[SMM PV Flash] Zambia Commissions 100 MW Maamba Solar Project

Published: Sep 25, 2026 10:14 (GMT+8)
Maamba Solar Energy Limited, backed by Nava, has commissioned the 100 MW Maamba solar plant in Zambia and begun exporting power to the national grid. The project is covered by a 20-year PPA with state utility ZESCO for its full output and involved an investment of about USD 90 million funded through debt and equity. Nava holds 65% of the project company, while Zambia’s ZCCM Investments Holdings owns the remaining 35%, marking Nava’s formal entry into utility-scale renewables.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV Flash] Energiequelle Sells French Unit and 500 MW Renewables Portfolio to H2air
26 mins ago
[SMM PV Flash] Energiequelle Sells French Unit and 500 MW Renewables Portfolio to H2air
Read More
[SMM PV Flash] Energiequelle Sells French Unit and 500 MW Renewables Portfolio to H2air
[SMM PV Flash] Energiequelle Sells French Unit and 500 MW Renewables Portfolio to H2air
Energiequelle has completed the sale of its French subsidiary, Energiequelle SAS, to French developer and operator H2air for an undisclosed amount. The transaction includes the local team and an approximately 500 MW wind and solar portfolio, comprising about 60 MW in operation and additional projects at advanced pre-construction stages. Energiequelle described the divestment as part of a strategic refocus on core markets, while H2air will retain the employees and continue developing the assets.
26 mins ago
[SMM PV Flash] Play Signs 15-Year Wind and Solar PPA with Qair in Poland
27 mins ago
[SMM PV Flash] Play Signs 15-Year Wind and Solar PPA with Qair in Poland
Read More
[SMM PV Flash] Play Signs 15-Year Wind and Solar PPA with Qair in Poland
[SMM PV Flash] Play Signs 15-Year Wind and Solar PPA with Qair in Poland
Polish telecom operator Play has signed a 15-year physical PPA with Qair Polska for about 35 GWh of wind and solar electricity annually, or roughly 525 GWh over the contract term. Supply will come from Qair-operated wind and photovoltaic plants in Poland and will include EKOenergy-labelled guarantees of origin. The agreement gives Play long-term renewable supply visibility while supporting the financing of new renewable capacity.
27 mins ago
[SMM PV Flash] Greenvolt Starts Construction of 600 MW/2.4 GWh Polish BESS
27 mins ago
[SMM PV Flash] Greenvolt Starts Construction of 600 MW/2.4 GWh Polish BESS
Read More
[SMM PV Flash] Greenvolt Starts Construction of 600 MW/2.4 GWh Polish BESS
[SMM PV Flash] Greenvolt Starts Construction of 600 MW/2.4 GWh Polish BESS
Greenvolt has started construction of the 600 MW/2.4 GWh Siedlce battery energy storage project in Poland, with commercial operation targeted by the end of 2027. The design includes 210 battery containers and 105 transformer containers with power-conversion systems, with BYD Energy Storage supplying the battery technology and P&Q and ONDE supporting electrical infrastructure. Together with the operating Turośń Kościelna project and the Ełk project due online in the fourth quarter, the three assets will total 1 GW/4 GWh.
27 mins ago