LME lead under pressure pulled back 0.86%, SHFE lead followed lower in night session, holding the Bollinger middle band [SMM Lead Morning News]

Published: Sep 03, 2026 08:47 (GMT+8)

SMM, September 3:

Overnight, the LME lead 3M contract drifted lower on September 2, opening at $1,913.0/mt. The center shifted gradually downward from the European session, and after dipping to a low of $1,891.5/mt near the close, it rebounded slightly to settle at $1,898.5/mt, down $16.5/mt or 0.86% from the previous trading day's closing price. The daily candlestick formed a solid bearish candle, giving back most of the prior day's gains, but still held above the middle Bollinger Band. The full-day trading range was $1,891.5-1,917.5/mt, with volume of 8,133 lots and open interest of 171,519 lots.

Overnight, the SHFE lead 2610 contract followed the LME in the doldrums during the night session, opening at 16,100 yuan/mt. The night session range was 16,075-16,155 yuan/mt, and it settled at 16,085 yuan/mt, down 70 yuan/mt or 0.43% from the previous trading day's closing price. Volume was 20,115 lots, and open interest rose by 1,140 lots to 65,818 lots. The daily candlestick formed a small bearish candle, but the closing price remained above the middle Bollinger Band.

Overnight, LME base metals were mixed, with LME lead down 0.86%, relatively weak within the complex. SHFE and LME pulled back in tandem, but neither broke below the middle Bollinger Band effectively.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Lumentum Commits $87 Million to Secure AXT’s InP Wafer Capacity Through 2031】
17 hours ago
【Flash | Lumentum Commits $87 Million to Secure AXT’s InP Wafer Capacity Through 2031】
Read More
【Flash | Lumentum Commits $87 Million to Secure AXT’s InP Wafer Capacity Through 2031】
【Flash | Lumentum Commits $87 Million to Secure AXT’s InP Wafer Capacity Through 2031】
AXT and Lumentum signed a binding capacity reservation agreement for Indium Phosphide (InP) wafer substrates through December 31, 2031. AXT will reserve minimum annual product capacity and support additional capacity, while Lumentum will provide two $43.5 million deposits, totaling $87 million, to be applied as shipment credits. Lumentum is liable for annual purchase shortfalls, subject to specified exceptions, while AXT’s failure to deliver minimum capacity constitutes a material breach. SMM views the six-year commitment as a firm demand signal for InP substrates and high-purity indium. Wafer volumes, diameter mix and corresponding indium consumption were not disclosed.
17 hours ago
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
20 hours ago
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
Read More
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
【Flash | Semtech Adds Cleanroom Space as InP Photonics Demand Ramps】
Semtech said in its Aug. 25 earnings presentation that its data-center photonics portfolio spans gain chips, high-power CW lasers, SOAs and high-speed photodiodes, while it has secured FY2027 equipment deliveries and acquired additional cleanroom space. Semtech acquired HieFo in March, adding US-based InP gain-chip and DFB-laser manufacturing. Q2 FY2027 data-center sales reached $100 million, up 39% QoQ and 91% YoY; Q3 sales are targeted to rise 45% QoQ and 160% YoY. SMM believes the buildout supports medium-term demand for InP and high-purity indium, although no nameplate capacity or indium consumption was disclosed.
20 hours ago
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
20 hours ago
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
Read More
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
【SMM Flash News】Bunker Hill Adds Metal Recovery Criteria to Its Year-End Commercial Production Target
Bunker Hill said on October 5 that its Idaho zinc-lead-silver mine remained on track to achieve commercial production by year-end 2026. The revised criteria require throughput of at least 65% of the plant’s 1,800-tonne-per-day nameplate capacity, alongside zinc, lead and silver recoveries of at least 70%, for 60 consecutive days. A 10-hole, 975-metre surface drilling programme has also started at Page.
20 hours ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here