The U.S. and Iran signed a memorandum, boosting copper prices; overnight, LME copper and SHFE copper closed higher [SMM Copper Morning Briefing]

Published: Jun 18, 2026 09:10 (GMT+8)
SMM Morning Meeting Minutes: Overnight LME copper opened at $13,813/mt. At the open, copper prices showed wild swings, dipping to $13,776.5/mt during the session. Then the price center fluctuated upward, touching a high of $13,835.5/mt near the close, and finally closed at $13,835/mt, up 0.13%. Trading volume reached 11,500 lots, and open interest stood at 251,000 lots, down 7,579 lots from the previous trading day, indicating a reduction in bearish positions. Overnight, the most-traded SHFE copper 2607 contract opened at 105,280 yuan/mt. In early trading, it hit a high of 105,580 yuan/mt, then the price center dipped to 105,210 yuan/mt. Subsequently, the center fluctuated upward, and finally closed at 105,510 yuan/mt, up 0.1%. Trading volume reached 18,000 lots, and open interest reached 122,000 lots, down 2,119 lots from the previous trading day, indicating a reduction in bearish positions.

Thursday, June 18, 2026
Futures: Overnight, LME copper opened at $13,813/mt, with prices swinging wildly at the open. During the session, it dipped to $13,776.5/mt, then its price center fluctuated upward, hitting a high of $13,835.5/mt near the close before settling at $13,835/mt, up 0.13%. Trading volume reached 11,500 lots, and open interest stood at 251,000 lots, a decrease of 7,579 lots from the previous trading day, driven by bearish position reduction. Overnight, the most-traded SHFE copper 2607 contract opened at 105,280 yuan/mt, touched a session high of 105,580 yuan/mt, then saw its center dip to 105,210 yuan/mt before fluctuating upward to close at 105,510 yuan/mt, up 0.1%. Trading volume reached 18,000 lots, and open interest was 122,000 lots, a decrease of 2,119 lots from the previous trading day, also reflecting bearish position reduction.
[SMM Copper Morning Briefing] News:
(1) Canada's Lumina Metals, with its mine project under planning, could help Poland more than double its copper production, boosting the country’s ambition to become a key supplier of the metal vital for electrification and industrial growth. Lumina shares surged 46% on their Warsaw Stock Exchange debut on Tuesday. The company raised C$406.2 million (approx. $290 million) in its April IPO to advance its Nowa Sól copper project in southwestern Poland. In early May, Lumina signed a letter of intent with state-owned copper producer KGHM Polska Miedz SA to discuss future copper concentrate supplies from the project. The Nowa Sól project, located in the northern Poland copper strip, spans 120 square kilometers and is close to KGHM's mining and processing facilities. Since discovering the deposit in 2014, Lumina has completed over 51,000 meters of drilling, delineating 604 million mt of measured and indicated resources with a copper grade of 1.24% and silver grade of 38 g/mt. The company describes the project as one of the world’s largest undeveloped copper-silver deposits.
Spot Market:
(1) Shanghai: In the morning session on June 17, the SHFE copper 2607 contract moved sideways before retreating after a rapid rise. It opened at 105,200 yuan/mt, then edged down to a low of 105,040 yuan/mt. Prices then fluctuated between 105,050 yuan/mt and 105,240 yuan/mt before rising to a high of 105,570 yuan/mt and subsequently pulling back slightly to close at 105,450 yuan/mt. The next-month Contango spread ranged from 70 yuan/mt to 110 yuan/mt, while the SHFE copper import profit margin against the 2607 contract stood between a loss of 270 yuan/mt and a loss of 320 yuan/mt. Looking ahead to today, copper prices edged up. Though buying and selling sentiment rebounded, it remained relatively weak overall. Suppliers quoted premiums from parity to 10 yuan/mt early in the session, but actual trading was sluggish. Quotes were subsequently lowered for a second time to a discount of around 20 yuan/mt to facilitate deals, reflecting downstream's limited acceptance of current copper prices and a weak willingness to chase the rally. The next-month Contango spread widened slightly but remained around 100 yuan/mt, prompting suppliers to hold prices firm. Close attention should be paid to the release of warrants tomorrow. If there is a concentrated release of warrants, it will pressure spot premiums; if the outflow is limited, the downside room for the discount is relatively small, supported by the price spread structure. Overall, amid the tug-of-war between weak demand and uncertainty over warrant outflows, spot prices against the SHFE copper 2607 contract are expected to remain at current levels today.
(2) Guangdong: On June 17, spot #1 copper cathode against the front-month contract in Guangdong: high-quality copper was reported at 210 yuan/mt, flat from the previous trading day; standard-quality copper was reported at a premium of 150 yuan/mt, flat from the previous trading day; SX-EW copper was reported at a premium of 90 yuan/mt, flat from the previous trading day. The average price of #1 copper cathode in Guangdong was 105,500 yuan/mt, up 565 yuan/mt from the previous trading day, while the average price of SX-EW copper was 105,410 yuan/mt, up 565 yuan/mt from the previous trading day. Overall, pre-holiday restocking interest was weak, spot trades were average, and the situation is not expected to improve today.
(3) Imported Copper: On June 17, the average warrant price was flat from the previous trading day at $59/mt (price range: $54-64/mt); the average B/L price was flat from the previous trading day at $61/mt (price range: $55-67/mt); the average price for EQ copper (CIF, B/L) was flat from the previous trading day at $33/mt (price range: $30-36/mt), with quotes referencing cargoes arriving from mid-to-late June to early July.
(4) Secondary Copper: The futures closing price at 11:30 on June 17 was 105,320 yuan/mt, up 460 yuan/mt from the previous trading day. The average spot premium stood at 20 yuan/mt, down 5 yuan/mt from the previous trading day. Today, copper scrap prices rose 200 yuan/mt MoM. The copper scrap sales sentiment index rose to 2.49, while the procurement sentiment index fell to 2.25. The price difference between copper cathode and copper scrap was 2,714 yuan/mt, up 231 yuan/mt MoM. The price difference between copper cathode rod and secondary copper rod was 1,090 yuan/mt. According to an SMM survey, with the Dragon Boat Festival holiday approaching, many secondary copper rod enterprises will arrange for workshop workers to take at least one day off due to limited input tax invoices or insufficient inventory of duty-paid copper scrap.
Prices: On the macro front, the US and Iran reportedly signed a memorandum of understanding online, easing geopolitical conflict risks and providing support to copper prices. The US Fed kept rates unchanged at this meeting, with Waller’s debut being mildly hawkish, removing language suggesting rate cuts and refusing to provide forward guidance. However, the new quarterly projections showed that nine policymakers expect rate hikes by the end of 2026, which heightened market expectations for tightening and capped the upside room for copper prices. On the fundamentals side, a slight widening of the price spread between futures contracts drove suppliers to hold prices firm, keeping spot market supply relatively tight; on the demand side, high copper prices suppressed overall transactions to sluggish levels, with only just-in-time procurement seen. In summary, copper prices are expected to remain in the doldrums today, weighed by rate hike expectations.
[The information provided is for reference only. This article does not constitute direct advice for investment research decisions. Clients should make prudent decisions and not use this as a substitute for independent judgment. Any decisions made by clients are not related to Shanghai Metals Market.]

