sluggish in the near term, which will keep iron ore prices under pressure. 


On the supply front, iron ore shipments leaving Australian ports fell on a weekly basis by 4.6 million mt, to stand at 9.75 million mt during February 2-8, as some ports in Western Australia was temporarily closed due to the impact of a tropical cyclone. 


Current stocks of seaborne iron ore at Chinese ports stand 12 million mt lower than a year earlier. This, together with expectations of lower domestic production of iron concentrate in February on virus impact, will see weak demand and supply of iron ore in the short term. 

 

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
11 Sep 2026 18:30
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Leia mais
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
On September 9, 2026, Australia initiated its second sunset review of anti-dumping measures on galvanized steel sheet from India, Malaysia and Vietnam, and separately launched a sunset review of countervailing measures on imports from India. The review covers July 2025-June 2026, with the final report expected by February 11, 2027. As galvanized steel is the largest end-use sector for zinc, the measures directly affect export costs and competitiveness, potentially impacting Australia’s domestic zinc demand and supply chain. Maintaining the duties would provide some protection for domestic steel and coating capacity, while termination could increase low-priced imports and affect regional zinc consumption. The final outcome remains subject to the authorities’ determination.
11 Sep 2026 18:30
Projeto de expansão de US$ 200 milhões da JCC Hongyuan Copper visa aumentar a capacidade para 550.000 toneladas até 2027
7 Sep 2026 15:43
Projeto de expansão de US$ 200 milhões da JCC Hongyuan Copper visa aumentar a capacidade para 550.000 toneladas até 2027
Leia mais
Projeto de expansão de US$ 200 milhões da JCC Hongyuan Copper visa aumentar a capacidade para 550.000 toneladas até 2027
Projeto de expansão de US$ 200 milhões da JCC Hongyuan Copper visa aumentar a capacidade para 550.000 toneladas até 2027
O projeto de expansão de 300 mil toneladas/ano de cátodos de cobre da JCC Hongyuan Copper, subsidiária da Jiangxi Copper Corporation, entrou na fase de aviso público de pré-aprovação de sua avaliação de impacto ambiental em 4 de setembro, com investimento total de aproximadamente 1,416 bilhão de yuans. O projeto está previsto para iniciar a construção em setembro de 2026 e ser concluído em dezembro de 2027. Após a conclusão, a capacidade total da JCC Hongyuan saltará de 250 mil toneladas para 550 mil toneladas.
7 Sep 2026 15:43
Iene japonês sobe e USD/JPY cai abaixo de 159 em meio a especulações de intervenção
3 Sep 2026 19:00
Iene japonês sobe e USD/JPY cai abaixo de 159 em meio a especulações de intervenção
Leia mais
Iene japonês sobe e USD/JPY cai abaixo de 159 em meio a especulações de intervenção
Iene japonês sobe e USD/JPY cai abaixo de 159 em meio a especulações de intervenção
[SMM Expresso Metais Preciosos] O iene japonês disparou acentuadamente durante o pregão de quarta-feira, com o USD/JPY caindo abaixo de 159 e fechando em queda de 0,92%, a 158,69, alimentando especulações sobre intervenção cambial japonesa. O índice do dólar também caiu fortemente, e o ambiente de dólar mais fraco deu suporte aos metais preciosos.
3 Sep 2026 19:00