[North Rhine-Westphalia Steel Production Falls 20% Over a Decade]

Published: Jul 01, 2026 10:05 (GMT+8)
Steel production in North Rhine-Westphalia (NRW), Germany's industrial heartland, fell to 45.8 million tonnes in 2025, marking a 20.1% decline from 2015 levels and a 6.4% drop compared to 2024. The reported tonnage includes crude steel, semi-finished, rolled, and finished products, containing multiple instances of double counting along the value chain. Despite the sharp volume decline, the average selling value of steel reached €786/tonne ($896/tonne) in 2025, which is 46.5% higher than in 2015 but 4.7% lower than the 2024 average. This steep decade-long volume contraction, juxtaposed with inflated nominal prices, underscores the severe deindustrialization and structural demand loss plaguing Germany's heavy manufacturing sectors.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Adanac Technical Report Outlines Long-Life Primary Molybdenum Supply】
41 mins ago
【Flash | Adanac Technical Report Outlines Long-Life Primary Molybdenum Supply】
Read More
【Flash | Adanac Technical Report Outlines Long-Life Primary Molybdenum Supply】
【Flash | Adanac Technical Report Outlines Long-Life Primary Molybdenum Supply】
EraNova Metals filed an NI 43-101 PEA technical report for its 100%-owned Adanac molybdenum project in Canada. The report confirms the August 6 results without material differences. The proposed 30,000-tpd operation has a 24-year mine life and targets average annual molybdenum output of 11.4 million lb (about 5,171 tonnes), with 270.1 million lb (about 122,515 tonnes) of payable molybdenum over the mine life. Initial capital is estimated at C$953.3 million. EraNova plans to initiate a feasibility study and advance environmental assessment and permitting. The PEA remains preliminary, with no final investment decision or production schedule.
41 mins ago
【Flash | Sisson FS Targets 1,905-Tonne Annual Molybdenum Output and 2030 Start】
1 hour ago
【Flash | Sisson FS Targets 1,905-Tonne Annual Molybdenum Output and 2030 Start】
Read More
【Flash | Sisson FS Targets 1,905-Tonne Annual Molybdenum Output and 2030 Start】
【Flash | Sisson FS Targets 1,905-Tonne Annual Molybdenum Output and 2030 Start】
Northcliff Resources filed an updated feasibility study for the Sisson tungsten-molybdenum project in New Brunswick, Canada. On a 100% project basis, reserves total 276.8 million tonnes grading 0.023% molybdenum. The 30,000-tpd project targets average annual output of 4.2 million lb (about 1,905 tonnes) of contained molybdenum over a 27-year mine life. Initial capex is C$1.528 billion. A construction decision is targeted for H2 2027 and operations for 2030. Key environmental approvals are in place, but engineering, financing, offtake and remaining EIA conditions are still outstanding. The project represents potential long-term supply rather than current output.
1 hour ago
[Tata Steel: India steel demand seen up 8-10%, in talks with Dutch government on steel production]
17 hours ago
[Tata Steel: India steel demand seen up 8-10%, in talks with Dutch government on steel production]
Read More
[Tata Steel: India steel demand seen up 8-10%, in talks with Dutch government on steel production]
[Tata Steel: India steel demand seen up 8-10%, in talks with Dutch government on steel production]
Tata Steel's CEO told the Indian Foundation for Quality Management (IFQM) Symposium 2026 in Delhi that India's domestic steel demand should grow 8-10% this year, as all consuming sectors remain strong, and said the company is positive on the industry outlook. On the proposed Netherlands project, he said Tata Steel is in active talks with the Dutch government to resolve outstanding issues before any binding agreement can be signed, including the closure of coke ovens and the classification and handling of steel slag. Tata Steel's IJmuiden plant in the Netherlands has installed capacity of about 7 million tonnes per year; the company has launched a transformation programme to install lower-carbon steelmaking processes, lift production efficiency, cut fixed costs and optimise product mix and margins.
17 hours ago