Sigma Lithium Reportedly Suspends Production for More Than 10 Days

Published: Jul 24, 2026 10:40 (GMT+8)

According to market sources, Sigma Lithium’s Grota do Cirilo project in Minas Gerais, Brazil, has reportedly been offline for more than 10 consecutive days. The information has not yet been officially confirmed by Sigma, but it is broadly consistent with recent regulatory developments.

On 22 July, Sigma announced that it was negotiating a Conduct Adjustment Agreement, or TAC, with the Minas Gerais state government in response to a penalty notice issued by the regional environmental authority, SUPRAM. The company expects to pay fines of up to approximately US$540,000 and invest around US$1 million in remediation measures to restore activities that are currently described as “partially and temporarily suspended.”

The waste-rock piles at Grota do Cirilo have previously been subject to repeated reviews by Brazilian labour and environmental authorities. Although Brazil’s National Mining Agency had concluded that the relevant waste piles did not present an imminent geotechnical risk, the restrictions imposed by the labour authorities were not automatically lifted. A May inspection reportedly found that the project was continuing to use one of the restricted waste piles.

Sigma produced 35,000 tonnes of lithium concentrate in the second quarter, above its previous target of 33,000 tonnes. However, this production figure reflects operating conditions before the formal regulatory notice was delivered and therefore does not represent the project’s third-quarter operating status.

The key issue affecting Sigma’s supply outlook is no longer the size of the fine, but the timing of the TAC agreement, the scope of the operational suspension and the regulatory inspection process required before production can resume. Market participants should closely monitor the actual third-quarter production performance at Grota do Cirilo, as well as progress towards the scheduled commissioning of the project’s Phase 2 expansion.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Sanxia New Material to Buy 53.14%+ Stake in Zhuhai Saiwei; Shares Halted]
2 hours ago
[Sanxia New Material to Buy 53.14%+ Stake in Zhuhai Saiwei; Shares Halted]
Read More
[Sanxia New Material to Buy 53.14%+ Stake in Zhuhai Saiwei; Shares Halted]
[Sanxia New Material to Buy 53.14%+ Stake in Zhuhai Saiwei; Shares Halted]
On September 28, Sanxia New Material announced that it plans to acquire no less than 53.14% of Zhuhai Saiwei Electronic Materials Co., Ltd. by issuing shares and paying cash, a deal expected to constitute a major asset restructuring. The company’s shares will be suspended from September 29, 2026, with the suspension expected to last no more than 10 trading days. The target company is mainly engaged in the R&D and production of electronic specialty materials such as lithium-ion battery electrolytes and new membrane materials, and holds a hazardous chemicals production license.
2 hours ago
[CAAM on FAW-GAC Strategic Cooperation: Calls for Better Support Policies]
2 hours ago
[CAAM on FAW-GAC Strategic Cooperation: Calls for Better Support Policies]
Read More
[CAAM on FAW-GAC Strategic Cooperation: Calls for Better Support Policies]
[CAAM on FAW-GAC Strategic Cooperation: Calls for Better Support Policies]
On September 29, the China Association of Automobile Manufacturers (CAAM) published an article titled “FAW and GAC’s Strategic Cooperation Provides a New Model for High-Quality Industrial Development.” It said that, objectively speaking, corporate equity cooperation and strategic restructuring involve assets, personnel, debt, and local interests. Cross-regional integration still faces practical problems such as the transfer of production capacity quotas, tax revenue sharing, and long approval chains, which to some extent constrain industrial consolidation and high-end development. CAAM will continue to serve as a bridge between the government and enterprises, promptly collect and report the difficulties and demands encountered by enterprises during integration, and call on relevant parties to improve supporting policies in areas such as capacity replacement, tax revenue sharing, asset disposal, and personnel resettlement, so as to clear obstacles for market-based integration. At the same time, CAAM will strengthen operations monitoring and industry self-discipline, promote typical experience in resource integration, guide enterprises toward rational development, orderly competition, and collaborative innovation, and foster an industrial ecosystem featuring survival of the fittest and collaborative progress. This will inject stronger momentum into the high-quality development of China’s intelligent connected new energy vehicle industry and accelerate the building of a world automotive power.
2 hours ago
Tinci's 6-Production Line Battery Recycling Project Under Review in Jiujiang, Jiangxi
3 hours ago
Tinci's 6-Production Line Battery Recycling Project Under Review in Jiujiang, Jiangxi
Read More
Tinci's 6-Production Line Battery Recycling Project Under Review in Jiujiang, Jiangxi
Tinci's 6-Production Line Battery Recycling Project Under Review in Jiujiang, Jiangxi
【East China's Jiangxi (Jiujiang): Tinci's 6 Production Lines Battery Recycling Project】According to an environmental impact report disclosure, a waste lithium battery resource recycling project has been accepted for review. The project is located in the Jinshawan Zone, Hugao County High-tech Industrial Park, Jiujiang, Jiangxi. It is designed with six processing systems: a renovation system for waste LFP iron battery material recycling (two LFP battery pre-treatment lines, one cathode sheet pre-treatment line, and one hydrometallurgical recovery line), a new waste LFP battery pack cascade utilization system (one cascade utilization production line), a new waste battery and electrode sheet pre-treatment system (one LFP battery pre-treatment line, one ternary battery pre-treatment line, and one LFP cathode sheet pre-treatment line), a new iron phosphate hydrometallurgical recovery system, a new nickel-cobalt-manganese salt production system, and a new lithium carbonate production system (two high-purity lithium carbonate lines and one battery-grade lithium carbonate line).
3 hours ago