[SMM Weekly Review] Hydrometallurgical Recycling Market This Week: Pure Cobalt and Ternary Black Mass Payables Fell Steadily, LFP Prices Mostly Fluctuated (Sep. 7, 2026 - Sep. 10, 2026)

Published: Sep 10, 2026 17:57
Raw material side, lithium carbonate prices consolidated at lows this week, with lows repeatedly finding support near 140,000 yuan/mt and highs moving lower day by day from 155,000 yuan/mt at the start of the week. Nickel sulphate prices consolidated in a narrow range, while cobalt sulphate prices broke their stabilisation from last week and resumed declines with widening losses.

SMM, September 10:

Raw material side, this week lithium carbonate prices consolidated at lows, with support repeatedly seen near 140,000 yuan/mt and the high gradually moving down from 155,000 yuan/mt at the start of the week. Nickel sulphate prices consolidated narrowly, while cobalt sulphate prices broke last week’s stabilisation and resumed declines with a wider drop. Today, by ternary, LCO, and LFP material types, LFP hydrometallurgy side: taking LFP electrode black mass as an example, current LFP electrode black mass prices are 6,350-6,700 yuan per % lithium, down another 75 yuan per % lithium WoW from Monday, continuing to grind lower in line with lithium carbonate. Downstream purchases remain mainly just-in-time procurement. LFP battery black mass prices are currently 5,500-6,050 yuan per % lithium, with the price spread versus electrode black mass holding at a high of around 800 yuan per % lithium. Ternary and LCO side, ternary electrode black mass nickel and cobalt payables are around 74-76.5%, stable this week, with some 8-series and 9-series high-nickel ternary electrode black mass deals still at around 77%. LCO electrode black mass cobalt and lithium payables are 72-74.5%. Current secondary cobalt sulphate prices fell by about 4,000 yuan/mt cumulatively this week, with the decline intensifying again. Downstream LCO hydrometallurgy enterprises are increasingly cautious in purchasing, market trading is sluggish, and wait-and-see sentiment is rising.

 

