【SMM Steel】Wuppermann opens new pipe plant at Austrian site

Published: May 5, 2026 13:58
【SMM Steel】Wuppermann Metalltechnik opened a new tube plant at its Altmünster, Austria site. Construction began in July 2023, with an estimated cost of €40m. The new line enables a wider size range: complex geometries up to 130mm cross-section and 1-4mm thickness, with pickled, galvanized, or Zn-Mg coatings. For climate-neutral heating, geothermal probes totaling ~5,000m were installed. The first pipe was made in July 2025. Austria's steel output rose 5.9% y/y to 620,000t in 2025, ranking 20th globally.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Iron & Steel] US Steel Output Hits Record Utilization Amid Domestic Momentum
2 mins ago
[SMM Iron & Steel] US Steel Output Hits Record Utilization Amid Domestic Momentum
Read More
[SMM Iron & Steel] US Steel Output Hits Record Utilization Amid Domestic Momentum
[SMM Iron & Steel] US Steel Output Hits Record Utilization Amid Domestic Momentum
The American Iron and Steel Institute (AISI) reported that for the week ending May 2, 2026, domestic raw steel production reached 1,856,000 net tons, with a capability utilization rate of 80.4%. This represents a 9.6% increase compared to the same week in 2025. Adjusted year-to-date production through early May reached 31,405,000 net tons, reflecting robust industrial demand in the North American market.
2 mins ago
[SMM Iron & Steel] ArcelorMittal Revises Decarbonization Strategy: No New EAFs This Decade
2 mins ago
[SMM Iron & Steel] ArcelorMittal Revises Decarbonization Strategy: No New EAFs This Decade
Read More
[SMM Iron & Steel] ArcelorMittal Revises Decarbonization Strategy: No New EAFs This Decade
[SMM Iron & Steel] ArcelorMittal Revises Decarbonization Strategy: No New EAFs This Decade
ArcelorMittal has adjusted its long-term strategy, stating that it will not initiate any new electric arc furnace (EAF) investments until its 2 Mt/y reference project in Dunkirk, France, is nearing completion. The group's 2025 Sustainability Report indicates that due to high energy prices in Europe (well above $30/MWh) and slow progress in green hydrogen infrastructure, the company will adopt a "flexible and adaptable" strategy, prioritizing financial discipline. The Dunkirk EAF project, costing €1.3 billion, has a planned capacity of 2 Mt/y and is expected to begin production in 2029, reaching full capacity in 2030-2031. The new EAF will replace two existing blast furnaces with a combined capacity of 1.8 Mt/y.
2 mins ago
[SMM Iron & Steel] Kazakhstan Extends Ban on Ferrous Scrap Exports
2 mins ago
[SMM Iron & Steel] Kazakhstan Extends Ban on Ferrous Scrap Exports
Read More
[SMM Iron & Steel] Kazakhstan Extends Ban on Ferrous Scrap Exports
[SMM Iron & Steel] Kazakhstan Extends Ban on Ferrous Scrap Exports
Kazakhstan has officially extended its ban on the export of ferrous scrap by rail and road for another six months. The measure is intended to ensure a stable supply of raw materials for domestic steel producers as they ramp up production to meet national infrastructure goals. Regional billet prices rose by $10–15 per ton following the announcement.
2 mins ago