[SMM Computing Power] Huawei 910B2 Exit Dilemma: Monthly Rent 13,500, "Equipment Relocation" Bottlenecks

Published: Jul 3, 2026 13:52

SMM July 3 News:

Pricing side, a certain operator in the Yangtze River Delta is currently quoting a Huawei 910B server (4×Kunpeng 920 + 8×Ascend 910-B2 64G, 1TB DDR4, NVMe + RoCE v2 networking) at 13,500 yuan/unit/month, equivalent to 2.34 yuan per card per hour. Another operator's 910-B2 specification is quoted at about 15,000 yuan/month, equivalent to 2.61 yuan per card per hour, showing strong price competitiveness in the domestic computing power leasing market. Online public pricing side, the standard 910B specification has a monthly rent of around 22,000 yuan, equivalent to 3.82 yuan per card per hour; however, factoring in annual rental discounts and other considerations, actual transaction prices could have room to decline.

Demand and clearance side, SMM has learned that overall sales of the 910-B2 are struggling. Only enterprises with "high vacancy rates and needing server occupancy for digestion" show purchasing interest. A previous flash report indicated that structural obstacles exist in clearing the 910-B2: interested parties' existing equipment is deployed in their own IDCs, and new leased resources need to be integrated into a unified cluster for coordinated scheduling; however, the operator's resources are located in off-site intelligent computing centers, and constrained by equipment attributes, off-site management (equipment relocation) is difficult to implement, directly stalling transaction progress. Regarding the 910C, a certain operator previously had a batch that has been cleared. According to online information, Huawei plans to double the production of the 910C in 2026, with a clear trend of resources tilting toward the C-series.

SMM analysis shows that the 910 series presents a differentiated landscape of "tight supply of 910C and sluggish sales of 910B2." The core pain point of the 910-B2 is not price—13,500–15,000 yuan/month is not considered high in domestic computing power—but rather the lack of reasonable absorption scenarios on the demand side. If demand for domestic large-model inference continues to grow in the future, the 910-B2's advantage of being positioned for both training and inference could be repriced; however, in the short term, it remains a buyer's market.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Computing Power Daily] RTX 5090 Monthly Rent Base Price Updated to 11,500; H100 Small and Medium Clusters Seeking 3-Year Lock-in Contracts
4 hours ago
[SMM Computing Power Daily] RTX 5090 Monthly Rent Base Price Updated to 11,500; H100 Small and Medium Clusters Seeking 3-Year Lock-in Contracts
Read More
[SMM Computing Power Daily] RTX 5090 Monthly Rent Base Price Updated to 11,500; H100 Small and Medium Clusters Seeking 3-Year Lock-in Contracts
[SMM Computing Power Daily] RTX 5090 Monthly Rent Base Price Updated to 11,500; H100 Small and Medium Clusters Seeking 3-Year Lock-in Contracts
4 hours ago
Infineon Opens $5B Smart Power Fab in Dresden, Doubling Capacity Ahead of Schedule
10 hours ago
Infineon Opens $5B Smart Power Fab in Dresden, Doubling Capacity Ahead of Schedule
Read More
Infineon Opens $5B Smart Power Fab in Dresden, Doubling Capacity Ahead of Schedule
Infineon Opens $5B Smart Power Fab in Dresden, Doubling Capacity Ahead of Schedule
Infineon announced that its Smart Power Fab in Dresden, Saxony, was officially inaugurated, with its commissioning progress several months ahead of the original plan. The total investment for this project amounts to 5 billion euros, the largest single investment in Infineon's history. With the commissioning of the new fab, Infineon's capacity at the Dresden site will double, forming the world's largest production site for smart power semiconductors and analog/mixed-signal technologies.
10 hours ago
[SMM Computing Power Daily] 4090 Market Differentiation Evident; Xingyun Technology’s 5.5 Billion Computing Power Mega-Order Draws Attention
Jul 2, 2026 21:00
[SMM Computing Power Daily] 4090 Market Differentiation Evident; Xingyun Technology’s 5.5 Billion Computing Power Mega-Order Draws Attention
Read More
[SMM Computing Power Daily] 4090 Market Differentiation Evident; Xingyun Technology’s 5.5 Billion Computing Power Mega-Order Draws Attention
[SMM Computing Power Daily] 4090 Market Differentiation Evident; Xingyun Technology’s 5.5 Billion Computing Power Mega-Order Draws Attention
According to SMM, the 4090 market shows significant divergence: a toC platform acquired a long-term contract at 5,800/month last October and is now renting at 6,800/month; the platform expects to purchase at 6,000 or even lower, but a certain XX company clearly states that it is currently a seller's market, with the 4090 market price around 7,000/month, and it is impossible to find resources below 6,000. Large clusters of 4090 are out of stock. Last October, the 4090 was basically above 6,000. A distinction must be made between idle resources (leftover stock from data centers) and market rates.
Jul 2, 2026 21:00
[SMM Computing Power] Huawei 910B2 Exit Dilemma: Monthly Rent 13,500, "Equipment Relocation" Bottlenecks - Shanghai Metals Market (SMM)