Silver Mountain Begins Commissioning at Peru’s Reliquias Silver-Zinc-Lead Mine, Targeting Q3 Production

Published: Jul 14, 2026 11:26

Silver Mountain Resources has commenced commissioning activities at its Reliquias silver-zinc-lead polymetallic mine in Peru’s Huancavelica district. Rehabilitation of the concentrator plant is approximately 95% complete, and the company remains on track to achieve first production in the third quarter of 2026.

The crushing circuit is now operational, while the grinding and flotation circuits have completed no-load testing. Low-grade ore is currently being used for industrial trials to fine-tune operating parameters ahead of commercial throughput. Silver Mountain has completed more than 3,000 metres of underground development and stockpiled approximately 12,000 tonnes of ore at surface, providing a feed buffer during the initial ramp-up. The tailings facility, water treatment plants and power infrastructure are also operational and permitted.

Reliquias hosts silver-zinc-lead-gold-copper vein mineralization. Following the expected production restart in Q3, the company plans to release an updated mineral resource estimate and preliminary economic assessment in Q4 2026 to evaluate the mine’s longer-term production and expansion potential.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
SMM Zinc Ingot Inventory Drops to 232,800 Tonnes by Sept 3, Down 37,100 Tonnes from August 27
42 mins ago
SMM Zinc Ingot Inventory Drops to 232,800 Tonnes by Sept 3, Down 37,100 Tonnes from August 27
Read More
SMM Zinc Ingot Inventory Drops to 232,800 Tonnes by Sept 3, Down 37,100 Tonnes from August 27
SMM Zinc Ingot Inventory Drops to 232,800 Tonnes by Sept 3, Down 37,100 Tonnes from August 27
[SMM Flash] According to SMM communications, as of Thursday (September 3), SMM's seven-region zinc ingot inventory totaled 232,800 tonnes, down 37,100 tonnes from August 27 and down 18,200 tonnes from August 31, reflecting a decline in domestic inventories.
42 mins ago
Red Dog life extension gains FAST-41 coverage for development of high-grade zinc-lead resources
1 hour ago
Red Dog life extension gains FAST-41 coverage for development of high-grade zinc-lead resources
Read More
Red Dog life extension gains FAST-41 coverage for development of high-grade zinc-lead resources
Red Dog life extension gains FAST-41 coverage for development of high-grade zinc-lead resources
The U.S. Permitting Council granted FAST-41 coverage to the Red Dog Mine Life Extension Project in northwest Alaska. The project proposes underground long-hole stoping at the Aktigiruq and Anarraaq deposits, with ore to be processed through Red Dog’s existing mill and is intended to extend Red Dog operations by approximately 14 years. The U.S. Army Corps of Engineers will lead the federal permitting review. Teck reports 42.2 Mt of indicated resources grading 15.8% Zn and 18.8 Mt of inferred resources grading 11.8% Zn at Aktigiruq, alongside 17.0 Mt of inferred resources grading 14.0% Zn at Anarraaq. Both deposits also contain lead, silver and germanium. FAST-41 coverage supports a coordinated and transparent permitting process; it does not constitute final permitting approval or commercial production.
1 hour ago
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
2 hours ago
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
Read More
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
On September 2, the Shanghai Futures Exchange (SHFE) announced that it had approved Shanghai Yuqiang Supply Chain Management Co., Ltd. to adjust its designated warehouse capacity for copper, aluminum and zinc futures. At the storage site at No. 3501 Gonghe New Road, Shanghai, the company will cancel its copper and aluminum futures storage qualifications, while its approved zinc futures warehouse capacity will remain unchanged at 20,000 tonnes. At the site at No. 2222 Jichuan Road, Minhang District, Shanghai, its zinc futures storage qualification will be canceled, while approved capacity will be adjusted to 45,000 tonnes of copper and 5,000 tonnes of aluminum.
2 hours ago
Silver Mountain Resources has commenced commissioning activities at it - Shanghai Metals Market (SMM)