Downstream Pre-Holiday Stockpiling, Market Procurement Sentiment Recovered [SMM Spot Aluminum Midday Review]

Published: Apr 28, 2026 15:41

SMM April 28:

SHFE aluminum 2605 fluctuated downward in early trading. Influenced by pre-holiday restocking, invoice shortages, and the sharp decline in aluminum prices, overall buyer purchasing sentiment was strong. Mainstream transactions for cargoes with invoices dated this month in the market centered around SMM A00 aluminum average price to +20 yuan/mt. The shipment sentiment index in east China was 3.01 today, down 0.31 MoM; the procurement sentiment index was 3.58, up 0.29 MoM.

In central China, downstream processing enterprises showed improved stockpiling sentiment, but invoicing quotas declined. Traders' concerns over whether invoices could be issued on schedule suppressed overall market transactions. Procurement sentiment edged down slightly from yesterday, but traders showed strong willingness to hold prices firm, preventing prices from continuing to decline. The actual transaction price range in central China ultimately centered around the central China price plus 10 yuan to minus 10 yuan. The shipment sentiment index in central China was 2.82 today, down 0.01 MoM; the procurement sentiment index was 2.33, down 0.01 MoM.

Inventory side, aluminum ingot inventory in major consumption areas fell 0.65 MoM today, with all three regions showing a destocking trend.

 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China's Q1 Industrial Profits Rise 15.5% YoY, Led by Electronics Sector Growth
3 hours ago
China's Q1 Industrial Profits Rise 15.5% YoY, Led by Electronics Sector Growth
Read More
China's Q1 Industrial Profits Rise 15.5% YoY, Led by Electronics Sector Growth
China's Q1 Industrial Profits Rise 15.5% YoY, Led by Electronics Sector Growth
Data released by the NBS showed that in Q1 this year, profits of China's above-designated-size industrial enterprises grew 15.5% YoY, with the YoY growth rate up 0.3 percentage points from January-February. By industry, profits of the computer, communications, and other electronic equipment manufacturing industry surged 1.2 times YoY, while profits of the automobile manufacturing industry declined 17.7% YoY.
3 hours ago
SHFE Cast Aluminum Alloy Warrants Up 904 MT to 32,203 MT on April 27
7 hours ago
SHFE Cast Aluminum Alloy Warrants Up 904 MT to 32,203 MT on April 27
Read More
SHFE Cast Aluminum Alloy Warrants Up 904 MT to 32,203 MT on April 27
SHFE Cast Aluminum Alloy Warrants Up 904 MT to 32,203 MT on April 27
[SMM Update] SHFE data showed that on April 27, the total registered cast aluminum alloy warrants were 32,203 mt, an increase of 904 mt from the previous trading day. By region: Shanghai (1,822 mt, unchanged), Guangdong (10,908 mt, down 61 mt), Jiangsu (4,377 mt, up 390 mt), Zhejiang (9,477 mt, up 575 mt), Chongqing (4,143 mt, unchanged), and Sichuan (1,506 mt, unchanged).
7 hours ago
[SMM Aluminum Flash News] Alcoa Evaluates Warrick Restart with USD 100 Million Investment
7 hours ago
[SMM Aluminum Flash News] Alcoa Evaluates Warrick Restart with USD 100 Million Investment
Read More
[SMM Aluminum Flash News] Alcoa Evaluates Warrick Restart with USD 100 Million Investment
[SMM Aluminum Flash News] Alcoa Evaluates Warrick Restart with USD 100 Million Investment
Alcoa is evaluating the restart of a fourth aluminum production line at its Warrick facility in Indiana, which would require about USD 100 million and take one to two years. The plant currently operates three lines, and restarting the fourth could add around 50,000 tones of capacity. The company said the line is in poor condition and would require replacement of key electrical equipment with long lead times. Electricity availability in both the short and long term will be a key factor in the decision. The project remains under evaluation, with progress depending on cost, energy and operational feasibility.
7 hours ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?sign in here