Koonenberry Defines Copper-Gold Drill Targets at Wilga Flats in New South Wales

Published: Sep 04, 2026 15:19 (GMT+8)

Koonenberry Gold has defined a series of high-priority copper-gold and gold drill targets at its wholly owned Wilga Flats Project in the Lachlan Fold Belt of New South Wales, Australia. The targets occur along the 4.2-km Olaf’s Trend, approximately 20 km north of Evolution Mining’s Cowal gold operation. The company said preparations for drilling are underway, with a drill rig secured and a permit application submitted.

The principal copper-gold target is supported by a 1.2 km by 500 m copper-in-soil anomaly, coincident with a gold anomaly measuring roughly 600 m by 100 m. Rock-chip sampling within the broader target returned copper grades of up to 1.37% and 1.27%. Koonenberry integrated soil geochemistry and rock-chip sampling with geological mapping, 3D magnetic modelling and a 15.6 line-km dipole-dipole induced-polarisation survey to identify priority drill positions along Olaf’s Trend.

A separate epithermal and base-metal target is also being evaluated using historical drilling and re-assayed core. Historical drilling returned 11.33 m at 2.05% combined lead and zinc from 190.52 m, while Koonenberry’s re-assaying of historical material returned 32 m at 0.10 g/t gold from 65 m. The company has also re-logged historical core dating back to 1977 to refine its geological interpretation and drill planning.

The latest update moves Wilga Flats into a more defined drill-preparation stage, with surface geochemistry and geophysical work identifying several copper-gold targets for testing. However, the project remains at an early exploration stage, and drilling will be required to determine whether the surface anomalies correspond to meaningful copper mineralisation at depth. The next key milestone will be commencement of the planned drilling programme and release of initial assay results.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Escondida Labor Mediation Fails to Reach Agreement, Union No. 2 Announces Strike Starting October 14
41 mins ago
Escondida Labor Mediation Fails to Reach Agreement, Union No. 2 Announces Strike Starting October 14
Read More
Escondida Labor Mediation Fails to Reach Agreement, Union No. 2 Announces Strike Starting October 14
Escondida Labor Mediation Fails to Reach Agreement, Union No. 2 Announces Strike Starting October 14
SMM, October 14: BHP and the Escondida copper mine Union No. 2 of Supervisors and Staff, representing approximately 1,020 supervisors and employees, failed to reach an agreement on a new collective contract during mandatory mediation, and the union has announced the start of a strike. As of the morning of October 14 Beijing time, the strike had not yet begun, but the union has confirmed that the strike will start at 8:00 a.m. Chile time on October 14, which is 7:00 p.m. Beijing time today.
41 mins ago
Enamelled Wire Industry Sees 67.42% Operating Rate in Sept 2026, Below Expectations
55 mins ago
Enamelled Wire Industry Sees 67.42% Operating Rate in Sept 2026, Below Expectations
Read More
Enamelled Wire Industry Sees 67.42% Operating Rate in Sept 2026, Below Expectations
Enamelled Wire Industry Sees 67.42% Operating Rate in Sept 2026, Below Expectations
According to an SMM survey, the comprehensive operating rate of the enamelled wire industry in September 2026 was 67.42%, down 0.53 percentage points MoM and down 0.7 percentage points YoY. Among them, the operating rate of large enterprises was 70.96%, medium-sized enterprises 57.42%, and small enterprises 66.91%, with overall industry operating performance falling short of market expectations.
55 mins ago
September operating rate fell short of expectations, with the strength of the October "peak season" yet to be tested
1 hour ago
September operating rate fell short of expectations, with the strength of the October "peak season" yet to be tested
Read More
September operating rate fell short of expectations, with the strength of the October "peak season" yet to be tested
September operating rate fell short of expectations, with the strength of the October "peak season" yet to be tested
According to an SMM survey, the comprehensive operating rate of the enamelled wire industry in September 2026 was 67.42%, down 0.53 percentage points MoM and down 0.7 percentage points YoY. Among them, the operating rate of large enterprises was 70.96%, medium-sized enterprises 57.42%, and small enterprises 66.91%, with overall industry operating performance falling short of market expectations.
1 hour ago