[SMM Stainless Steel Market Flash] HKU Develops SS-H2 Stainless Steel for Lower-Cost Seawater Hydrogen Systems

Published: May 25, 2026 18:25
A research team at the University of Hong Kong has developed a new stainless steel called SS-H2 for seawater-based hydrogen production systems. The reports said the material is designed to maintain stronger corrosion resistance under harsh, high-voltage operating conditions and could potentially replace more expensive titanium components now used in electrolyzers. The development is seen as a possible new materials route for lowering the cost of green hydrogen equipment.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Codelco H1FY2026 Molybdenum Output Falls 14.5% YoY】
4 hours ago
【Flash | Codelco H1FY2026 Molybdenum Output Falls 14.5% YoY】
Read More
【Flash | Codelco H1FY2026 Molybdenum Output Falls 14.5% YoY】
【Flash | Codelco H1FY2026 Molybdenum Output Falls 14.5% YoY】
Chile’s state-owned Codelco reported H1FY2026 molybdenum production of 6,500 tonnes, down 14.5% from 7,600 tonnes in the same period of 2025. Molybdenum sales totaled 7,600 tonnes, down 5% from 8,000 tonnes a year earlier. The decline in production indicates a notable YoY contraction in Codelco’s by-product molybdenum supply.
4 hours ago
【Flash | Sierra Gorda H1FY2026 Molybdenum Output Rises 6% on Higher Recovery】
6 hours ago
【Flash | Sierra Gorda H1FY2026 Molybdenum Output Rises 6% on Higher Recovery】
Read More
【Flash | Sierra Gorda H1FY2026 Molybdenum Output Rises 6% on Higher Recovery】
【Flash | Sierra Gorda H1FY2026 Molybdenum Output Rises 6% on Higher Recovery】
KGHM Polska Miedź (KGHM) reported H1FY2026 molybdenum output at Sierra Gorda of 1.8 million lb (about 816 tonnes) on its 55% attributable basis, equivalent to roughly 1,484 tonnes on a 100% mine basis, up 6% YoY. Q2 output was 0.9 million lb (about 408 tonnes), equivalent to around 742 tonnes on a 100% basis, down 25% YoY. Higher molybdenum recovery offset lower ore grades and reduced throughput. KGHM set Sierra Gorda’s FY2026 molybdenum production budget at 2.1 million lb (about 953 tonnes) on the same 55% basis, equivalent to about 1,732 tonnes at 100%. With 1.8 million lb already produced in H1FY2026, the mine had achieved about 86% of its full-year molybdenum budget.
6 hours ago
[Flash | Antofagasta H1FY26 Molybdenum Output Slumps 17%-18% as Ore Grades Weaken]
Sep 8, 2026 09:18
[Flash | Antofagasta H1FY26 Molybdenum Output Slumps 17%-18% as Ore Grades Weaken]
Read More
[Flash | Antofagasta H1FY26 Molybdenum Output Slumps 17%-18% as Ore Grades Weaken]
[Flash | Antofagasta H1FY26 Molybdenum Output Slumps 17%-18% as Ore Grades Weaken]
Antofagasta reported a notable year-on-year decline in molybdenum production across its key copper-molybdenum operations in H1FY26. Molybdenum output at Los Pelambres fell 17% to 4,700 tonnes from 5,700 tonnes a year earlier, while output at Centinela declined 18% to 1,400 tonnes from 1,700 tonnes. The company attributed the declines primarily to lower ore grades.
Sep 8, 2026 09:18
A research team at the University of Hong Kong has developed a new sta - Shanghai Metals Market (SMM)