PV Module Scheduled Production Slightly Up MoM Underpins Frame Production Starts; Aluminum Prices Expected to Consolidate on a Strong Note in Short Term Amid Macro Fundamental Tug-of-War Between Longs and Shorts [SMM Analysis]

Published: Aug 06, 2026 23:05 (GMT+8)

SMM August 6 –

PV Aluminum Extrusion: Within this week’s surveyed sample, PV frame enterprises primarily focused on executing orders on hand, with the industry’s operating rate remaining stable. Some top-tier players continued to stay high. During the week, the supply-demand pattern of downstream PV modules showed no significant changes. The August production schedule for PV module enterprises is expected to edge up MoM from July, providing a stable demand floor for the operating rates of PV frame enterprises. In the near term, the operating rate of PV frame enterprises is expected to continue stable operations.

Raw Material Prices: During the period (August 3–August 6, 2026), the SMM A00 weekly average price stood at 23,680 yuan/mt, up 1.4% WoW from the previous period. Overall, divergences persisted in the Middle East situation. Although the US Fed did not raise interest rates in July, its overall stance remained hawkish. Fundamentals continued their deficit, with aluminum ingot inventory destocking. In the short term, aluminum prices are expected to consolidate on a strong note. Next week, the most-traded SHFE aluminum contract is expected to trade within the range of 23,200–24,200 yuan/mt, while LME aluminum is expected to trade within the range of $3,100–$3,250/mt. Going forward, close attention should be paid to the progress of production resumptions and new project commissioning plan dynamics in the Middle East.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

Images in this article contain AI-translated captions for reference only.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM PV Flash] Energiequelle Sells French Unit and 500 MW Renewables Portfolio to H2air
4 hours ago
[SMM PV Flash] Energiequelle Sells French Unit and 500 MW Renewables Portfolio to H2air
Read More
[SMM PV Flash] Energiequelle Sells French Unit and 500 MW Renewables Portfolio to H2air
[SMM PV Flash] Energiequelle Sells French Unit and 500 MW Renewables Portfolio to H2air
Energiequelle has completed the sale of its French subsidiary, Energiequelle SAS, to French developer and operator H2air for an undisclosed amount. The transaction includes the local team and an approximately 500 MW wind and solar portfolio, comprising about 60 MW in operation and additional projects at advanced pre-construction stages. Energiequelle described the divestment as part of a strategic refocus on core markets, while H2air will retain the employees and continue developing the assets.
4 hours ago
[SMM PV Flash] Play Signs 15-Year Wind and Solar PPA with Qair in Poland
4 hours ago
[SMM PV Flash] Play Signs 15-Year Wind and Solar PPA with Qair in Poland
Read More
[SMM PV Flash] Play Signs 15-Year Wind and Solar PPA with Qair in Poland
[SMM PV Flash] Play Signs 15-Year Wind and Solar PPA with Qair in Poland
Polish telecom operator Play has signed a 15-year physical PPA with Qair Polska for about 35 GWh of wind and solar electricity annually, or roughly 525 GWh over the contract term. Supply will come from Qair-operated wind and photovoltaic plants in Poland and will include EKOenergy-labelled guarantees of origin. The agreement gives Play long-term renewable supply visibility while supporting the financing of new renewable capacity.
4 hours ago
[SMM PV Flash] Greenvolt Starts Construction of 600 MW/2.4 GWh Polish BESS
4 hours ago
[SMM PV Flash] Greenvolt Starts Construction of 600 MW/2.4 GWh Polish BESS
Read More
[SMM PV Flash] Greenvolt Starts Construction of 600 MW/2.4 GWh Polish BESS
[SMM PV Flash] Greenvolt Starts Construction of 600 MW/2.4 GWh Polish BESS
Greenvolt has started construction of the 600 MW/2.4 GWh Siedlce battery energy storage project in Poland, with commercial operation targeted by the end of 2027. The design includes 210 battery containers and 105 transformer containers with power-conversion systems, with BYD Energy Storage supplying the battery technology and P&Q and ONDE supporting electrical infrastructure. Together with the operating Turośń Kościelna project and the Ełk project due online in the fourth quarter, the three assets will total 1 GW/4 GWh.
4 hours ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here