Tender for Externally Purchased Metallurgical Coke Procurement of Chaoyang Steel in February 2026

Published: Feb 10, 2026 14:39

1. Procurement Conditions

This procurement project, the February 2026 Externally Purchased Metallurgical Coke for Chaoyang Steel (AGCYGTHHD260210268461), was procured by the Equipment Support Department of Ansteel Group Chaoyang Steel Co., Ltd. The procurement project funds came from self-raised sources, and the project has met the procurement conditions. A public single-round negotiation is now being conducted.

2. Project Overview and Procurement Scope

2.1 Project Name: February 2026 Externally Purchased Metallurgical Coke for Chaoyang Steel

Procurement Failure Transition to Other Procurement Method: Transition to Direct Procurement

2.3 The procurement content, scope, and scale of this project are detailed in the attachment "Material List Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Consortium bidding is not allowed for this procurement.

3.2 This procurement requires bidders to possess the following qualification requirements:

See the attachment (if required)

3.3 This procurement requires bidders to meet the following registered capital requirements:

Circulation-type registered capital: 20,000,000.0 yuan and above

3.4 This procurement requires bidders to possess the following performance requirements:

See the attachment.

3.5 This procurement requires bidders to possess the following capability requirements, financial requirements, and other requirements:

Financial requirements: See the attachment.

Capability requirements: Not required,

Other requirements: See the attachment.

3.6 For this procurement, which is a project that must be tendered according to law, bids from discredited persons subject to enforcement shall be invalid.

4. Procurement Document Acquisition

4.1 All interested bidders, please log in to the Ansteel Smart Tender and Bidding Platform at http://bid.ansteel.cn between 14:00 on February 10, 2026 and 08:00 on February 12, 2026 (Beijing Time, the same hereinafter) to download the electronic procurement documents.

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
Mar 13, 2026 19:55
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
Read More
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
[SMM Analysis] ITC Rejects Tariffs on Chinese Graphite Anodes, Final Duties Not Imposed
[SMM Analysis] On March 12, 2026, the US International Trade Commission (ITC) ruled against imposing tariffs on graphite imports from China. Below is the complete timeline of the US anti-dumping and countervailing duty (AD/CVD) investigation into China’s active anode material (graphite anode) imports, the duty rates at each stage, and the latest outcome as of March 12, 2026.
Mar 13, 2026 19:55
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Mar 13, 2026 17:48
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Read More
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Recently, the National Development and Reform Commission (NDRC) issued the Reply on the Approval of the Hami–Dunhuang Third 750 kV Transmission Line Project, formally approving the Xinjiang Hami–Dunhuang Third 750 kV Transmission Line Project. The implementation of this project was of great significance for improving the backbone structure of the main power grid in Northwest China, strengthening the mutual support capacity between the Gansu and Xinjiang power grids, and enhancing Xinjiang’s capacity to absorb new energy. According to previously disclosed environmental impact assessment information, the project had a total static investment of 1.3509 billion yuan and was scheduled for completion in March 2027.
Mar 13, 2026 17:48
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Mar 13, 2026 17:44
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Read More
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
On March 12, it was learned from State Grid Jilin Electric Power Co., Ltd. that the project to transmit power from the Songliao Clean Energy Base in Northeast China to North China (the “Jijing UHV DC Project”) officially entered the final stage of the feasibility study. According to the plan, the project is expected to complete project approval in 2026, enter the substantive construction phase in 2027, and be completed and put into operation in 2029.
Mar 13, 2026 17:44