SHANGHAI, Jul. 15 (SMM) – Coal-electricity-aluminum-processing industry chain is developing in full swing in Yichuan Industrial Park, Henan Province, local media reported.
The park is now home to 2.22 million Kw installed power generating capacity, 840,000 tonne aluminum capacity and 650,000 tonne aluminum processing capacity, the media added.
The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn.

![Com a aproximação do Festival do Meio do Outono e do Dia Nacional, quais são os arranjos de feriado para as empresas de baterias de chumbo-ácido em 2026? [Análise SMM]](https://imgqn.smm.cn/usercenter/mfCMp20251217171721.jpeg)
![Como serão os cronogramas de feriado e o ritmo de compra/venda dos recicladores de baterias sucateadas durante o feriado duplo do Festival do Meio-Outono e Dia Nacional de 2026? [Análise SMM]](https://imgqn.smm.cn/usercenter/guTSZ20251217171722.jpg)
