State Post Bureau: Postal Industry Achieves 4.48 Million m² PV Coverage, Over 75,000 Clean Energy Vehicles

Published: Dec 25, 2025 17:49
[State Post Bureau: Postal Industry's PV Panel Coverage Area Reaches 4.48 Million m², Ownership of New Energy and Clean Energy Vehicles Exceeds 75,000 Units]
The State Post Bureau held a press conference, where relevant officials stated that during the 14th Five-Year Plan period, modern information technologies such as artificial intelligence, mobile internet, and cloud computing have reshaped the operational organization models and workflow processes of the express delivery industry, enhancing the momentum for green and low-carbon development. Distribution centers have achieved intelligent scheduling, visual tracking, and information-based management, with accelerated implementation of PV power generation, intelligent sorting, intelligent security checks, and unmanned warehouses, leading to rapid improvements in informatization and intelligence levels. Hydrogen energy and clean energy vehicles have been widely adopted. Currently, the postal industry's PV panel coverage area has reached 4.48 million m², the number of green distribution centers exceeds 1,000, green outlets exceed 12,500, and the ownership of new energy and clean energy vehicles surpasses 75,000 units.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
5 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
5 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
5 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
5 hours ago
[State Post Bureau: Postal Industry's PV Panel Coverage Area Reaches 4 - Shanghai Metals Market (SMM)