QMines has reported another broad copper intersection from its ongoing 10,000-metre drilling programme at the Mt Chalmers Copper and Gold Project in Queensland, Australia. Drill hole 26MCRD006 returned 32 metres at 1.99% copper, 0.39 g/t gold and 2.6 g/t silver from 138 metres, including 7 metres at 4.18% copper, with a peak one-metre interval of 11.3% copper.
The same hole also returned 7 metres at 2.14% copper and 1.00 g/t gold from 163 metres, while a separate shallow polymetallic zone in hole 26MCDD008 returned 25 metres at 2.08 g/t gold, 92 g/t silver, 2.56% zinc and 0.19% copper from 56 metres. QMines said the latest drilling is helping improve its understanding of both the deeper copper-gold-dominant portion of the Mt Chalmers system and the shallower polymetallic lenses. All reported intervals are down-hole lengths, with true widths yet to be determined.
The latest assays follow earlier August results from the project, including 35 metres at 2.88% copper, 0.75 g/t gold and 3.3 g/t silver from 107 metres. The current drilling programme is supporting technical work for the project’s Definitive Feasibility Study, while additional assays from further completed holes are still pending.
The latest results provide further geological and technical information as QMines advances the Mt Chalmers DFS and continue to demonstrate broad zones of copper mineralisation within the project. However, the drilling remains part of the project-definition and feasibility process, meaning any eventual impact on resources, mine design or future copper production will depend on further drilling, modelling and completion of the feasibility work.



