Lead-acid battery maker operation stable amid increased promotion and weak consumption

Publicado: Nov 29, 2019 17:45 (GMT+8)
Battery producers managed to control inventories at reasonable levels with some mills increasing sales promotion

SHANGHAI, Nov 29 (SMM) – Operating rates across lead-acid battery producers in Jiangsu, Zhejiang, Jiangxi, Hubei and Hebei provinces remained unchanged from the prior week and averaged 57.75% in the week ending November 29, showed SMM survey.

Despite continued tepid demand for electric-bicycle and automobile batteries, battery producers managed to control inventories at reasonable levels with some mills increasing sales promotion. 

SMM learned that battery distributors and retailers remained cautious about purchasing amid lower lead prices. 

Medium-sized and small battery producers had the inclination to restock at year-end, but lesser new orders prompted them to extend discounts for finished products. 

As of November 29, wholesale prices of top brand 48v20Ah batteries for e-bikes stood at 440-470 yuan/set, with prices of lower-quality brands at 410-440 yuan/set. 

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
【Flash | PhotonLink da Coherent prepara o terreno para uma expansão comercial do fosfeto de índio (InP)】
02 Oct 2026 14:34 (GMT+8)
【Flash | PhotonLink da Coherent prepara o terreno para uma expansão comercial do fosfeto de índio (InP)】
Leia mais
【Flash | PhotonLink da Coherent prepara o terreno para uma expansão comercial do fosfeto de índio (InP)】
【Flash | PhotonLink da Coherent prepara o terreno para uma expansão comercial do fosfeto de índio (InP)】
A Coherent lançou o PhotonLink, uma plataforma de óptica integrada para infraestrutura de IA que incorpora lasers de fosfeto de índio (InP), fotônica de silício, detectores e módulos ópticos. A empresa divulgou mais de 10 engajamentos de CPO, mais de 10 engajamentos de NPO e mais de cinco projetos de conectividade chip a chip, com clientes-âncora e acordos de longo prazo garantidos tanto para CPO quanto para NPO. A receita deve começar a crescer no quarto trimestre de 2026. A Coherent já enviou mais de 300 milhões de lasers de InP e está expandindo sua capacidade de fabricação de InP de 6 polegadas para suportar o aumento da demanda. O pipeline de clientes fornece um sinal de demanda comercial mais claro para dispositivos de InP e materiais a montante, embora a capacidade adicional e o consumo de índio não tenham sido divulgados.
02 Oct 2026 14:34 (GMT+8)
O segundo equipamento da Nine Mile chega a Tribag–West Wedge para testar sete alvos eletromagnéticos
02 Oct 2026 10:38 (GMT+8)
O segundo equipamento da Nine Mile chega a Tribag–West Wedge para testar sete alvos eletromagnéticos
Leia mais
O segundo equipamento da Nine Mile chega a Tribag–West Wedge para testar sete alvos eletromagnéticos
O segundo equipamento da Nine Mile chega a Tribag–West Wedge para testar sete alvos eletromagnéticos
Nine Mile Metals anunciou que sua segunda sonda chegou a Tribag–West Wedge em New Brunswick, Canadá, com perfuração prevista para começar em Tribag nos próximos dias. Sete alvos eletromagnéticos modelados estão associados às ocorrências de chumbo-zinco de Tribag e cobre-chumbo-zinco de West Wedge. A perfuração em Wedge continua em paralelo. Até 21 de setembro, a empresa havia concluído 18 furos, totalizando 4.934,50 metros de seu programa anual de 10.000 metros. Os condutores permanecem alvos geofísicos que exigem perfuração para estabelecer sua origem.
02 Oct 2026 10:38 (GMT+8)
【SMM Notícias Rápidas】Masivo intercepta 32,50 metros de mineralização polimetálica contendo chumbo-zinco em Cerro Colorado.
01 Oct 2026 10:06 (GMT+8)
【SMM Notícias Rápidas】Masivo intercepta 32,50 metros de mineralização polimetálica contendo chumbo-zinco em Cerro Colorado.
Leia mais
【SMM Notícias Rápidas】Masivo intercepta 32,50 metros de mineralização polimetálica contendo chumbo-zinco em Cerro Colorado.
【SMM Notícias Rápidas】Masivo intercepta 32,50 metros de mineralização polimetálica contendo chumbo-zinco em Cerro Colorado.
A Masivo Silver reportou resultados do furo CC-26-001, seu primeiro furo em Cerro Colorado, Sonora, México. O furo interceptou 32,50 metros de 226,30 a 258,80 metros com teor médio de 0,271% de zinco, 0,141% de chumbo e 7,0 g/t de prata. Dificuldades técnicas encerraram a perfuração a 259,5 metros, enquanto o furo ainda permanecia em rocha mineralizada.
01 Oct 2026 10:06 (GMT+8)