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
What Could a Cobre Panamá Restart Mean for Global Copper Supply? [SMM Analysis]
6 hours ago
What Could a Cobre Panamá Restart Mean for Global Copper Supply? [SMM Analysis]
Read More
What Could a Cobre Panamá Restart Mean for Global Copper Supply? [SMM Analysis]
What Could a Cobre Panamá Restart Mean for Global Copper Supply? [SMM Analysis]
Cobre Panamá could again become a major source of global copper supply if Panama and First Quantum agree on a new operating framework. The mine produced 330.9 kt of copper in 2023 and historically supplied around 1% of global output. While stockpile processing has resumed, fresh mining remains suspended. Any restart would likely be phased, with timing dependent on negotiations, legal conditions and operational remobilisation.
6 hours ago
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
11 hours ago
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Read More
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Vedanta has unveiled a major investment plan, under which Vedanta Copper intends to invest $2.3 billion in India and Saudi Arabia over the next three to four years, targeting annual copper production of more than 1 million tonnes by 2030. The company aims to produce 500,000 tonnes annually in both India and Saudi Arabia, alongside existing production of 100,000 tonnes in Fujairah, UAE. Around $2 billion will be invested in Saudi copper mining, smelting and rod projects, with an investment decision on the proposed Saudi copper smelter expected this quarter. Vedanta is also seeking to restart its Tuticorin copper smelter in India, which has been closed since 2018. The company expects a court ruling within three months and, subject to approval, plans to invest $250 million in refurbishing the facility, targeting a restart within eight to nine months and annual copper output of 250,000 tonnes. Meanwhile, its Silvassa facility is operating at around 95% capacity, with annualised copper cathode production exceeding 245,000 tonnes.
11 hours ago
London BTC flags copper and antimony at Nevada Black Star
13 hours ago
London BTC flags copper and antimony at Nevada Black Star
Read More
London BTC flags copper and antimony at Nevada Black Star
London BTC flags copper and antimony at Nevada Black Star
London BTC Company Limited (LSE:BTC, OTCQB:VINZF) announced on 5 October 2026 initial on-site pXRF results from its Black Star gold-critical minerals project in Pershing County, Nevada. A maiden programme collected 69 rock-chip samples along a 2.5km corridor between the Western and Eastern targets. pXRF readings showed antimony up to 0.44% Sb, copper up to 30.0% Cu, bismuth up to 0.73% Bi and silver up to 811 ppm Ag, with the antimony-copper association appearing at both ends of the corridor. The signature mirrors a historical 1985 sample 120m south of the claims (>1% Sb, 2% Cu, 700 ppm Ag). Earlier due-diligence sampling returned up to 16.23 g/t gold and 50.5 g/t silver. Samples are now with MSALABS for laboratory assays, with full multi-element geochemistry including antimony, tungsten and copper to follow. Copper, as a by-product credit, adds strategic appeal under US critical-minerals policy, though results remain preliminary field readings.
13 hours ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here
The U.S. and Iran signed a memorandum, boosting copper prices; overnight, LME copper and SHFE copper closed higher [SMM Copper Morning Briefing] - Shanghai Metals Market (SMM)