Sibanye Secures 835MW Renewable Energy Portfolio to Support South African Operations

Published: Sep 2, 2026 15:52

[SMM Flash] Sibanye-Stillwater has secured 835MW of renewable electricity capacity through agreements with independent power producers as it continues to increase renewable energy supply to its South African mining operations. The portfolio comprises 43% solar and 57% wind capacity, with 164MW already in commercial operation and a further 671MW agreed and under construction.

The portfolio includes the operational 89MW Castle wind farm and 75MW Springbok solar project, while the 103MW Witberg and 140MW Umsinde wind farms are expected to come online around Q4 2026. Additional capacity includes 220MW from the Etana Energy portfolio, 138MW from the NOA portfolio and 70MW through Africa GreenCo, with these projects scheduled for 2027–28.

The investment highlights the growing role of renewable power in reducing the mining sector's exposure to grid constraints and conventional electricity supply. Sibanye noted that renewables are expected to provide more than half of South Africa's energy needs by 2028. The company's 835MW portfolio is comparable to the capacity of a large conventional power-generation unit, while being developed through a diversified pipeline of solar and wind projects.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Precious Metals Remain Range-Bound as Macro Enters Key Validation Window [SMM Precious Metals Macro Analysis]
Sep 11, 2026 17:43
Precious Metals Remain Range-Bound as Macro Enters Key Validation Window [SMM Precious Metals Macro Analysis]
Read More
Precious Metals Remain Range-Bound as Macro Enters Key Validation Window [SMM Precious Metals Macro Analysis]
Precious Metals Remain Range-Bound as Macro Enters Key Validation Window [SMM Precious Metals Macro Analysis]
Sep 11, 2026 17:43
Amigo Resources Reports PGM Values of Up to 7.07 ppm in Tanzania Processing Testwork​
Sep 11, 2026 16:30
Amigo Resources Reports PGM Values of Up to 7.07 ppm in Tanzania Processing Testwork​
Read More
Amigo Resources Reports PGM Values of Up to 7.07 ppm in Tanzania Processing Testwork​
Amigo Resources Reports PGM Values of Up to 7.07 ppm in Tanzania Processing Testwork​
[SMM Flash] Amigo Resources reported independent laboratory results from selected Tanzanian material showing combined PGM values of 6.94–7.07 ppm, alongside residual gold values of 3.27–3.47 ppm. The company said it is assessing the integration of proprietary PGM concentration technology into its processing flowsheets to target recovery from gravity tailings and other residual material. Amigo is also evaluating a pyrometallurgical copper-matte treatment route and has mobilised a small-scale furnace for further testwork.​ The programme could potentially establish PGMs as a recoverable by-product from Amigo's Tanzanian polymetallic material if subsequent metallurgical work demonstrates viable recoveries. However, the reported grades relate to selected test material and processing studies and do not constitute a compliant Mineral Resource, reserve or evidence of commercial-scale PGM production. Further metallurgical testing will therefore be important in determining whether the reported PGM content can translate into an economically recoverable product stream.
Sep 11, 2026 16:30
Pan Global Reports Platinum-Palladium Mineralisation at Spain's Cármenes Project
Sep 11, 2026 16:15
Pan Global Reports Platinum-Palladium Mineralisation at Spain's Cármenes Project
Read More
Pan Global Reports Platinum-Palladium Mineralisation at Spain's Cármenes Project
Pan Global Reports Platinum-Palladium Mineralisation at Spain's Cármenes Project
[SMM Flash] Pan Global Resources has reported additional drilling results from its 100%-owned Cármenes Project in northern Spain, identifying platinum and palladium within a broader gold-copper-nickel-cobalt mineralised system. Hole PVD15 intersected 15 m grading 3.90 g/t gold, 0.04% copper, 0.11% nickel and 0.12% cobalt from surface, including an 8 m interval grading 0.50 g/t platinum and 0.28 g/t palladium. Within this interval, one metre returned 1.39 g/t platinum and 0.74 g/t palladium, equivalent to 2.13 g/t Pt+Pd. The mineralisation extends beyond the historical Providencia mine workings and remains open along strike and at depth, according to the company. The results provide further evidence of PGM mineralisation within the Cármenes polymetallic system and could potentially add platinum and palladium credits to the project's mineral inventory. However, the reported intersections are exploration results and do not represent a Mineral Resource, reserve or future production estimate.
Sep 11, 2026 16:15
[SMM Flash] Sibanye-Stillwater has secured 835MW of renewable electri - Shanghai Metals Market (SMM)