[Weak Supply and Demand for Imported Spot Copper, Sluggish Market Performance This Week - SMM Yangshan Copper Weekly Review]

Published: Sep 24, 2026 14:40 (GMT+8)

             

 

This week (September 21-September 24), the weekly average transaction price range for Yangshan copper premium warrants was $111-124/mt, QP October, with an average price of $118/mt; the weekly average transaction price range for B/L was $105-120/mt, QP October, with an average price of $112/mt; EQ copper CIF B/L was $46-60/mt, QP October, with an average price of $53/mt. As of September 24, the SHFE/LME copper price ratio for LME copper against the SHFE copper 2610 contract, excluding exchange rates, was 1.1257, with an import loss of around 1,399.64 yuan/mt, expanding by about 436 yuan/mt WoW. As of Thursday, the backwardation structure of the LME copper October date contract widened WoW, with the carry spread between the October date and November date contracts at $40.69/mt.

This week, spot premiums for imported copper remained relatively stable, while market activity was sluggish. During the week, the SHFE/LME price ratio pulled back, LME near-month contracts shifted back into a backwardation structure, and import losses widened. However, available spot imported copper supply in the market was limited, with cargoes near ports hard to find. As a result, spot offers held firm, while trading activity remained sluggish. Meanwhile, domestic spot copper cathode premiums against the SHFE copper 2610 contract shot up sharply; copper inventories in major regions across China fell to around the 1% percentile of the past year, with smelters holding scarce available supply and already showing overselling. Surveys indicate that smelters with copper concentrate processing trade with imported materials manuals and export qualifications have not yet shown significant export activity.

According to SMM, as of Thursday this week (September 24), domestic bonded zone copper inventories decreased by about 6,500 mt WoW from the previous period (September 17) to 28,000 mt. Among them, Shanghai bonded zone inventory decreased by 6,000 mt WoW to 25,600 mt, and Guangdong bonded zone inventory decreased by 500 mt WoW to 2,400 mt. This week, bonded zone inventories continued to draw down, mainly due to downstream restocking for essential pre-holiday demand and cargo pick-up, with increased shipments from bonded zones. This was also in line with the firm performance of Yangshan bonded warrant premiums.

Looking ahead, with the Mid-Autumn Festival and National Day holidays approaching, only three trading days remain next week. Short-term available spot imported copper supply is expected to remain tight, and suppliers are likely to maintain a firm stance on prices. Meanwhile, the backwardation structure is making downstream buyers cautious about high prices, so the market is expected to be driven mainly by essential restocking demand.

 

                                                                                                                 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

Images in this article contain AI-translated captions for reference only.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
2 hours ago
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
Read More
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 launch US$725m Sierra Gorda expansion, lifting copper capacity 26%
KGHM and South32 have broken ground on a fourth grinding line at the Sierra Gorda copper-molybdenum mine in Chile's Atacama region. The US$725 million expansion runs for three years from January 2027, with completion by late 2029 and full output in H2 2030. Ore processing capacity rises 26%, from 131,000 tonnes per day to 165,000 tpd. Annual copper output is projected to climb from 165,000 tonnes in 2025 to 195,000 tonnes, with 6,000 tonnes of molybdenum, 58,000 ounces of gold and 1.7 million ounces of silver as by-products. The project creates over 900 direct jobs and is funded from operating cash flow and debt. Unit operating costs are expected to fall about 10%.
2 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
3 hours ago
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Read More
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Extends Final Review of Iberian Belt West PFS, Release Expected in Coming Weeks
Emerita Resources has provided an update on the Preliminary Feasibility Study (PFS) for its Iberian Belt West polymetallic project in Spain, saying the study is well advanced but remains under final technical review.​ The company said the review process has been expanded to include additional technical and quality-assurance oversight before publication. As a result, Emerita now expects the PFS to be released in the coming weeks rather than within the previously indicated timeframe.​ Iberian Belt West hosts copper, zinc, lead, gold and silver mineralization and is one of Emerita’s principal development-stage assets in Spain. The PFS is expected to provide updated detail on the proposed mine plan, processing configuration, capital requirements, operating costs and project economics.​ Emerita said the additional review work is intended to ensure consistency and completeness across the technical disciplines contributing to the study before it is finalized.​ The company did not announce a revised specific publication date, and no new production, capital or economic figures were disclosed in the latest update.​ The extended review delays the next major technical milestone for Iberian Belt West, but the company continues to indicate that the PFS is nearing completion. For the copper market, the significance of the study will depend on the production profile and project economics ultimately disclosed, particularly the contribution of copper relative to the project’s other payable metals. Attention will therefore remain on the timing of the PFS release and whether the final study materially changes the project’s development outlook.
3 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
3 hours ago
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Read More
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Intersects 75.55 m at 1.19% Cu at Carmacks Copper-Gold Project
Cascadia Minerals has reported additional drill results from its 2026 exploration programme at the Carmacks copper-gold project in Yukon, Canada, with new step-out drilling extending mineralization at Zone 2000S beyond the boundaries of the existing Mineral Resource.​ Drill hole CD-26-058 returned 75.55 metres grading 1.19% copper, 0.97 g/t gold, 10.4 g/t silver and 335 ppm molybdenum, equivalent to 2.18% copper-equivalent. The interval included 48.66 metres grading 1.61% copper, 1.39 g/t gold, 15.1 g/t silver and 475 ppm molybdenum, equivalent to 3.03% CuEq.​ Within the same hole, a higher-grade interval of 14.50 metres returned 2.30% copper, 2.68 g/t gold, 29.5 g/t silver and 1,015 ppm molybdenum, equivalent to 5.08% CuEq.​ A second hole, CD-26-059, intersected 93.99 metres grading 0.96% copper, 0.70 g/t gold, 4.6 g/t silver and 919 ppm molybdenum, equivalent to 1.94% CuEq. This included 63.97 metres at 1.26% copper, 0.96 g/t gold, 6.3 g/t silver and 1,049 ppm molybdenum, equivalent to 2.52% CuEq.​ Cascadia said the latest results continue to expand mineralization at Zone 2000S beyond the limits of the current Mineral Resource and highlight the higher-grade nature of the extension. The reported drill intervals represent drilled thicknesses, with true widths estimated at approximately 60–70%.​ The latest step-out results indicate that copper-gold mineralization at Zone 2000S extends beyond the boundaries of the current Carmacks Mineral Resource. The broad intervals and higher-grade internal zones could support future resource expansion if additional drilling confirms continuity. However, the new intersections have not yet been incorporated into an updated Mineral Resource Estimate, meaning their ultimate impact on project scale and mine planning remains to be determined.
3 hours ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here