Shenzhen Sunxing Subsidiary to Invest 400M in Aluminum-based New Materials Project in Huzhou

Published: Aug 19, 2026 09:38
Shenzhen Sunxing announced that its wholly-owned subsidiary, Zhejiang Sunxing Lingchuan New Materials Technology Co., Ltd., plans to sign the 《Project Investment Agreement》 with the Management Committee of the Yangtze River Delta (Huzhou) Industrial Cooperation Zone to invest in the construction of an aluminum-based high-end new materials project. The project is expected to have a capacity of 10kt, cover an area of approximately 150 mu, and have a construction period of 18 months, with the first phase investment of 400 million yuan to build a demonstration production line with an annual capacity of 20kt for the aluminum-based high-end new materials project. This investment has been approved by the board of directors and does not need to be submitted to the shareholders' meeting for approval.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China Recycling Meets You at SMM (3rd) South China Nonferrous Metals Annual Conference 2026
4 mins ago
China Recycling Meets You at SMM (3rd) South China Nonferrous Metals Annual Conference 2026
Read More
China Recycling Meets You at SMM (3rd) South China Nonferrous Metals Annual Conference 2026
China Recycling Meets You at SMM (3rd) South China Nonferrous Metals Annual Conference 2026
4 mins ago
Metro Mining Ships 700,000 WMT Bauxite in July Despite OFT Outage; Maintains 2026 Guidance
11 mins ago
Metro Mining Ships 700,000 WMT Bauxite in July Despite OFT Outage; Maintains 2026 Guidance
Read More
Metro Mining Ships 700,000 WMT Bauxite in July Despite OFT Outage; Maintains 2026 Guidance
Metro Mining Ships 700,000 WMT Bauxite in July Despite OFT Outage; Maintains 2026 Guidance
[SMM Aluminum Express News] Metro Mining shipped 700,000 WMT of bauxite from its Bauxite Hills Mine in July 2026, despite a temporary outage of its offshore floating terminal (OFT) Ikamba. The Ikamba was taken offline on 20 July to replace four large hydraulic cylinders on Crane 1, returned to service on 27 July, and resumed full-capacity operations on 30 July. Metro deployed geared vessels during the outage to minimise the impact on shipments. Metro also reported 1 million BCM of waste stripping year-to-date, up 140% year on year, following investment in additional equipment and productivity improvements. The higher stripping rate is intended to provide more consistent ore supply as the company increases shipping volumes. Metro maintained its 2026 shipment guidance of 6.6–7.1 million WMT, implying a substantial increase in shipments will be required during the remainder of the year.
11 mins ago
Yangquan Aims for Energy Transition and Industrial Upgrading in 15th Five-Year Plan
48 mins ago
Yangquan Aims for Energy Transition and Industrial Upgrading in 15th Five-Year Plan
Read More
Yangquan Aims for Energy Transition and Industrial Upgrading in 15th Five-Year Plan
Yangquan Aims for Energy Transition and Industrial Upgrading in 15th Five-Year Plan
The Publicity Department of the CPC Shanxi Provincial Committee and the Information Office of the People’s Government of Shanxi Province held the third press conference of the series themed “Starting the 15th Five-Year Plan on a Solid Footing,” briefing on Yangquan City’s economic and social development plan and key arrangements for the 15th Five-Year Plan period. Centering on energy transition, Yangquan will keep a firm hold on the basic foundation of stable production and supply, promote the transformation of coal from fuel to high-value-added materials, coordinate the integrated layout of wind, solar, thermal power, and energy storage, and build a national-level zero-carbon industrial park to high standards. By the end of the 15th Five-Year Plan period, the city’s installed renewable energy capacity is expected to reach 4.8 million kW, and its energy storage capacity will exceed 2 million kW. At the same time, it will focus on industrial upgrading, with an emphasis on cultivating three ten-billion-yuan-level industrial clusters: aluminum deep processing, calcium-based materials, and new-type battery materials. Among them, the output value of the aluminum deep processing industry is projected to surpass 30 billion yuan by 2030, while calcium-based materials will reach 15 billion yuan, and new-type battery materials will reach 15 billion yuan.
48 mins ago