Double Festival Arrives, Die-Casting Zinc Alloy Industry Operating Rate Pulls Back [SMM Die-Casting Zinc Alloy Weekly Review]

Published: Sep 30, 2026 16:47 (GMT+8)
[Double Festival Hits, Die-Casting Zinc Alloy Industry Operating Rates Pull Back] From recent end-user performance, affected by high prices, alloy plants have generally reported that downstream hardware factories' stockpiling intensity is weaker than in previous years. By segment, .....

This week, the operating rate of die-casting zinc alloy recorded 38.7%, down 6.87 percentage points WoW. Inventory-wise, some alloy plants still made pre-holiday purchases during the week, raw material inventories edged up, while finished product inventories saw relatively small changes. The notable decline in die-casting zinc alloy operating rates this week was mainly due to some plants having 1-3 days off for the Mid-Autumn Festival, dragging down the overall weekly operating level. From the recent performance of end-users, affected by high prices, alloy plants generally reported that downstream hardware factories' stockpiling intensity fell short of previous years. By sector, traditional real estate hardware orders were ordinary, daily-use small hardware such as luggage zippers and sliders currently saw weak order demand, while orders in the electronics sector remained relatively stable. Looking ahead to next week, most die-casting zinc alloy plants still expect to take holidays during the National Day holiday, and the operating rate of die-casting zinc alloy is expected to edge down to around 37.21%, fluctuating near that level.

                                                                                                                                                

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
4 hours ago
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Read More
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
【Flash | Coherent’s PhotonLink Sets the Stage for a Commercial Indium Phosphide (InP) Ramp】
Coherent launched PhotonLink, an integrated optics platform for AI infrastructure incorporating Indium Phosphide (InP) lasers, silicon photonics, detectors and optical modules. The company disclosed more than 10 CPO engagements, over 10 NPO engagements and more than five chip-to-chip connectivity projects, with anchor customers and long-term agreements secured for both CPO and NPO. Revenue is expected to begin ramping in Q4 2026. Coherent has shipped over 300 million InP lasers and is expanding its 6-inch InP manufacturing capacity to support the ramp. The customer pipeline provides a clearer commercial demand signal for InP devices and upstream materials, although additional capacity and indium consumption were not disclosed.
4 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
7 hours ago
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Read More
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Completes Preliminary Talisman Underground Inspection; Detailed Assessment Still Required
Adamera Minerals announced that JDS Energy & Mining had completed a preliminary underground inspection at its wholly owned Talisman project in Washington State. No immediate impediment to safe re-entry was identified, and mineralization including sphalerite was observed near the portal and adit. More than 200 soil samples await results. Significant underground work still requires detailed geotechnical assessment, support design and stope inspection. Mineral observations do not establish grade, continuity, tonnage or economic potential.
7 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
7 hours ago
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Read More
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
【SMM Flash News】Windfall Renews 592 Hectares of Bathurst Claims to Advance Zinc-Copper Target Validation
Windfall Geotek announced renewal of 592 hectares of claims in Canada’s Bathurst Mining Camp. Zinc targets at Upper Sprig Brook were generated using an AI model trained on zinc-copper assays from seven local volcanogenic massive sulphide deposits. The company plans historical-data compilation and rock or soil sampling to advance target validation and subsequent drill targeting. No new drilling assays or mineral resource estimate were announced.
7 hours ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here