Musonoi Start-Up Drives 29.5% Increase in Jinchuan International’s Q1 Copper Output

Published: Jun 3, 2026 13:59
Jinchuan International reported Q1 2026 production of 18,021 tonnes of contained copper in cathode and concentrate, up 29.5% year-on-year, while cobalt hydroxide production rose to 2,139 tonnes from 71 tonnes a year earlier. The company attributed the increase primarily to contributions from the Musonoi mine in the Democratic Republic of Congo (DRC), which commenced commercial production in November 2025. Musonoi hosts approximately 606,000 tonnes of copper reserves and 174,000 tonnes of cobalt reserves, with copper and cobalt grades of 3.4% and 0.9%, respectively. As Musonoi ramps up production, Jinchuan International expects annual copper output capacity to increase from around 60,000 tonnes to approximately 100,000 tonnes.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Konkola Copper Mines (KCM)'s Nchanga Smelter Began a 60-Day Production Shutdown for Maintenance
11 mins ago
Konkola Copper Mines (KCM)'s Nchanga Smelter Began a 60-Day Production Shutdown for Maintenance
Read More
Konkola Copper Mines (KCM)'s Nchanga Smelter Began a 60-Day Production Shutdown for Maintenance
Konkola Copper Mines (KCM)'s Nchanga Smelter Began a 60-Day Production Shutdown for Maintenance
Konkola Copper Mines (KCM), a subsidiary of Vedanta Resources, announced on Tuesday the official commencement of a planned 60-day maintenance shutdown of the Nchanga smelter in Zambia, with production expected to resume in August 2026. The maintenance aims to enhance equipment reliability and long-term efficiency. During the shutdown, KCM will ensure continued production at the SX-EW Tailings Leach Plant (TLP) through external acid procurement and its own 500 mt/day acid plant. According to SMM, the Nchanga smelter currently has a smelting capacity of approximately 150,000 mt/year and plans to reach 300,000 mt/year by 2030.
11 mins ago
Huanghe Company Saikun ESS Power Station Put into Operation
51 mins ago
Huanghe Company Saikun ESS Power Station Put into Operation
Read More
Huanghe Company Saikun ESS Power Station Put into Operation
Huanghe Company Saikun ESS Power Station Put into Operation
The 50 MW/100 megawatt hour Saikun ESS power station, supporting Huanghe Company's 500,000 kW Mangya wind power project in Haixi Prefecture, was officially connected to grid and put into operation, marking the on-schedule achievement of the construction and commissioning target for the company's first energy storage project deployed in Haixi Prefecture.
51 mins ago
Some Secondary Copper Rod Enterprises Bullish on Market Outlook, Purchasing Enthusiasm Improving
54 mins ago
Some Secondary Copper Rod Enterprises Bullish on Market Outlook, Purchasing Enthusiasm Improving
Read More
Some Secondary Copper Rod Enterprises Bullish on Market Outlook, Purchasing Enthusiasm Improving
Some Secondary Copper Rod Enterprises Bullish on Market Outlook, Purchasing Enthusiasm Improving
[SMM Express] According to SMM, the rise in copper prices boosted the willingness to sell among copper scrap suppliers; downstream secondary copper rod plants were undeterred by high raw material prices, with purchasing enthusiasm improving. Some enterprises were bullish on the market outlook and proactively purchased at high prices to lock in raw materials.
54 mins ago