【Flash | Amerigo's Third-Quarter Molybdenum Output Rises 3% Year on Year】

Published: Oct 14, 2026 15:01 (GMT+8)
Amerigo Resources reported on October 13 that its wholly owned Minera Valle Central tailings operation in Chile produced and sold 0.36 million pounds, or about 163.3 tonnes, of contained molybdenum in the third quarter of 2026, up 2.9% year on year but down 5.3% from the second quarter. Nine-month output reached 1.15 million pounds, or about 521.6 tonnes, up 18.6% year on year and equal to 76.7% of its 1.5-million-pound annual guidance. Heavy rain reduced days available to process historic tailings, but plant availability remained 98.1%. The average molybdenum price rose to 32.38 United States dollars per pound from 29.15 in the second quarter. Figures are contained molybdenum, not physical concentrate mass.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
1 min ago
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
Read More
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
Chile’s National Geology and Mining Service ordered a temporary halt on October 13 at El Teniente’s North Crater waste dump and other areas exposed to avalanche or ground-movement risks, while stating that the order does not suspend the entire division. Amerigo Resources separately said its Minera Valle Central tailings operation was unaffected. El Teniente produced 1,483.1 metric tonnes of contained molybdenum in the first half of 2026, down 34.9% from a year earlier. No disruption to underground mining, concentrators or the molybdenum recovery circuit has been confirmed; SMM is not revising its forecast.
1 min ago
[SMM Steel] Indonesian steel billet rebounded slightly to $473/mt FOB, driven by market adjustments, with downward pressure persisting.
9 mins ago
[SMM Steel] Indonesian steel billet rebounded slightly to $473/mt FOB, driven by market adjustments, with downward pressure persisting.
Read More
[SMM Steel] Indonesian steel billet rebounded slightly to $473/mt FOB, driven by market adjustments, with downward pressure persisting.
[SMM Steel] Indonesian steel billet rebounded slightly to $473/mt FOB, driven by market adjustments, with downward pressure persisting.
[Indonesia] Indonesian steel billet prices rose to $473/mt FOB today, up from $470/mt yesterday (October 13, 2026), after falling $2/mt last Friday (October 9, 2026). Today's increase was merely a market price adjustment, and the price level remains low. Slow local demand left steel mills with no choice but to lower billet prices. Chinese prices, one of the main drivers of Indonesian steel prices, also showed no signs of rising, adding further downward pressure. Prices may continue to move lower within this week.
9 mins ago
[Krakatau Steel Plates Feed Conrad Petroleum's 750-Tonne Conductor Support Frame, Targeting 65% Local Content]
10 mins ago
[Krakatau Steel Plates Feed Conrad Petroleum's 750-Tonne Conductor Support Frame, Targeting 65% Local Content]
Read More
[Krakatau Steel Plates Feed Conrad Petroleum's 750-Tonne Conductor Support Frame, Targeting 65% Local Content]
[Krakatau Steel Plates Feed Conrad Petroleum's 750-Tonne Conductor Support Frame, Targeting 65% Local Content]
Conrad Petroleum's Conductor Support Frame (CSF), a support structure built from steel pipe material weighing 750 tonnes, is scheduled to arrive at Tanjung Priok Port, Jakarta, on October 22, 2026. SKK Migas Head Djoko Siswanto said he received a progress report on the material procurement from Conrad Petroleum and SKK Migas on Saturday (October 10, 2026). The material covers 27 variations of pipe diameter and grade, totaling 242 joints of 12 meters each. The steel plates come from Krakatau Steel in Cilegon, Banten, and will be fabricated at PT PAL Indonesia in Surabaya, East Java. Under this scheme, the CSF targets a local content (TKDN) level of 65% overall, as part of efforts to strengthen the domestic supply chain for upstream oil and gas projects.
10 mins ago