Sibanye’s Recycling Operations Lift PGM Volumes and Generate US$164m in Cash Flow

Published: Sep 2, 2026 15:45

[SMM Flash] Sibanye-Stillwater’s recycling operations delivered strong earnings and cash generation in the first half of 2026, supported by higher recycled volumes and an expanded regional supply chain. The business recycled and sold 2.8 million oz of precious metals, up 142% year on year, including 195,000 oz of 5E PGMs, 95,000 oz of gold and 2.5 million oz of silver.

Adjusted EBITDA reached US$103 million (R1.7 billion), up 11% year on year and 536% excluding the Section 45X tax credit recorded in the prior-year period. Notional free cash flow stood at US$164 million (R2.7 billion), with a 63% adjusted EBITDA conversion rate. Feed volumes also increased significantly, with the Pennsylvania site's volumes more than doubling to 2.2 million oz while the North Carolina acquisition contributed a further 0.5 million oz.

The results highlight the growing contribution of recycling as a source of secondary PGM supply, while providing Sibanye with a capital-light earnings stream. The company's US recycling platform processed material containing platinum, palladium, iridium and ruthenium alongside gold, silver and copper, strengthening its exposure to diversified precious-metal flows.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Platinum futures maintain a consolidation pattern, spot market trading is normal [SMM daily review]
15 hours ago
Platinum futures maintain a consolidation pattern, spot market trading is normal [SMM daily review]
Read More
Platinum futures maintain a consolidation pattern, spot market trading is normal [SMM daily review]
Platinum futures maintain a consolidation pattern, spot market trading is normal [SMM daily review]
15 hours ago
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Sep 14, 2026 16:18
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Read More
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
Greenland Mines Completes 104.8-Tonne Bulk Sampling Programme at Skaergaard PGM Project
[SMM Flash] Greenland Mines has completed a 104.8-tonne bulk-sampling programme across seven sites at its Skaergaard palladium-platinum-gold project in East Greenland. The samples are being prepared for large-scale and pilot-scale metallurgical testwork at GTK Mintec in Finland, while the company continues engineering, processing, infrastructure and waste-management studies aimed at advancing the project's technical evaluation. Skaergaard's S-K 1300 resource currently comprises approximately 15.0 million oz PdEq Indicated and 17.49 million oz PdEq Inferred, according to Greenland Mines. The bulk-testing programme represents an important step in evaluating processing and recovery options for one of the larger undeveloped palladium-platinum-gold systems outside the major South African, Zimbabwean and Russian supply regions. However, the reported Mineral Resources are not Mineral Reserves and the latest programme does not constitute a development or commercial production decision.
Sep 14, 2026 16:18
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Sep 14, 2026 16:05
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Read More
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
Two Rivers Advances Validation Work for Merensky Project, Potential Output at 182,000 6E oz/year
[SMM Flash] Two Rivers, the South African PGM joint venture between African Rainbow Minerals and Impala Platinum, is advancing technical validation work for its Merensky project on the eastern limb of the Bushveld Complex. Early-works capital was approved during FY2026 to complete studies required to determine the project's way forward. The Merensky concentrator was commissioned during the six months to December 2024 but was subsequently placed on care and maintenance amid challenging PGM market conditions. The project has a stated capital cost of approximately R7.3 billion and is designed to produce around 182,000 6E PGM oz/year at steady state, alongside approximately 1,600 tonnes/year of nickel and 1,300 tonnes/year of copper. A restart could therefore provide meaningful incremental PGM supply from an existing South African operation. However, the project remains under technical validation and no restart date or final decision to resume production has been announced.
Sep 14, 2026 16:05