SMM New Energy Research Team

Wang Cong 021-51666838

Ma Rui 021-51595780

Feng Disheng 021-51666714

Lyu Yanlin 021-20707875

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Core Lithium Resumes Spodumene Production at Finniss, Boosting Capacity by 20% After Two-Year Break
24 mins ago
Core Lithium Resumes Spodumene Production at Finniss, Boosting Capacity by 20% After Two-Year Break
Read More
Core Lithium Resumes Spodumene Production at Finniss, Boosting Capacity by 20% After Two-Year Break
Core Lithium Resumes Spodumene Production at Finniss, Boosting Capacity by 20% After Two-Year Break
On September 8th, Core Lithium has produced first spodumene concentrate from the recommissioned Finniss processing plant in the Northern Territory, marking a milestone in the company's staged restart of the operation. Core Lithium restarted mining at the Grants openpit in May and recommissioned the crushing circuit in August to build sufficient crushed ore stockpiles for processing. First concentrate was achieved within six months of the company's final investment decision to proceed with the Finniss restart. The company has undertaken targeted upgrades to debottleneck the processing circuit and optimise recoveries, including screen refurbishments, rolls crusher enhancements and improvements to the ferrosilicon distribution system. Crushing and dense media separation operations have been consolidated into a single control room. These upgrades are expected to increase plant throughput capacity by about 20% to 1.2 million t/y. Finniss began initial spodumene concentrate production in February 2023 before being placed on care and maintenance in mid-2024 amid a downturn in lithium prices. The project has since been repositioned as a lower-cost, long-life operation with a 20-year mine life and average production of 214,000 t/y. Finniss is the only major hard-rock lithium mine operating outside of Western Australia.
24 mins ago
[SMM News] DRC Moves to Tighten State Control Over Geological Data, Builds National Databank Covering Lithium
26 mins ago
[SMM News] DRC Moves to Tighten State Control Over Geological Data, Builds National Databank Covering Lithium
Read More
[SMM News] DRC Moves to Tighten State Control Over Geological Data, Builds National Databank Covering Lithium
[SMM News] DRC Moves to Tighten State Control Over Geological Data, Builds National Databank Covering Lithium
The Democratic Republic of Congo is accelerating geological mapping, airborne surveys and digitisation of historical records to build a national geological databank covering its critical minerals, including lithium, according to Raoul Wazenga Vitima, director general of the National Geological Survey of Congo (SGNC). A $180 million contract with geodata firm Xcalibur began in January and is surveying more than 700,000 sq km using airborne geophysics and data analytics to identify exploration targets across the country's largely unexplored territory. The programme is one of several ongoing mapping initiatives funded by the government, mining revenues and international partners, with results feeding into the national databank, which is expected to be fully operational by the end of 2026. SGNC estimates systematic exploration currently covers barely 20% of the country, meaning large areas holding potential lithium deposits remain unmapped. Congo hosts lithium deposits alongside other critical minerals, though exploration activity to date has been concentrated mainly in the country's copper-cobalt belt, leaving lithium-prospective ground comparatively underexplored. Unlike jurisdictions such as Australia, Congo plans to retain state control over access to the databank. Vitima said the system will operate on a tiered basis, with basic geological information available free of charge and access to more sensitive datasets fee-based, with revenues intended to fund continued exploration and mapping. He did not specify the fee structure or which data categories would be charged. Vitima said the database is not intended to favour any single trading partner and that access rules would apply equally to all companies regardless of origin. He said Congo also has geological survey partnerships with France's BRGM, South Africa's Council for Geoscience, KoBold Metals, Atlas Park, Japan's Solafune and Belgium's AfricaMuseum, and that Saudi Arabia is separately using Xcalibur for its own national geological mapping, with Congo sharing exploration experience with the kingdom.
26 mins ago
[SMM News] Sigma Lithium Says Brazil Operations Unaffected, No Legal Notice Received Over Alleged License Suspension
27 mins ago
[SMM News] Sigma Lithium Says Brazil Operations Unaffected, No Legal Notice Received Over Alleged License Suspension
Read More
[SMM News] Sigma Lithium Says Brazil Operations Unaffected, No Legal Notice Received Over Alleged License Suspension
[SMM News] Sigma Lithium Says Brazil Operations Unaffected, No Legal Notice Received Over Alleged License Suspension
On september 9th, Sigma Lithium has stated it has not received any legal communication regarding a preliminary judicial ruling that reportedly suspended environmental licences at its Grota do Cirilo mine in Brazil. The company said mining and industrial activities continue uninterrupted, with production targets unchanged at 240,000 mt of lithium oxide concentrate over the next 12 months, rising to 330,000 mt in the 2027 financial year. Sigma said the ruling was issued without due process and that it will begin its legal defence when courts resume normal operations on September 8, following a three-day national holiday recess. The company said it has consistently provided technical, environmental and quantitative data to authorities. The ruling stems from a civil suit brought by a Quilombola community federation, which argued the Grota do Cirilo project falls within the direct area of influence of the Bau Quilombola territory, a designation that would trigger a requirement for free, prior and informed consultation. The presiding judge cited studies placing the territory 2.7 km from the project's directly affected area, within an 8 km threshold that activates the more extensive licensing process, and pointed to blasting and earthmoving activity near the community as grounds for risk of harm. Sigma has argued the project lies outside the impact zone. The court has ordered an independent georeferencing review to determine the exact distance between the project and the Quilombola territory. Beyond the alleged suspension of environmental licences, the ruling bars Minas Gerais state from issuing new licences to the project and sets a fine for continued operations.
27 mins ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here
[SMM Weekly Review] Hydrometallurgical Recycling Market This Week: Pure Cobalt and Ternary Black Mass Payables Fell Steadily, LFP Prices Mostly Fluctuated (Sep. 7, 2026 - Sep. 10, 2026) - Shanghai Metals Market (SMM)