[Solid-State Battery: Del Corporation Builds Solid-State Battery PACK Pilot Production Line]

Published: Jul 16, 2026 16:45
[Solid-state Battery: Dellner Completes Solid-state Battery PACK Pilot Line] On July 9, 2026, Dellner stated that the solid-state battery PACK pilot line had been completed, and it aims to complete the battery cell pilot line by the end of September 2026.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Mass Commissioning of 100-mt-Class All-Solid-State Battery Production Lines, 2027 Vehicle Installation Demonstration Becomes Industry Consensus [SMM Solid-State Battery Weekly Analysis]
2 hours ago
Mass Commissioning of 100-mt-Class All-Solid-State Battery Production Lines, 2027 Vehicle Installation Demonstration Becomes Industry Consensus [SMM Solid-State Battery Weekly Analysis]
Read More
Mass Commissioning of 100-mt-Class All-Solid-State Battery Production Lines, 2027 Vehicle Installation Demonstration Becomes Industry Consensus [SMM Solid-State Battery Weekly Analysis]
Mass Commissioning of 100-mt-Class All-Solid-State Battery Production Lines, 2027 Vehicle Installation Demonstration Becomes Industry Consensus [SMM Solid-State Battery Weekly Analysis]
[SMM Solid-State Battery Weekly Analysis: All-Solid-State Battery 100 mt-Level Production Lines Concentratedly Commissioned; 2027 Demonstration Vehicle Installations Become Industry Consensus] In the third week of July 2026 (July 10–16, 2026), the solid-state battery industry reached a critical turning point — at the sulphide material end, 100 mt-level production lines will be concentratedly put into operation in Q3, moving the industry from "kg-level transactions" to "mt-level transactions"; at the battery cell end, Zhongke Yuanben (342 Wh/kg), Farasis Energy (500 Wh/kg) and others intensively released new products; at the project end, Changzhou's 550 million yuan final assembly base was signed and Chery's 10 billion yuan R&D centre was established; at the capital end, FAW signed entire industry chain agreements with 10 entities, and Heyuan Lithium Creation completed hundreds of millions of yuan in Series A financing; outside China, Factorial and WeLion respectively expanded into the drone and Eastern Europe energy storage markets. The inaugural year of all-solid-state battery industrialisation verification begins, and 2027 demonstration vehicle installations have already become an industry consensus.
2 hours ago
In-depth Analysis of the Technical Landscape and Industrialisation Progress of Anode Pre-lithiation [SMM Analysis]
Jul 15, 2026 14:36
In-depth Analysis of the Technical Landscape and Industrialisation Progress of Anode Pre-lithiation [SMM Analysis]
Read More
In-depth Analysis of the Technical Landscape and Industrialisation Progress of Anode Pre-lithiation [SMM Analysis]
In-depth Analysis of the Technical Landscape and Industrialisation Progress of Anode Pre-lithiation [SMM Analysis]
[SMM Analysis: In-Depth Analysis of Anode Prelithiation Technology Panorama and Industrialisation Progress] Anode prelithiation is a key technology that pre-supplements active lithium into silicon-based anodes to compensate for the irreversible capacity loss during the initial charge-discharge cycle, aiming to overcome the industrialisation bottleneck of low initial coulombic efficiency and poor cycling stability of silicon-based anodes.
Jul 15, 2026 14:36
[Solid-State Battery: Hundred-mt-Level Production Lines Intensive Commissioning in Q3, Sulphide Market Welcomes "mt-Level" Volume Inflection Point in H2]
Jul 14, 2026 11:26
[Solid-State Battery: Hundred-mt-Level Production Lines Intensive Commissioning in Q3, Sulphide Market Welcomes "mt-Level" Volume Inflection Point in H2]
Read More
[Solid-State Battery: Hundred-mt-Level Production Lines Intensive Commissioning in Q3, Sulphide Market Welcomes "mt-Level" Volume Inflection Point in H2]
[Solid-State Battery: Hundred-mt-Level Production Lines Intensive Commissioning in Q3, Sulphide Market Welcomes "mt-Level" Volume Inflection Point in H2]
[Solid-state Battery: Hundred-tonne Production Lines Begin Centralized Commissioning in Q3, Sulphide Market Encounters a “Tonne-level” Inflection Point for Volume Ramp-up in H2] July 14, 2026 news. In H1 2026, the sulphide solid-state battery industry chain focused primarily on “line construction, commissioning, and sampling,” with actual procurement volumes being minimal — only 37 mt of lithium sulphide and 49 mt of sulphide electrolytes. Entering H2, with multiple enterprises starting centralized commissioning of hundred-tonne-level and above production lines in Q3–Q4, the industry is set to transition from “kilogram-level transactions” to “tonne-level transactions,” as the sulphide market sees substantial volume ramp-up to align with the solid-state battery vehicle integration period in 2027.
Jul 14, 2026 11:26
[Solid-state Battery: Dellner Completes Solid-state Battery PACK Pilot - Shanghai Metals Market (SMM)