US Raw Steel production drops significantly to 732,000 net tons: AISI

Publicado: May 27, 2015 13:58 (GMT+8)
United States domestic raw steel production dropped significantly by nearly 7% year-on-year to 732,000 net tons in the week ended May 23.

UNITED STATES May 27 2015 9:35 AM
NEW YORK (Scrap Register): United States domestic raw steel production dropped significantly by nearly 7% year-on-year to 732,000 net tons in the week ended May 23, while the capability utilization rate was 73.3 percent, as per the latest figures released by the American Iron and Steel Institute (AISI).

According to AISI, production was 1,860,000 net tons in the week ended May 23, 2014 while the capability utilization then was 77.3 percent.

Production for the week ended May 23, 2015 is up 1.6 percent from the previous week ended May 16, 2015 when production was 1,705,000 net tons and the rate of capability utilization was 72.1 percent.

Adjusted year-to-date production through May 23, 2015 was 34,942,000 net tons, at a capability utilization rate of 72.3 percent. That is down 7.2 percent from the 37,645,000 net tons during the same period last year, when the capability utilization rate was 77.0 percent.

 

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn
Notícias Relacionadas
SHFE: Aprova a Jinchuan Group Co., Ltd. para ampliar o local de produção registrado da marca “JNMC” de cobre Grau A (cátodo permanente-K)
há 1 hora
SHFE: Aprova a Jinchuan Group Co., Ltd. para ampliar o local de produção registrado da marca “JNMC” de cobre Grau A (cátodo permanente-K)
Leia mais
SHFE: Aprova a Jinchuan Group Co., Ltd. para ampliar o local de produção registrado da marca “JNMC” de cobre Grau A (cátodo permanente-K)
SHFE: Aprova a Jinchuan Group Co., Ltd. para ampliar o local de produção registrado da marca “JNMC” de cobre Grau A (cátodo permanente-K)
há 1 hora
[SMM Anúncio] Preços de metais e atualizações de notícias do mercado chinês suspensos durante o feriado do Dia Nacional (1 a 7 de outubro)
há 1 hora
[SMM Anúncio] Preços de metais e atualizações de notícias do mercado chinês suspensos durante o feriado do Dia Nacional (1 a 7 de outubro)
Leia mais
[SMM Anúncio] Preços de metais e atualizações de notícias do mercado chinês suspensos durante o feriado do Dia Nacional (1 a 7 de outubro)
[SMM Anúncio] Preços de metais e atualizações de notícias do mercado chinês suspensos durante o feriado do Dia Nacional (1 a 7 de outubro)
há 1 hora
Koryx Copper conclui perfuração do PFS de Haib e mira atualização de recursos e PFS até o fim do ano
há 1 hora
Koryx Copper conclui perfuração do PFS de Haib e mira atualização de recursos e PFS até o fim do ano
Leia mais
Koryx Copper conclui perfuração do PFS de Haib e mira atualização de recursos e PFS até o fim do ano
Koryx Copper conclui perfuração do PFS de Haib e mira atualização de recursos e PFS até o fim do ano
Koryx Copper concluiu seu programa de sondagem de preenchimento e expansão no Projeto de Cobre Haib, de sua propriedade integral, no sul da Namíbia, avançando o projeto rumo a uma Estimativa de Recursos Minerais (MRE) atualizada e a um Estudo de Pré-Viabilidade (PFS), com publicação prevista antes do final de 2026. A empresa reportou resultados de ensaios de mais 18 furos de sondagem, totalizando 7.074 metros. Entre os resultados mais recentes, o furo HM199 retornou 438 metros com teor de 0,40% de cobre equivalente (CuEq), incluindo 224 metros a 0,51% de CuEq. O furo HM193 retornou 681 metros a 0,34% de CuEq, incluindo 22 metros a 0,71% de CuEq e 169 metros a 0,40% de CuEq. A Koryx afirmou que os resultados continuam demonstrando amplos intervalos mineralizados em todo o depósito de Haib, juntamente com zonas de maior teor mais próximas da superfície em algumas áreas. A empresa disse que os resultados se correlacionam amplamente com seu modelo geológico existente, e que o programa de sondagem concluído alimentará os trabalhos de modelagem geológica e estimativa para a atualização dos recursos e o PFS. Haib é um grande depósito disseminado de pórfiro de cobre-molibdênio-ouro. A Koryx atualmente prevê desenvolver o projeto como uma operação de mina a céu aberto em grande escala, utilizando moagem e flotação convencionais de sulfetos para produzir concentrados de cobre e molibdênio. A sondagem mais recente vem após a Estimativa de Recursos Minerais da Koryx de março de 2026, que reportou 744 milhões de toneladas de material Indicado com teor de 0,28% de cobre, contendo aproximadamente 2,09 milhões de toneladas de cobre, e 579 milhões de toneladas de material Inferido com teor de 0,24% de cobre, contendo aproximadamente 1,39 milhão de toneladas de cobre, usando um teor de corte de 0,15% de cobre. A Koryx disse que a MRE atualizada e o PFS permanecem dentro do cronograma para publicação antes do final de 2026. A conclusão do programa de sondagem do PFS marca mais um passo no avanço do Haib pela Koryx Copper rumo a um potencial desenvolvimento de cobre em grande escala. A sondagem mais recente continua mostrando amplos intervalos mineralizados, enquanto a próxima estimativa de recursos atualizada proporcionará maior clareza sobre se a sondagem recente de preenchimento e expansão alterou materialmente a base de recursos do projeto. A atenção agora se voltará para a MRE atualizada e o PFS esperados antes do final do ano, que deverão fornecer mais detalhes sobre a configuração proposta da mina, a estratégia de processamento, o perfil de produção e a economia do projeto.
há 1 hora