Aqua Metals Secures Offtake Path for Up to 100% of Recovered Copper and Aluminum from Project Headwaters

Published: Sep 15, 2026 09:18
Aqua Metals has signed a non-binding five-year LOI with a Midwest metals recycler covering up to 100% of the commercially saleable recovered copper and aluminum expected from its planned Project Headwaters battery recycling facility. Based on projected volumes and current metal prices, the contemplated copper and aluminum offtake represents more than US$105 million in potential value over five years. Headwaters is designed to process lithium-ion batteries and manufacturing scrap, including large-format LFP material, with copper and aluminum separated during preprocessing for sale into U.S. recycling markets. Together with Aqua Metals' previously announced lithium carbonate offtake framework, the latest agreement establishes potential commercial outlets for all three primary Headwaters product streams before construction. The copper and aluminum LOI remains non-binding and allows 24 months for product qualification and negotiation of a definitive agreement.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Tivan Awarded New Turiscai Copper-Gold Licence in Timor-Leste
3 mins ago
Tivan Awarded New Turiscai Copper-Gold Licence in Timor-Leste
Read More
Tivan Awarded New Turiscai Copper-Gold Licence in Timor-Leste
Tivan Awarded New Turiscai Copper-Gold Licence in Timor-Leste
Tivan (ASX: TVN) was awarded Exploration and Evaluation Licence MEL2025-CA-ZC004, covering about 50 km2 immediately north of its Turiscai Project in Timor-Leste, through the country's Second Minerals Tender 2025 administered by the Autoridade Nacional dos Minerais. Following formal grant the Turiscai Project expands from seven to eight licences totalling about 394 km2, consolidating the company's regional footprint. Tivan is targeting copper-gold mineralisation of porphyry and VMS style; rock-chip sampling has returned up to 23.1% Cu, 7.19 g/t Au and 6.17% Zn. The company plans geological mapping, surface geochemistry and a magnetic drone survey, with maiden drilling scheduled for the December quarter 2026.
3 mins ago
Jubilee Metals Scales Integrated Zambia Copper Model as Output Triples
3 mins ago
Jubilee Metals Scales Integrated Zambia Copper Model as Output Triples
Read More
Jubilee Metals Scales Integrated Zambia Copper Model as Output Triples
Jubilee Metals Scales Integrated Zambia Copper Model as Output Triples
Jubilee Metals (AIM: JLP) is scaling up an integrated mine-to-metals copper model in Zambia, with FY2026 combined output from Roan and Molefe reaching 3,739 t of copper, up 225% year on year. Roan produced 2,823 t of copper in concentrate, including 997 t of oxide concentrate (more than ten times the prior year), while Sable refinery cathode output rose 17.5% to 1,207 t. The group is building a domestic copper supply chain through three pillars: third-party feed processing at Roan, owned mining at Molefe and Project G, and refining at Sable, while its Large Waste project targets about 240 million tonnes of historical tailings. Jubilee is divesting South African chrome and PGM assets to become a pure Zambia copper producer.
3 mins ago
GreenTech Metals Hits 4.76m at 7.13% Copper at Whundo Ayshia
3 mins ago
GreenTech Metals Hits 4.76m at 7.13% Copper at Whundo Ayshia
Read More
GreenTech Metals Hits 4.76m at 7.13% Copper at Whundo Ayshia
GreenTech Metals Hits 4.76m at 7.13% Copper at Whundo Ayshia
GreenTech Metals (ASX: GRE) reported high-grade copper-gold-silver results from diamond hole 26GTDD016 at the Ayshia deposit of its Whundo Cu-Zn-Au Project in Western Australia's Pilbara. The hole intersected 4.76 m at 7.13% Cu, 1.20% Zn, 0.88 g/t Au and 29.6 g/t Ag from 367 m, including 3.44 m at 9.43% Cu, 1.59% Zn, 1.20 g/t Au and 39.7 g/t Ag. The intercept extends mineralisation about 65 m down plunge beyond the Ayshia resource envelope and is the highest-average-grade multi-metre copper intersection recorded at Ayshia. The broader Whundo resource stands at 6.2 Mt at 1.12% Cu and 1.04% Zn; assays from Yannery and Austin are expected in October 2026, with an updated resource estimate targeted for Q4 2026.
3 mins ago
Aqua Metals has signed a non-binding five-year LOI with a Midwest meta - Shanghai Metals Market (SMM)