[SMM Analysis] China Issues "Interim Measures for Recycling and Comprehensive Utilization of Scrap NEV Batteries" – Impact on Lithium Battery Recycling Enterprises

Published: Jan 19, 2026 17:59
Source: SMM
SMM reported on January 19 that on January 16, 2026, the Ministry of Industry and Information Technology, together with the National Development and Reform Commission (NDRC), the Ministry of Ecology and Environment, the Ministry of Transport, the Ministry of Commerce, and the State Administration for Market Regulation, jointly issued the "Interim Measures for the Recycling and Comprehensive Utilization of Waste Power Batteries from New Energy Vehicles (NEVs)." This new management measure, being a joint departmental regulation, carries mandatory legal force, fundamentally changing the previous situation where guidance documents lacked sufficient binding power.

SMM January 19, 2026 - On January 16, 2026, the Ministry of Industry and Information Technology, together with the National Development and Reform Commission (NDRC), the Ministry of Ecology and Environment, the Ministry of Transport, the Ministry of Commerce, and the State Administration for Market Regulation, jointly issued the "Interim Measures for the Recycling and Comprehensive Utilization of Waste Power Batteries from New Energy Vehicles (NEVs)." This new management measure is a joint departmental regulation with mandatory legal force, fundamentally changing the previous situation where guidance documents lacked sufficient binding power.

The main content of the new management measure includes the following points:

I. Establishment of Production Codes for NEV Power Batteries.

It will establish a "digital ID card" system for NEV power batteries, enabling full life cycle traceability management through unique codes, and achieving full-process monitoring from production to retirement and recycling. Enterprises producing or importing power batteries for NEVs sold and used domestically (hereinafter collectively referred to as power battery enterprises) must code their batteries in accordance with the "Rules for Coding of Automotive Traction Batteries" (GB/T 34014).

II. Determination of the Producer Responsibility System.

The new management measure requires that power battery enterprises assume recycling responsibility for the power batteries they produce or import for domestic sale and use in NEVs (excluding those sold to NEV producers), and fulfill the following recycling obligations: sales regions for batteries must include recycling service outlets matching sales volumes, providing waste power battery recycling services; update recycling outlet addresses and recycling guidance information in prominent locations; and must not refuse to accept waste power batteries that should be recycled by the power battery enterprise, when transferred by battery swapping service enterprises, motor vehicle maintenance enterprises, etc.

Concurrently, power battery enterprises and NEV producers are encouraged to establish recycling service outlets in accordance with the "Management Specification for Recycling of Traction Batteries for Vehicles - Part 2: Recycling Service Outlets" (GB/T 38698.2).

III. Real-time Registration on the Information Platform.

The new management measure requires that end-of-life vehicle recycling and dismantling enterprises report vehicle scrapping information and warehouse withdrawal information of dismantled waste power batteries according to the rules of the "Implementation Rules for the Management of End-of-life Vehicle Recycling." Furthermore, at various stages such as product certification, customs clearance verification, repair, battery swapping, and warehousing, the following information must be reported to the relevant platform.

For example: NEV producers and enterprises importing NEVs for domestic sale must, within six months of obtaining the NEV product access announcement or mandatory product certification for NEVs, report technical information such as the disassembly and necessary dismantling of NEV power batteries.

Additionally, the new management measure also specifies clear requirements for various parties from three aspects:

I. Recycling Enterprises (including upstream grinding enterprises and downstream hydrometallurgical enterprises).

They must possess compliant procedures (environmental impact assessment, pollutant discharge permits, etc.), operate normatively by being included in the "white list," and strictly implement technical standards.

II. Producers (battery cell manufacturers/automakers)

must assume primary responsibility for recycling, establishing their own or entrusting a recycling network, conducting eco-design, and cooperating with full life cycle information traceability.

III. Consumers

are required to fulfill the entire chain of responsibilities from procurement to retirement to supervision: when purchasing, do not buy lithium battery products of unknown origin (especially those for e-bikes); when retiring, deliver the vehicle along with the battery to a legitimate recycling enterprise; when supervising, actively report illegal recycling and dismantling activities.

SMM believes that this policy innovation marks China's entry into a new phase of "strong regulation, full traceability, and strict law enforcement" in the management of power battery recycling. Through legal compulsion, digital technology, and inter-ministerial collaboration, it thoroughly conducts environmental traceability and effective utilization of scrap lithium batteries. As scrap batteries gradually enter an era of large-scale social retirement, this can effectively improve the utilization rate of batteries and reduce potential environmental risks.

SMM New Energy Research Team

Wang Cong 021-51666838

Ma Rui 021-51595780

Feng Disheng 021-51666714

Lv Yanlin 021-20707875


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
8 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
8 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
8 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
8 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
8 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
8 hours ago
[SMM Analysis] China Issues "Interim Measures for Recycling and Comprehensive Utilization of Scrap NEV Batteries" – Impact on Lithium Battery Recycling Enterprises - Shanghai Metals Market (SMM)