Hongbo Group Shines at SMM CCAE 2026 (15th) Copper Industry Conference

Published: Jul 20, 2026 14:00

As the first year of the "15th Five-Year Plan," 2026 marks a critical stage for the global copper industry, characterized by supply-demand restructuring, technological innovation, and green transformation. Constrained by resources, costs, and geopolitics, copper supply growth remains limited. Meanwhile, new energy, new-type power grids, and AI computing power are driving substantial copper demand, widening the supply-demand gap and heightening copper's strategic value. Leveraging the "Implementation Plan for High-Quality Development of the Copper Industry (2025–2027)," China's domestic copper industry is accelerating its high-end, intelligent, and green transformation.

Against this backdrop, , will be held on October 28-30 at the Shangri-La Hotel, Nanchang, Jiangxi. Shanghai Metals Market (SMM), together with Jiangsu Hongbo Gas Equipment Technology Group Co., Ltd., invites you to attend. The conference focuses on the high-quality development of the copper industry, bringing together stakeholders from industry, research, and finance to discuss technological innovation and resource synergy, thereby shifting China's copper industry from scale advantage to dual leadership in technology and value.

Click the to register now; we look forward to meeting you at the conference.

Application of Nitrogen Generators in the Entire Copper Processing Industry Chain (Primarily PSA Nitrogen Generation, with Purification Units and Hydrogen-Nitrogen Ratio Control)

Copper easily oxidizes, blackens, rusts, and forms scale at high temperatures. Nitrogen, as an inert protective gas, isolates oxygen and moisture and is an essential gas source for melting and casting, wire drawing, annealing, copper pipe & tube and strip, electronic copper foil, and furnace purging. On-site nitrogen generation replaces liquid nitrogen/nitrogen cylinders, significantly lowering gas costs.

Product Introduction

Fully Automatic PSA Nitrogen Generator

Nitrogen purity adjustable 99.5%–99.999%
Flow rate 5–1,000 Nm³/h

PSANitrogen Generator + Carbon Deoxidation Purification Unit

Nitrogen oxygen content 1–10 ppm
Flow rate 30–1,000 Nm³/h
Nitrogen dew point ≤ -60°C

PSANitrogen Generator + Hydrogenation Deoxidation Purification Unit

Nitrogen oxygen content 0.3–10 ppm
Flow rate 30–1,000 Nm³/h
Nitrogen dew point ≤ -60°C

Ammonia Decomposition Hydrogen Generation and Fully Automatic Hydrogen-Nitrogen Ratio Control Unit

Hydrogen content optionally adjustable
Ratio precision ≤ ±0.5%
Flow rate 5–350 Nm³/h

Advantages of the Nitrogen Generator Solution (Compared with Externally Purchased Liquid Nitrogen)

1. Continuous and stable gas supply, eliminating the risk of production halts due to gas interruptions;
2. Long-term operating cost only 1/3 to 1/4 of liquid nitrogen;
3. Pressure, purity, and flow rate automatically adjustable, matching the operating conditions of annealing furnaces/melting furnaces;
4. Skid-mounted integrated design, adapted to the dusty and high-temperature environment of copper plants, supporting 24-hour unattended operation.

I. Melting and Casting Process (Upward-drawing copper rod, continuous casting, medium-frequency melting)

1. Liquid surface sealing protection for melting furnace
2. Furnace body replacement, furnace washing, purging
3. Nitrogen protection specifically for upward-drawing bare bright copper rod

II. Bright Annealing (The largest gas-consuming station in the copper industry)

After cold working, copper wire, copper strip, copper pipe & tube, copper busbar, brass/phosphor bronze harden; annealing at 400–650℃ to relieve stress. Without nitrogen protection, the surface becomes black and scale forms.

III. Wire Drawing, Copper Foil, and Precision Copper Semis Production

1. Intermediate annealing for heavy/medium/micro drawing
2. Electronic copper foil, ultra-thin copper strip
3. Hollow copper pipe & tube, precision alloy copper

IV. Other Supporting Process Applications

1. Sintering of powder metallurgy copper parts
2. Finished product packaging, anti-oxidation storage
3. Hydraulic/pneumatic purging, leak detection
Contact Information
Li Lili 189 1264 4498


