【SMM Flash】Germanium Mining Advances Germanium-Silver-Zinc Exploration at Lac du Km 35 Project in Québec

Published: Jul 9, 2026 09:23

Germanium Mining has completed a Time Domain Electromagnetic (TDEM) ground survey and commenced an airborne magnetic survey at its wholly owned Lac du Km 35 property in Québec, Canada. The company is targeting germanium-silver-zinc mineralization within the project area and expects final airborne survey results by mid-July 2026.

The survey covers an area surrounding the Laganière showing and several historic geophysical anomalies, with the objective of identifying new conductive zones that may host critical metal mineralization. Sampling at the Laganière showing has returned approximately 186 ppm germanium, representing one of the highest-grade germanium occurrences reported in Québec. Germanium Mining plans to conduct additional mapping and sampling before launching an initial diamond drilling program in early 2027, consisting of approximately six to ten drill holes totaling around 2,500 metres.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Tianjin Zinc: Futures Did Not Pull Back to Downstream Psychological Price Level, Trading Was Moderate [SMM Midday Review]
36 mins ago
Tianjin Zinc: Futures Did Not Pull Back to Downstream Psychological Price Level, Trading Was Moderate [SMM Midday Review]
Read More
Tianjin Zinc: Futures Did Not Pull Back to Downstream Psychological Price Level, Trading Was Moderate [SMM Midday Review]
Tianjin Zinc: Futures Did Not Pull Back to Downstream Psychological Price Level, Trading Was Moderate [SMM Midday Review]
[Tianjin Zinc: Futures Prices Not Pulled Back to Downstream Psychological Levels, Transactions Moderate] In the Tianjin market, #0 zinc ingot mainstream transacted at 24,330-24,570 yuan/mt, Zijin traded at 24,420-24,650 yuan/mt, #1 zinc ingot traded at around 24,330-24,540 yuan/mt, Zijin was quoted at a discount of around 0-30 yuan/mt against the 2608 contract, Huxin was quoted at 25,700 yuan/mt, #0 zinc ingot was quoted at a discount of around 80-120 yuan/mt against the 2608 contract, and the Tianjin market was quoted at a discount of around 40 yuan/mt against the Shanghai market.
36 mins ago
South China Zinc Smelter Resumes After Maintenance
1 hour ago
South China Zinc Smelter Resumes After Maintenance
Read More
South China Zinc Smelter Resumes After Maintenance
South China Zinc Smelter Resumes After Maintenance
According to SMM, a zinc smelter in South China resumed production after maintenance this week, producing about 150 mt of zinc ingots per day.
1 hour ago
【SMM Flash】District-Wide Germanium Enrichment at New York Zinc Mine, Potentially Adding US$78 Million in Annual Revenue
2 hours ago
【SMM Flash】District-Wide Germanium Enrichment at New York Zinc Mine, Potentially Adding US$78 Million in Annual Revenue
Read More
【SMM Flash】District-Wide Germanium Enrichment at New York Zinc Mine, Potentially Adding US$78 Million in Annual Revenue
【SMM Flash】District-Wide Germanium Enrichment at New York Zinc Mine, Potentially Adding US$78 Million in Annual Revenue
Titan Mining has reported district-wide germanium enrichment across its Empire State Mines (ESM) zinc operation in New York, highlighting a potentially significant by-product opportunity within the Balmat-Edwards zinc system. Reconnaissance sampling from multiple underground ore bodies and historic tailings facilities confirmed elevated germanium values throughout the district, with assays reaching 85.6 ppm Ge at the Mud Pond Main zone and 49.7 ppm Ge at the New Fold zone. Historic tailings samples returned grades ranging from 18.1 ppm to 44.7 ppm Ge. The company is currently working with Teck Resources’ Trail Operations to evaluate germanium recovery from existing processing streams. Preliminary testing indicates that germanium grades increase from approximately 21 g/t in plant feed to around 77 g/t in certain pre-flotation streams, suggesting natural concentration within the milling circuit. Titan estimates a potential annual germanium production of approximately 13,000 kg. Based on a germanium price assumption of US$6,000/kg, the project could generate roughly US$78 million in annual by-product revenue, significantly enhancing the economics of the Empire State zinc operation.
2 hours ago
Germanium Mining has completed a Time Domain Electromagnetic (TDEM) gr - Shanghai Metals Market (SMM)