Bayuquan Blast Furnace Coal Gas Flare Tower Zero-Leakage Renovation Project Cable Procurement Tender

Published: Jul 9, 2026 14:32

1. Procurement Conditions

This procurement project, Cables for the Zero-Leakage Renovation Project of Bayuquan Blast Furnace Coal Gas Flaring Tower (AGDQGSHGXHD260707302293), has Ansteel Electric Co., Ltd. as the purchaser. The procurement funds are self-raised, and the project meets the conditions for procurement, so an open inquiry and comparison are now being conducted.

2. Project Overview and Procurement Scope

2.1 Project name: Cables for the Zero-Leakage Renovation Project of Bayuquan Blast Furnace Coal Gas Flaring Tower

2.2 If procurement fails, switch to other procurement methods: direct procurement and negotiated procurement

2.3 For details of the procurement content, scope, and scale of this project, refer to the attachment Bill of Materials Attachment.pdf.

3. Bidder Qualification Requirements

3.1 Joint bids are not accepted for this procurement.

3.2 Bidders for this procurement must meet the following qualification requirements:

See the attachment (if required)

3.3 Bidders for this procurement must meet the following registered capital requirements:

Registered capital for production-based enterprises: no less than 100 million yuan

3.4 Bidders for this procurement must meet the following performance requirements:

One record of sales performance for similar products, including contract and corresponding invoice

3.5 Bidders for this procurement must meet the following capability, financial, and other requirements:

Financial requirements: See the attachment (if required)

Capability requirements: See the attachment (if required)

Other requirements: 1. Provide a business license with a registration period of no less than one year from the bid opening date; 2. Provide the National Industrial Product Production License.

3.6 For projects that are subject to bidding by law, bids from dishonest persons subject to enforcement are invalid.

4. Acquisition of Procurement Documents

4.1 Anyone interested in bidding should log on to the Ansteel Smart Bidding Platform at http://bid.ansteel.cn from 16:00, July 8, 2026 to 08:00, July 17, 2026 (Beijing time, the same hereinafter) to download the electronic procurement documents.

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Sheets & platers prices moved sideways, with intraday market transactions showing mediocre performance.
5 mins ago
Sheets & platers prices moved sideways, with intraday market transactions showing mediocre performance.
Read More
Sheets & platers prices moved sideways, with intraday market transactions showing mediocre performance.
Sheets & platers prices moved sideways, with intraday market transactions showing mediocre performance.
The most-traded HRC futures contract closed at 3298 today, up 0.12% for the day. Spot side, sheets & plates prices mostly held steady, with overall transactions pulling back slightly from the previous trading day, and end-user wait-and-see sentiment was relatively strong. SMM's weekly HRC supply-demand balance data was released today: affected by maintenance at some steel mills, HRC production fell WoW this week. Inventory side, SMM's statistics showed social inventory of HRC at 86 warehouses nationwide (large sample) at 4.3425 million mt, down 33,200 mt WoW (-0.76%), and up 45.74% lunar YoY. By region, the Northeast market saw a larger destocking, Central China market accumulated slightly, and South China, East China, and North China markets moved sideways in destocking. This week, inventory edged lower. Inventory is expected to enter an accumulation phase from next week, with supply-demand imbalance gradually intensifying. Overall, in the short term, sheets & plates prices consolidated near the bottom, with the most-traded HRC contract watched at 3270-3330. Watch factors such as macro meeting hype and the intensity of steel mill production cuts in mid-to-late month. HRC price fluctuation range is expected to widen in mid-to-late this month.
5 mins ago
[SMM Hot Topic] POSCO's 2.5-Million-Ton EAF at Gwangyang Commissioned
9 mins ago
[SMM Hot Topic] POSCO's 2.5-Million-Ton EAF at Gwangyang Commissioned
Read More
[SMM Hot Topic] POSCO's 2.5-Million-Ton EAF at Gwangyang Commissioned
[SMM Hot Topic] POSCO's 2.5-Million-Ton EAF at Gwangyang Commissioned
9 mins ago
[ArcelorMittal Pecém approves first phase of hot-rolled coil project in Brazil]
27 mins ago
[ArcelorMittal Pecém approves first phase of hot-rolled coil project in Brazil]
Read More
[ArcelorMittal Pecém approves first phase of hot-rolled coil project in Brazil]
[ArcelorMittal Pecém approves first phase of hot-rolled coil project in Brazil]
ArcelorMittal's Pecém facility in Ceará has approved the first phase of a strategic project for a new hot-rolled coil production line. This phase involves a BRL 35 million ($6.8 million) investment in engineering and development, excluding construction or equipment procurement. Physical construction depends on study outcomes and subsequent board approval. The full project, estimated at BRL 4.5 billion ($872 million), could create 3,000 construction jobs. Currently producing 3 million t/y of slabs, the plant aims to add HRC to its output to increase product value.
27 mins ago
Bayuquan Blast Furnace Coal Gas Flare Tower Zero-Leakage Renovation Project Cable Procurement Tender - Shanghai Metals Market (SMM)