Uncertainty Still Surrounds the Situation in the Middle East, the Most-Traded BC Copper Contract Closed Down 0.05% [SMM BC Copper Commentary]

Published: Apr 3, 2026 17:16

Today, the most-traded BC copper 2605 contract opened at 84,660 yuan/mt, touched a low of 84,450 yuan/mt in early trading, and then its center fluctuated upward. After the daytime session opened, it hit a high of 85,820 yuan/mt, then moved sideways, and finally closed at 85,180 yuan/mt, down 0.05%. Open interest stood at 6,404 lots, down 38 lots from the previous trading day, while trading volume reached 3,654 lots, down 854 lots from the previous trading day. On the macro front, the number of initial jobless claims in the US pulled back last week, and the labour market remained generally stable. In addition, uncertainty still surrounded the geopolitical situation in Iran, and related statements failed to ease market risk-off sentiment. Fundamentally, on the supply side, imported cargoes have continued to arrive at ports recently, and overall spot circulation remained relatively ample. On the demand side, downstream enterprises still showed limited acceptance of current price levels, and overall just-in-time procurement remained the main approach.

The SHFE copper 2605 contract closed at 96,250 yuan/mt. Based on the BC copper 2605 contract price of 85,180 yuan/mt, its after-tax price was 96,253 yuan/mt. The price spread between the SHFE copper 2605 contract and BC copper was -3 yuan/mt, showing an inverted spread.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Bezant Targets First Concentrate at Namibia’s Hope & Gorob in September
26 mins ago
Bezant Targets First Concentrate at Namibia’s Hope & Gorob in September
Read More
Bezant Targets First Concentrate at Namibia’s Hope & Gorob in September
Bezant Targets First Concentrate at Namibia’s Hope & Gorob in September
Bezant Resources said development of the Hope & Gorob copper-gold project in Namibia and the associated Tsoaxaub Metals Processing Plant remains in line with the current project schedule, with first run-of-mine ore expected to be processed during September 2026. Subject to completion of the remaining commissioning activities, processing of the first ROM ore is expected to generate the project’s first concentrate. Ore from the first two mine blasts has already been stockpiled and is ready for transport to the processing plant, while Bezant said the stockpiled tonnage exceeded initial projections due to additional ore recovery recorded in the company’s Mineral Inventory. Development work is progressing at both the mine and processing plant. Mine-site camp construction is approximately 75% complete, around 75% of surface infrastructure has been delivered and is being installed, and the full Unitrans mining and haulage fleets are now on site. At the Tsoaxaub plant, Bezant has received the C1 Civils and Structural Completion Certificate, confirming completion of major structural steelwork and civil works, while the C2 Mechanical Completion Certificate is scheduled for completion during September. Electrical drives and instrumentation are around 90% complete, with the cone crusher, flotation equipment, tailings infrastructure and other processing components undergoing final preparation ahead of commissioning. Bezant has also accelerated its review of a Phase II expansion plan, considering current and projected copper, gold and silver prices as well as the potential inclusion of lower-grade mineralisation that had previously been considered sub-economic. The company is evaluating a higher mass-pull operating strategy for the ore sorter that could increase copper recoveries, although potentially at a lower pre-concentrate grade. Based on the current Mineral Inventory, existing JORC (2012) Mineral Resource, planned flotation-plant capacity and the higher mass-pull scenario under consideration, management believes Hope & Gorob has the potential to support an approximately 35-year mine life. Bezant has not yet published a revised economic model incorporating this longer-life scenario. SMM Analysis: The September processing target places Hope & Gorob close to the transition from mine development into initial concentrate production, with ROM ore already stockpiled and key processing infrastructure approaching mechanical completion. The potential 35-year mine life and Phase II expansion remain under technical and economic review and should not yet be treated as a confirmed revised development plan. In the near term, the key milestone to watch will be completion of plant commissioning and confirmation of first concentrate production during September.
26 mins ago
SMM expects overall copper anode operating rate to edge up MoM in September
34 mins ago
SMM expects overall copper anode operating rate to edge up MoM in September
Read More
SMM expects overall copper anode operating rate to edge up MoM in September
SMM expects overall copper anode operating rate to edge up MoM in September
[SMM Copper Anode Flash] SMM expects the overall operating rate of China copper anode enterprises to rebound 1.30 percentage points MoM to 44.11% in September 2026. Among them, primary copper anode enterprises are expected to see their operating rate fall 7.19 percentage points MoM to 57.88% due to maintenance at some enterprises and refining capacity ramp-up; secondary copper anode enterprises are expected to see their operating rate rebound 4.76 percentage points MoM to 38.48%. (Non-captive copper anode only)
34 mins ago
Aug SMM China copper anode operating rate fell to 42.81% MoM
35 mins ago
Aug SMM China copper anode operating rate fell to 42.81% MoM
Read More
Aug SMM China copper anode operating rate fell to 42.81% MoM
Aug SMM China copper anode operating rate fell to 42.81% MoM
[SMM Copper Anode Flash] In August 2026, the operating rate of SMM China copper anode enterprises was 42.81%, down 1.85 percentage points MoM. By raw material, the operating rate of primary copper anode enterprises rose 1.54 percentage points MoM to 65.07%; the operating rate of secondary copper anode enterprises fell 3.23 percentage points MoM to 33.72% due to tight supply of tax-inclusive copper scrap. (Non-captive copper anode only)
35 mins ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here
Uncertainty Still Surrounds the Situation in the Middle East, the Most-Traded BC Copper Contract Closed Down 0.05% [SMM BC Copper Commentary] - Shanghai Metals Market (SMM)