[SMM Manganese Ore Weekly Review] Strong Support from the Supply Side, Manganese Ore Prices Consolidate at High Levels

Published: Dec 26, 2025 17:32
December 26 news: Northern ports: South African high-iron at 30-30.5 yuan/mtu, flat WoW; South African semi-carbonate at 34-34.5 yuan/mtu, flat WoW; Gabon at 41.9-43.5 yuan/mtu, flat WoW; Australian lumps at 41-41.7 yuan/mtu, flat WoW; South African medium-iron at 37.1-37.6 yuan/mtu, up 0.54% WoW. Southern ports: South African high-iron at 30.3-30.8 yuan/mtu, flat WoW; South African semi-carbonate at 35.7-36.4 yuan/mtu, flat WoW; Gabon at 41.1-42 yuan/mtu, flat WoW; Australian lumps at 41.5-42.2 yuan/mtu, flat WoW; South African medium-iron at 37.2-37.7 yuan/mtu, up 0.27% WoW. The manganese ore market is consolidating at high levels, with cost support from the supply side and regional divergence in demand creating a tug-of-war.

December 26 news:

North China ports: South African high-iron ore at 30-30.5 yuan/mtu, flat WoW; South African semi-carbonate ore at 34-34.5 yuan/mtu, flat WoW; Gabon ore at 41.9-43.5 yuan/mtu, flat WoW; Australian lumps at 41-41.7 yuan/mtu, flat WoW; South African medium-iron ore at 37.1-37.6 yuan/mtu, up 0.54% WoW.

South China ports: South African high-iron ore at 30.3-30.8 yuan/mtu, flat WoW; South African semi-carbonate ore at 35.7-36.4 yuan/mtu, flat WoW; Gabon ore at 41.1-42 yuan/mtu, flat WoW; Australian lumps at 41.5-42.2 yuan/mtu, flat WoW; South African medium-iron ore at 37.2-37.7 yuan/mtu, up 0.27% WoW.

The manganese ore market consolidated at high levels, with cost support from the supply side and regional divergence in demand creating a tug-of-war.

Supply side, overseas manganese mines raised their January 2026 offers to China MoM from December 2025, strengthening cost support for imported manganese ore and leaving little room for price pullbacks. Specifically, port arrivals of South African medium-iron manganese ore remained low recently, tightening market supply. With virtually no actual transactions this week, traders showed strong willingness to hold prices firm, keeping prices stable. Offers for other mainstream ore types also showed no signs of softening, and traders had low willingness to sell at low prices, with the overall supply side providing solid support for prices.

Demand side, inquiry activity in both northern and southern markets weakened WoW. In the northern market, driven by bullish sentiment in the manganese ore market and the presence of planned production capacity in the Inner Mongolia SiMn production hub by month-end, SiMn plants maintained relatively active purchasing sentiment for manganese ore, providing effective demand support. However, the SiMn industry remained in the off-season, with some enterprises continuing production cuts and a limited number of enterprises currently operating. Alloy plants mostly adopted an "on-demand purchasing" strategy, resulting in relatively mediocre demand.

Overall, with current manganese ore prices at high levels and supported by the supply side, prices are expected to remain firm in the short term. However, caution is warranted against potential price pullbacks due to negative feedback from weak demand.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
18 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
18 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
18 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
18 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
18 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
18 hours ago