Shanghai Engineering Research Center for Efficient Synthesis Systems of Green Fuels (Preparatory) Was Officially Unveiled

Published: Mar 24, 2026 11:51

On the morning of March 10, the unveiling ceremony and construction launch meeting for the Shanghai Key Laboratory of Efficient Green Fuel Synthesis Systems Engineering (Preparatory) were successfully held at Shanghai Boiler Works Co., Ltd. Xuan Fuzhen, President of East China University of Science and Technology, and Wu Lei, Party Secretary and Chairman of Shanghai Electric Group, jointly unveiled the laboratory, marking the official entry of the key laboratory’s development into a new stage of substantive progress. Zheng Guanghong, Second-Level Inspector of the Shanghai Municipal Science and Technology Commission, witnessed the ceremony on site.

Led by Shanghai Boiler Works Co., Ltd. and jointly established with East China University of Science and Technology, the laboratory focuses on tackling critical “bottleneck” technological challenges in the application field of efficient synthesis of green fuels such as green methanol, green ammonia, and sustainable aviation fuel (SAF). It has precisely laid out three core research directions: efficient synthesis of diversified green fuels, high-efficiency clean power equipment, and AI + digital twin flexible regulation and control. It is committed to building a full-chain innovation system spanning basic R&D, pilot-scale verification, and industrialisation, thereby supporting breakthroughs in green fuel technologies and their industrial application.

Wu Lei, Party Secretary and Chairman of Shanghai Electric Group, stated at the event that the high-standard development of the key laboratory for green fuels is an important practice for Shanghai Electric in implementing the national development strategy for new quality productive forces in the energy sector and promoting the deep integration of green fuel technological innovation with industry. Shanghai Electric will use the laboratory’s development as an important lever, providing comprehensive support in policy, resources, funding, and other aspects, fully integrating high-quality internal and external resources, and making every effort to advance technological research, professional talent cultivation, and the commercialisation of scientific research achievements, thereby contributing wisdom and strength to the high-quality development of China’s green fuel industry.

Xuan Fuzhen, President of East China University of Science and Technology, pointed out that the university will give full play to its disciplinary strengths, carry out close and pragmatic cooperation with Shanghai Electric, vigorously promote the deep integration of industry, academia, and research, focus on core challenges in green fuel synthesis technologies and equipment, strive to achieve major technological breakthroughs, and work together to build a benchmark for collaborative innovation among industry, academia, and research.

Jin Xiaolong, Member of the Party Committee and Vice President of Shanghai Electric Group, Vice President Qiu Jiayou, and relevant leaders from the Shanghai Municipal Science and Technology Commission, East China University of Science and Technology, and Shanghai Electric Power Station Group attended the event.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yunnan Energy Wins Bid for 100MW/400MWh Vanadium Flow Battery Storage Project
Jul 4, 2026 12:50
Yunnan Energy Wins Bid for 100MW/400MWh Vanadium Flow Battery Storage Project
Read More
Yunnan Energy Wins Bid for 100MW/400MWh Vanadium Flow Battery Storage Project
Yunnan Energy Wins Bid for 100MW/400MWh Vanadium Flow Battery Storage Project
Yunnan Energy announced that it has been selected as the developer of the 100MW/400MWh Ninglang independent shared energy storage project in Lijiang, Yunnan Province. The project, which has been included in Yunnan's 2026 new shared energy storage project list, will adopt a grid-forming vanadium redox flow battery (VRFB) energy storage system and is scheduled to be commissioned within two years. The company said the project will strengthen its new energy business, although it remains subject to regulatory approvals.
Jul 4, 2026 12:50
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
Jul 4, 2026 12:48
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
Read More
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
SQM and Codelco's lithium joint venture, Novandino, has outlined plans in an environmental impact assessment (EIA) filing to increase annual lithium production capacity from around 270,000 mt currently to as much as 470,000 mt. The expansion is aimed at meeting long-term demand from electric vehicles and grid-scale energy storage. According to the filing, production will first gradually rise to around 300,000 mt before transitioning over seven years to an integrated production system incorporating direct lithium extraction (DLE), with additional capacity expected to come online over several years.
Jul 4, 2026 12:48
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
Jul 3, 2026 22:44
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
Read More
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
According to an industry letter seen by Reuters, exporters have been unable to submit export declarations through the customs platform since July 1 because ARECOMS, the Democratic Republic of Congo's strategic minerals regulator, has not formally notified customs to continue processing export quotas. As a result, major producers including CMOC Group, Glencore, Eurasian Resources Group (ERG) and Huayou Cobalt have been unable to complete export procedures. Meanwhile, ARECOMS requires companies to utilize their first-half export quotas by July 5, after which any unused volumes will be withdrawn and reallocated. Industry sources estimate that around 60%–75% of companies are unlikely to meet the deadline due to administrative delays. If the issue is not resolved promptly, up to 20,000 tonnes of cobalt exports, worth approximately US$1.1 billion at current prices, could be affected. CMOC alone could lose almost all of its second-quarter export quota. SMM will continue to monitor developments.
Jul 3, 2026 22:44
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here
Shanghai Engineering Research Center for Efficient Synthesis Systems of Green Fuels (Preparatory) Was Officially Unveiled - Shanghai Metals Market (SMM)