China’s Lead Market Sees Trading Improvement on Surging SHFE lead, SMM Reports

Publicado: Aug 15, 2017 16:42 (GMT+8)
Supply shortage of refined lead sparked battery producers’ optimistic outlook, and those producers thus expanded purchases, improving transaction in China’s lead market.

SHANGHAI, Aug. 15 (SMM) – In Shanghai, Tongguan and Feilong lead was offered at 19,300 yuan per tonne on Tuesday, or premiums of 70 yuan per tonne against SHFE 1709 lead. Humon lead was offered at 19,350 yuan per tonne, 120 yuan per tonne higher against the same contract. Traders lowered interest in making offers, while downstream battery producers increased inquiries and shoed higher purchase enthusiasm. Transaction in Shanghai’s market was modest.

In Guangdong, Shuikoushan lead was offered 19,350 yuan per tonne, 120 yuan per tonne higher than SHFE 1709 lead. Ex-works price of lead offered by Yunnan Xiangyun Feilong Nonferrous Metals was 19,330 yuan per tonne, which was at premiums of 100 yuan per tonne against SHFE 1709 lead. Other enterprises reported limited offers. Traders made firm offers, and downstream battery producers increased replenishment demand.

SMM Analysis: Lead-Acid Battery Scrap Price Stabilizes, Despite of Volatile Lead Prices

In Henan, Yuguang lead was offered at 19,400 yuan per tonne for spot transaction, or premiums of 250 yuan per tonne against average #1 SMM lead price. Jiyuan Wanyang Smelting Group and Anyang Minshan Nonferrous Metals only supplied goods for term contracts due to tight supply. Anyang Yubei Gold & Lead Group gave offers of 19,350 yuan per tonne, which was 200 yuan per tonne higher than average #1 SMM lead price. Transaction improved.

Firm Lead Price Keeps Downstream Producers on Sidelines, SMM Reports

Spot transaction offered by Tongguan Nonferrous Metals was 19,300-19,350 yuan per tonne with tight supply, 200-250 yuan per tonne higher than average #1 SMM lead price. Yuteng Nonferrous Metals posted stockout for spot transaction. Guiyang Yinxing Nonferrous Metals and Hunan Yongxing Zhongde Smelting offered spot goods at 19,200 yuan per tonne, or premiums of 50 yuan per tonne.

Supply shortage of refined lead sparked battery producers’ optimistic outlook, and those producers thus expanded purchases, improving transaction in China’s lead market.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
【Flash | PhotonLink da Coherent prepara o terreno para uma expansão comercial do fosfeto de índio (InP)】
02 Oct 2026 14:34 (GMT+8)
【Flash | PhotonLink da Coherent prepara o terreno para uma expansão comercial do fosfeto de índio (InP)】
Leia mais
【Flash | PhotonLink da Coherent prepara o terreno para uma expansão comercial do fosfeto de índio (InP)】
【Flash | PhotonLink da Coherent prepara o terreno para uma expansão comercial do fosfeto de índio (InP)】
A Coherent lançou o PhotonLink, uma plataforma de óptica integrada para infraestrutura de IA que incorpora lasers de fosfeto de índio (InP), fotônica de silício, detectores e módulos ópticos. A empresa divulgou mais de 10 engajamentos de CPO, mais de 10 engajamentos de NPO e mais de cinco projetos de conectividade chip a chip, com clientes-âncora e acordos de longo prazo garantidos tanto para CPO quanto para NPO. A receita deve começar a crescer no quarto trimestre de 2026. A Coherent já enviou mais de 300 milhões de lasers de InP e está expandindo sua capacidade de fabricação de InP de 6 polegadas para suportar o aumento da demanda. O pipeline de clientes fornece um sinal de demanda comercial mais claro para dispositivos de InP e materiais a montante, embora a capacidade adicional e o consumo de índio não tenham sido divulgados.
02 Oct 2026 14:34 (GMT+8)
O segundo equipamento da Nine Mile chega a Tribag–West Wedge para testar sete alvos eletromagnéticos
02 Oct 2026 10:38 (GMT+8)
O segundo equipamento da Nine Mile chega a Tribag–West Wedge para testar sete alvos eletromagnéticos
Leia mais
O segundo equipamento da Nine Mile chega a Tribag–West Wedge para testar sete alvos eletromagnéticos
O segundo equipamento da Nine Mile chega a Tribag–West Wedge para testar sete alvos eletromagnéticos
Nine Mile Metals anunciou que sua segunda sonda chegou a Tribag–West Wedge em New Brunswick, Canadá, com perfuração prevista para começar em Tribag nos próximos dias. Sete alvos eletromagnéticos modelados estão associados às ocorrências de chumbo-zinco de Tribag e cobre-chumbo-zinco de West Wedge. A perfuração em Wedge continua em paralelo. Até 21 de setembro, a empresa havia concluído 18 furos, totalizando 4.934,50 metros de seu programa anual de 10.000 metros. Os condutores permanecem alvos geofísicos que exigem perfuração para estabelecer sua origem.
02 Oct 2026 10:38 (GMT+8)
【SMM Notícias Rápidas】Masivo intercepta 32,50 metros de mineralização polimetálica contendo chumbo-zinco em Cerro Colorado.
01 Oct 2026 10:06 (GMT+8)
【SMM Notícias Rápidas】Masivo intercepta 32,50 metros de mineralização polimetálica contendo chumbo-zinco em Cerro Colorado.
Leia mais
【SMM Notícias Rápidas】Masivo intercepta 32,50 metros de mineralização polimetálica contendo chumbo-zinco em Cerro Colorado.
【SMM Notícias Rápidas】Masivo intercepta 32,50 metros de mineralização polimetálica contendo chumbo-zinco em Cerro Colorado.
A Masivo Silver reportou resultados do furo CC-26-001, seu primeiro furo em Cerro Colorado, Sonora, México. O furo interceptou 32,50 metros de 226,30 a 258,80 metros com teor médio de 0,271% de zinco, 0,141% de chumbo e 7,0 g/t de prata. Dificuldades técnicas encerraram a perfuração a 259,5 metros, enquanto o furo ainda permanecia em rocha mineralizada.
01 Oct 2026 10:06 (GMT+8)