Rio Tinto Plans 360 MWh Thermal Energy Storage Project at Yarwun Alumina Refinery with Government Support

Published: Oct 22, 2026 17:16 (GMT+8)
[SMM Aluminum Express News] Rio Tinto plans 360 MWh thermal energy storage project at Yarwun alumina refinery, securing up to A$75 million in government support. Rio Tinto announced on October 21 that it will conduct a feasibility study for a proposed industrial-scale thermal energy storage project at its Yarwun alumina refinery in Gladstone, Queensland, in partnership with US-based Rondo Energy. The project would install a 360 MWh heat battery with 30 MW thermal discharge capacity, using low-cost electricity to heat refractory bricks and generate high-pressure steam for alumina refining. The Australian Renewable Energy Agency (ARENA) has committed A$3.6 million for the study, with up to A$38 million available for deployment and a further A$33.3 million in conditional support. If implemented, the system could supply approximately 5% of Yarwun's steam requirements and reduce the refinery's direct CO₂ emissions by around 67,000 mt/year, lowering its reliance on coal and natural gas. The feasibility study is expected to take approximately 12 months, with a final investment decision required before construction. The project represents a potential pathway to reducing energy costs and emissions in alumina refining, although no additional alumina production capacity is planned under the initiative.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn