Tender for Procurement of Quasi-First-Grade Coke Dry Quenching and Other Projects

Published: Jun 5, 2026 20:01

1. Procurement Conditions

The procurement project for Quasi-First-Grade Coke Dry Quenching and other projects (AGLYLGHHD260605294114) is undertaken by the Business Management Office of the Ironmaking Plant, Lingyuan Iron & Steel Co., Ltd., with project funds sourced from self-raised funds. The project has met the procurement conditions and is now proceeding with an open single-round negotiation.

2. Project Overview and Procurement Scope

2.1 Project Name: Quasi-First-Grade Coke Dry Quenching and other projects

2.2 If procurement fails, switch to other procurement methods: switch to direct procurement

2.3 For the procurement content, scope, and scale of this project, please refer to the attachment "Bill of Materials Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Consortium bidding is not permitted for this procurement.

3.2 Bidders must have the following qualifications:

(1) Distribution business license

(2) Production business license

3.3 Bidders must meet the following registered capital requirements:

Production type registered capital: RMB 10.0 million or above

Distribution type registered capital: RMB 10.0 million or above

3.4 Bidders must have the following performance requirements:

Provide sales contracts and invoices signed with steel mills after January 1, 2025.

3.5 Bidders must meet the following capability requirements, financial requirements, and other requirements:

Financial requirements: See attachment (if required)

Capability requirements: See attachment (if required)

Other requirements: A product quality inspection report must be provided, and the indicators corresponding to the technical quality requirements in the report must be qualified.

3.6 For projects that must be tendered according to law, bids from dishonest persons subject to enforcement are invalid.

4. Obtaining Procurement Documents

4.1 Any interested bidder shall log in to the Ansteel Smart Bidding Platform at http://bid.ansteel.cn to download the electronic procurement documents during the period from 11:30 June 5, 2026 to 13:00 June 8, 2026 (Beijing time, the same hereinafter).

Click to view bidding details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] Zimbabwe plans to use natural resources as collateral, cooperating with China to advance infrastructure projects.
19 hours ago
[SMM Analysis] Zimbabwe plans to use natural resources as collateral, cooperating with China to advance infrastructure projects.
Read More
[SMM Analysis] Zimbabwe plans to use natural resources as collateral, cooperating with China to advance infrastructure projects.
[SMM Analysis] Zimbabwe plans to use natural resources as collateral, cooperating with China to advance infrastructure projects.
19 hours ago
Company Launches RMB 135M Project for Recycling 30,000 Tons of Waste Batteries Annually
20 hours ago
Company Launches RMB 135M Project for Recycling 30,000 Tons of Waste Batteries Annually
Read More
Company Launches RMB 135M Project for Recycling 30,000 Tons of Waste Batteries Annually
Company Launches RMB 135M Project for Recycling 30,000 Tons of Waste Batteries Annually
Recently, the annual 30,000-ton retired power battery comprehensive utilization project invested by the company commenced construction in the Changjiang (Changjiang) Clean Energy High-tech Industrial Park Circular Economy Demonstration Zone. According to public information, the total investment of the project is RMB 135 million, covering an area of about 30 mu, located in the above-mentioned industrial park, and constructed in two phases. Upon completion, it will achieve an annual processing capacity of 30,000 tons of waste LIB cells, stably producing high value-added recycled products such as comprehensive utilization batteries, copper granules, aluminum granules, battery casings, and LIB black mass.
20 hours ago
EIA Approval Sought for $500M Battery Recycling Plant in Lingang, China
20 hours ago
EIA Approval Sought for $500M Battery Recycling Plant in Lingang, China
Read More
EIA Approval Sought for $500M Battery Recycling Plant in Lingang, China
EIA Approval Sought for $500M Battery Recycling Plant in Lingang, China
Recently, the management committee and local government released the public notice on the proposed approval of the EIA report for the new energy vehicle power battery material processing, battery cascade utilization and resource center project (re-filed). The project involves a total investment of RMB 500 million, located in the Lingang Economic and Technological Development Zone. It consists of one dismantling & cascade utilization production line, one black mass preparation (cell crushing) production line, and one lithium carbonate production line. Upon completion, it will achieve Phase I annual dismantling capacity of 60,000 tons of power LIB packs (including 20,000 tons of cell crushing and 10,000 tons of cell cascade utilization), and Phase II annual output of 3,973 tons of lithium carbonate.
20 hours ago
Tender for Procurement of Quasi-First-Grade Coke Dry Quenching and Other Projects - Shanghai Metals Market (SMM)