Garuda Yamato Steel Expands Seismic-Grade Structural Steel Supply for Indonesian Infrastructure

Published: Oct 13, 2026 15:43 (GMT+8)

PT Garuda Yamato Steel (GYS) is strengthening its supply of profile and structural steel for Indonesia's construction and infrastructure sectors through its integrated production facility in Cikarang, Bekasi Regency, West Java. President Director Tony Taniwan said the company continues to develop structural steel products, including earthquake-resistant steel, sold as H-Beam and Wide Flange under the name "GYS Tahan Gempa Plus" and made from seismic-grade SN490B steel. He stressed that a building's earthquake resistance depends not only on material quality but also on structural design, connection strength, welding, fabrication, and construction supervision.

GYS, formed in 2024 as a collaboration between Yamato Kogyo, Siam Yamato Steel, PT Hanwa Indonesia, and PT Gunung Raja Paksi Tbk, has a steel production capacity of 1.2 million tonnes per year and rolling capacity of about 900,000 tonnes per year. Its product range includes H-Beam, IWF, U Channel, and Equal Angle. It also runs a Steel Service Center offering CNC sawing, CNC drilling, cutting, straightening, and cut-to-length services beyond the standard 6, 9, and 12 meter sizes. Production uses electric arc furnace (EAF) melting to supply steel for both domestic and export markets.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Data: SHFE, DCE market movement (Oct 13)
4 mins ago
Data: SHFE, DCE market movement (Oct 13)
Read More
Data: SHFE, DCE market movement (Oct 13)
Data: SHFE, DCE market movement (Oct 13)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 13 Oct , 2026
4 mins ago
[SMM Steel] Indonesian HRC Flat at $515/mt FOB as Weak Demand Leaves Mills with Little Pricing Power
21 mins ago
[SMM Steel] Indonesian HRC Flat at $515/mt FOB as Weak Demand Leaves Mills with Little Pricing Power
Read More
[SMM Steel] Indonesian HRC Flat at $515/mt FOB as Weak Demand Leaves Mills with Little Pricing Power
[SMM Steel] Indonesian HRC Flat at $515/mt FOB as Weak Demand Leaves Mills with Little Pricing Power
[Indonesia] HRC prices held steady at USD 515 per metric tonne FOB today, having fallen by USD 10 per metric tonne from USD 525 on Friday (9 October 2026) to USD 515 on Monday (12 October 2026). There are reports of a large offer from Vietnam, which is adding competitive pressure on Indonesian steel mills. With overall demand remaining weak, steel mills lack sufficient bargaining power to maintain prices. Looking ahead, slab prices have fallen for two consecutive days, by USD 8 per metric tonne on Monday and a further USD 2 per metric tonne today to USD 480 per metric tonne FOB. As slabs are the raw material for HRC, this could exert further downward pressure on HRC prices if demand does not improve.
21 mins ago
[voestalpine Commissions New Power Plant Unit at Linz to Support Hybrid EAF and Blast Furnace Production from 2027]
25 mins ago
[voestalpine Commissions New Power Plant Unit at Linz to Support Hybrid EAF and Blast Furnace Production from 2027]
Read More
[voestalpine Commissions New Power Plant Unit at Linz to Support Hybrid EAF and Blast Furnace Production from 2027]
[voestalpine Commissions New Power Plant Unit at Linz to Support Hybrid EAF and Blast Furnace Production from 2027]
Austrian steelmaker voestalpine has commissioned a new power plant unit at its Linz plant as part of its greentec steel decarbonization program, preparing operations for the transition to electric arc furnace (EAF)-based steel production in 2027. The unit was completed and handed over in summer 2026. It will generate electricity from steam produced during the cooling processes of the new EAF, which will help offset the reduced blast furnace gas available once the new EAF replaces a blast furnace. According to voestalpine, the unit is now ready to support the steelworks' transition to hybrid production using both EAFs and blast furnaces.
25 mins ago