Milpo to Release New Resource Assessment for Shalipayco Zinc Mine in Early 2018

Publicado: Jun 9, 2017 13:14
The budget for Shalipayco project’s drilling and other geological engineering work is $ 5 million. Milpo expects to release new resource forecast in early 2018, cnmn.com reported.

SHANGHAI, Jun. 9 (SMM) - The budget for Shalipayco project’s drilling and other geological engineering work is $ 5 million. Milpo expects to release new resource forecast in early 2018, cnmn.com reported.

China Refined Zinc Output Posts Remarkable Decline in May, SMM Reports

Shalipayco is a zinc mine project. Preliminary research has been done during 2008-2014, and drilling length reached 91,000 meters. Milpo estimated zinc reserves with grade above 5% were about 20 million tonnes.

The Shalipayco project is located 170 kilometers in the northeast of Lima. The mine is also associated with lead and silver resources. It covers 21,000 hectares.

SMM Analysis: Is SHFE Zinc Facing Rising Short Squeeze Risk before Delivery?

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
há 2 horas
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Leia mais
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
Australia Reviews Anti-Dumping Duties on Galvanized Steel from India, Malaysia, Vietnam Amid Zinc Concerns
On September 9, 2026, Australia initiated its second sunset review of anti-dumping measures on galvanized steel sheet from India, Malaysia and Vietnam, and separately launched a sunset review of countervailing measures on imports from India. The review covers July 2025-June 2026, with the final report expected by February 11, 2027. As galvanized steel is the largest end-use sector for zinc, the measures directly affect export costs and competitiveness, potentially impacting Australia’s domestic zinc demand and supply chain. Maintaining the duties would provide some protection for domestic steel and coating capacity, while termination could increase low-priced imports and affect regional zinc consumption. The final outcome remains subject to the authorities’ determination.
há 2 horas
Limited Ore Offers Persist as Winter Demand Continues, Chinese Smelters Procure Imports Amid Low Treatment Charges
há 2 horas
Limited Ore Offers Persist as Winter Demand Continues, Chinese Smelters Procure Imports Amid Low Treatment Charges
Leia mais
Limited Ore Offers Persist as Winter Demand Continues, Chinese Smelters Procure Imports Amid Low Treatment Charges
Limited Ore Offers Persist as Winter Demand Continues, Chinese Smelters Procure Imports Amid Low Treatment Charges
Market offers from ore traders remained limited this week, while winter stocking demand persisted. Some Chinese smelters continued to inquire about and procure imported concentrates for Q4, with market treatment charges remaining at low levels.
há 2 horas
Mina de zinco no noroeste da China oferece licitação de setembro a -RMB 2.800/t; SMM acompanhará os encargos de tratamento
há 2 horas
Mina de zinco no noroeste da China oferece licitação de setembro a -RMB 2.800/t; SMM acompanhará os encargos de tratamento
Leia mais
Mina de zinco no noroeste da China oferece licitação de setembro a -RMB 2.800/t; SMM acompanhará os encargos de tratamento
Mina de zinco no noroeste da China oferece licitação de setembro a -RMB 2.800/t; SMM acompanhará os encargos de tratamento
Segundo a SMM, uma mina de zinco no noroeste da China ofereceu um preço de licitação para retirada própria em setembro de cerca de -RMB 2.800/tonelada de metal esta semana. A SMM continuará monitorando as mudanças nas taxas de tratamento.
há 2 horas
Milpo to Release New Resource Assessment for Shalipayco Zinc Mine in Early 2018 - Shanghai Metals Market (SMM)