First Quantum Boosts Zambian Copper Output by 5% in H1 2026, On Track for Annual Targets

Published: Jul 30, 2026 15:58

First Quantum Minerals produced 184,929 tonnes of copper in Zambia during the first half of 2026, marking a 5% year-over-year increase from 176,116 tonnes recorded in H1 2025. This performance keeps the country's largest copper producer firmly on track to meet its full-year guidance.

The growth was driven by solid operational outputs across both of its primary Zambian assets. Kansanshi reached 89,342 tonnes in H1—up from 86,647 tonnes in H1 2025—supported by strong processing throughput in its S3 expansion circuit. Sentinel also delivered higher volume, producing 95,587 tonnes compared to 89,469 tonnes in the same period last year.

Following the H1 results, First Quantum maintained its 2026 production guidance of up to 205,000 tonnes for Kansanshi and 220,000 tonnes for Sentinel. Reaching these targets would push the company’s total annual output past 370,000 tonnes, exceeding the 361,000 tonnes produced locally in 2025. For H2, the miner anticipates stronger performance driven by higher plant throughput, improved recovery rates, and elevated ore grades at Sentinel.

As First Quantum operations accounted for 41% of Zambia's 890,346 tonnes total output in 2025, this continued momentum plays a central role in supporting the Zambian government’s ambitious target to exceed 1 million tonnes of national copper production in 2026.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
10 hours ago
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Read More
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
Economic Improvement of the Boumadine Polymetallic Mine in Morocco
10 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
12 hours ago
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Read More
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
Panguna Copper-Gold Mine Camp Attacked, Highlighting Security Risks to Redevelopment
The Autonomous Bougainville Government said the Lloyds Panguna Metals & Energy Limited camp at the Panguna copper-gold mine was attacked on September 13. Personnel were assaulted and machinery was damaged in an arson attack. Authorities have not disclosed the extent of injuries or equipment losses. President Ishmael Toroama condemned the incident and said the government would continue pursuing the mine’s redevelopment.
12 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
12 hours ago
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
Read More
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
NICICO Puts Iran’s Copper Ore Resources at 24.5bn Tonnes; Exploration Drilling Nears 200,000 Metres
According to Iranian media reports citing Seyed Mostafa Feiz, CEO of the National Iranian Copper Industries Company (NICICO), Iran’s geological copper ore resources rose to 24.5 billion tonnes from 22.2 billion tonnes at the start of the Iranian year, up 10.6%. Mineable (designable) reserves increased to 18.2 billion tonnes from 16.8 billion tonnes, while 198,462 metres of exploration drilling were completed in the first five months—about 40% of the 500,000-metre full-year target. At Miduk, mineable reserves rose 123% to 1.77 billion tonnes and geological resources increased 186% to 2.883 billion tonnes. The Sarcheshmeh cluster’s mineable reserves reached 7.7 billion tonnes at an average grade of 0.41%, with the mine’s operating permit extended through Iranian year 1429 (around 2050–51). Total material extracted during the period exceeded 153 million tonnes, up about 4% year on year; this figure includes sulphide ore, oxide material and waste rock, and is not copper production. The expanded resource and reserve base supports Iran’s longer-term development potential, but does not imply an immediate increase in supply.
12 hours ago
First Quantum Minerals produced 184,929 tonnes of copper in Zambia dur - Shanghai Metals Market (SMM)