Astec Commissions Lüderitz Ship Loader Capable of Handling Zinc and Lead Products

Published: Aug 26, 2026 09:46 (GMT+8)

Astec Industries has completed delivery, assembly and commissioning of a bulk-materials handling and ship-loading system for Autoforce at Lüderitz port in Namibia. The installation is the first Telestack ship loader at the port and in Namibia. The system includes an HF18 wheeled hopper feeder, a TB58 radial telescopic ship loader, a 12-metre steel telescopic freefall chute and a 360-degree trimmer/deflector chute, with designed handling capacity of up to 1,500 t/h for Handy and Supramax vessels.

Originally procured for manganese ore, the system has also been used to load zinc and lead products for port customers. Astec said the first vessel loading achieved twice the feed rate of the previous conventional loading method. The source did not disclose zinc- or lead-specific throughput, customers or export volumes.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Data: SHFE, DCE market movement (Nov 09)
22 mins ago
Data: SHFE, DCE market movement (Nov 09)
Read More
Data: SHFE, DCE market movement (Nov 09)
Data: SHFE, DCE market movement (Nov 09)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 09 Nov , 2026
22 mins ago
Henan Jinli's RMB 3B High-Purity Zinc Project for EVs Nears Completion, Targets July 2027 Mass Production
3 hours ago
Henan Jinli's RMB 3B High-Purity Zinc Project for EVs Nears Completion, Targets July 2027 Mass Production
Read More
Henan Jinli's RMB 3B High-Purity Zinc Project for EVs Nears Completion, Targets July 2027 Mass Production
Henan Jinli's RMB 3B High-Purity Zinc Project for EVs Nears Completion, Targets July 2027 Mass Production
According to media reports on November 5, Henan Jinli Group's 150,000-tpy industrial demonstration project for high-purity zinc used in new energy vehicles and ships has entered the equipment installation and commissioning stage. The project involves a total investment of RMB 3 billion, with approximately 70% of the investment completed. Civil construction is 85% complete, and all major equipment has been ordered.According to the project schedule, construction is expected to be completed in June 2027, with mass production commencing in July.
3 hours ago
Korea Zinc Q3 2026: Revenue Up 46.3% YoY, Operating Profit Falls 48.2% Due to Lower Metal Prices
3 hours ago
Korea Zinc Q3 2026: Revenue Up 46.3% YoY, Operating Profit Falls 48.2% Due to Lower Metal Prices
Read More
Korea Zinc Q3 2026: Revenue Up 46.3% YoY, Operating Profit Falls 48.2% Due to Lower Metal Prices
Korea Zinc Q3 2026: Revenue Up 46.3% YoY, Operating Profit Falls 48.2% Due to Lower Metal Prices
On November 4, Korea Zinc released its financial results for the third quarter of 2026. Revenue reached KRW 6.09 trillion, up 46.3% YoY, while operating profit fell 48.2% YoY to KRW 141.7 billion, down sharply by 75.9% from KRW 587.1 billion in the second quarter. The operating margin declined from 6.6% to 2.3%. Net profit increased 218.6% YoY to KRW 225.4 billion. The company attributed the pressure on profitability to lower metal prices, a weaker Korean won and upfront investment costs associated with its US smelter.
3 hours ago