Scan to Register


SMM Conference Contact

Liu Mingkang
156 5309 0867
liumingkang@smm.cn

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

Images in this article contain AI-translated captions for reference only.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
AI Computing Power Demand Boom Fuels Continuous Climb in Copper Foil Operations; Copper Cable High-Speed Connectors Strengthen, Taichenguang Leads Gains [SMM Express]
6 hours ago
AI Computing Power Demand Boom Fuels Continuous Climb in Copper Foil Operations; Copper Cable High-Speed Connectors Strengthen, Taichenguang Leads Gains [SMM Express]
Read More
AI Computing Power Demand Boom Fuels Continuous Climb in Copper Foil Operations; Copper Cable High-Speed Connectors Strengthen, Taichenguang Leads Gains [SMM Express]
AI Computing Power Demand Boom Fuels Continuous Climb in Copper Foil Operations; Copper Cable High-Speed Connectors Strengthen, Taichenguang Leads Gains [SMM Express]
6 hours ago
Tertiary Minerals Completes Phase 4 Drilling at Zambia’s Mushima North Copper Project
6 hours ago
Tertiary Minerals Completes Phase 4 Drilling at Zambia’s Mushima North Copper Project
Read More
Tertiary Minerals Completes Phase 4 Drilling at Zambia’s Mushima North Copper Project
Tertiary Minerals Completes Phase 4 Drilling at Zambia’s Mushima North Copper Project
Tertiary Minerals Plc has completed its Phase 4 drilling programme at Target A1 within the Mushima North Project in Zambia, with early portable X-Ray Fluorescence (pXRF) results identifying further copper mineralisation and supporting previously identified higher-grade zones.​ The Phase 4 programme comprised 3,639 m of drilling across 39 holes. Early results included an intersection of 15 m grading 0.53% copper from 100 m depth, including 7 m at 0.77% copper. Additional intersections included 4 m at 0.68% copper and 8 m at 0.62% copper, while broader infill intersections returned 65 m at 0.23% copperand 83 m at 0.16% copper.​ Mushima North is a polymetallic silver-copper-zinc prospect located within Zambia’s prospective Iron-Oxide-Copper-Gold region, approximately 28 km east of the historic Kalengwa copper-silver mine. The latest drilling supports the previously identified near-surface Exploration Target of 15–30 million tonnes grading 40–60 g/t silver equivalent, while also providing further indications of higher-grade copper and silver mineralisation within the target area.​ Samples from the drilling programme have been submitted for independent laboratory testing, with certified results expected to be released as they become available. Remaining pXRF results from the final nine holes are also expected, covering additional infill drilling at Target A1 and exploration of mineralisation west of Target A1 and at Target A2.​ With Phase 4 drilling now complete, the project is moving into its next stage of technical evaluation. Initial metallurgical testwork is expected to commence shortly, followed by data compilation and resource modelling. Tertiary Minerals is targeting the delivery of a JORC-compliant Mineral Resource Estimate for Mushima North before the end of 2026, which would provide a clearer assessment of the scale and grade distribution of the mineralised system following the latest drilling campaign.
6 hours ago
Copper Mineralisation Extends Beyond Current Resource at Zambia’s Mumbezhi Project
7 hours ago
Copper Mineralisation Extends Beyond Current Resource at Zambia’s Mumbezhi Project
Read More
Copper Mineralisation Extends Beyond Current Resource at Zambia’s Mumbezhi Project
Copper Mineralisation Extends Beyond Current Resource at Zambia’s Mumbezhi Project
According to foreign media reports, step-out drilling at the Nyungu Central deposit within Zambia’s Mumbezhi Copper Project has returned further copper intersections, extending a newly identified mineralised zone southeast beyond the boundaries of the current Mineral Resource Estimate (MRE).​ Recent drilling returned 65.8 m grading 0.42% copper from 226 m, including higher-grade intervals of 17.0 m at 0.58% copper and 13.2 m at 0.82% copper. A separate intersection returned 29.6 m grading 0.34% copper from 237 m, including 5.2 m at 0.80% copper. The results extend the known copper system outside the current resource estimate and provide additional targets for continued exploration.​ A total of 16 Phase 3 diamond drill holes covering 4,723 m have so far been completed at the southern end of Nyungu Central, while priority assay results remain pending for seven holes. In addition, a 6,200 m infill diamond drilling programme commenced at Nyungu Central in late July, supported by an additional drill rig now on site.​ Exploration is also continuing across the wider Mumbezhi Project, with four diamond drill rigs currently operating. Three are focused on Nyungu Central, while another is drilling at the regional Sharamba prospect, where exploration is targeting shallow copper mineralisation associated with a strong airborne electromagnetic anomaly. Visual copper mineralisation has been observed in five holes drilled along approximately 700 m of strike on the western side of the anomaly.​ The latest intersections further extend the known copper mineralisation beyond the existing Nyungu Central resource boundaries, while several priority assay results remain outstanding. Continued step-out and infill drilling will provide further indications of the scale and continuity of the mineralised system and its potential to support future resource expansion at Mumbezhi.
7 hours ago