Chengxin Lithium's Solid-State Battery Layout: Pioneering Sulfide Solid-State Electrolyte Mass Production for a Closed-Loop Lithium-Sulfur Resource Cycle

Published: Dec 18, 2025 16:40
Source: SMM
Chengxin Lithium established a new subsidiary to bet on sulfide and oxide solid-state electrolytes and composite separators, with production expected to commence in mid-2026. Its core advantage lies in leveraging its own lithium hydroxide, lithium metal, and sulfur resources to build a cost-closed loop, while utilizing existing customer channels to accelerate verification, aiming to quickly enter the solid-state battery materials track dominated by companies like Ganfeng.

SMM December 18 News:
Key Points: Chengxin Lithium established a new subsidiary to bet on sulfide and oxide solid-state electrolytes and composite separators, with production expected to commence in mid-2026. Its core advantage lies in leveraging its own lithium hydroxide, lithium metal, and sulfur resources to build a cost-closed loop, while utilizing existing customer channels to accelerate verification, aiming to quickly enter the solid-state battery materials track dominated by companies like Ganfeng.


An increasing number of enterprises in the lithium battery industry are joining the solid-state battery camp to more rapidly tap into the future ESS market. The following article examines the solid-state battery materials layout of top-tier lithium chemicals enterprise Chengxin Lithium.

On December 10, 2025, "Suining Chengxin Lithium Solid-State Battery Materials Technology Co., Ltd.", under Chengxin Lithium (002240), was registered and established in the Anju Economic Development Zone, Suining City, Sichuan Province, with a registered capital of 20 million yuan and legal representative Yao Kailin (Vice President of Chengxin Central Research Institute). Its business scope covers the research, development, and sales of sulfide solid-state electrolytes, oxide electrolyte powder, electrolyte membranes, and positive/negative electrode materials.
The company is 100% owned by Chengxin Lithium (Shenzhen) Technology Co., Ltd., a wholly-owned subsidiary of the publicly listed firm Chengxin Lithium.
The registered capital of 20 million yuan is "subscribed", with the first paid-in capital of 6 million yuan already in place, primarily used for laboratory renovation and equipment reservations for a small pilot line.

Chengxin Lithium's solid-state battery materials layout is a key step in its extension from a lithium chemicals supplier to a provider of key materials solutions for next-generation batteries. The company registered and established a wholly-owned subsidiary in Suining, Sichuan in December 2025, with a registered capital of 20 million yuan. 6 million yuan has been paid in for laboratory and pilot line construction. The technical roadmap focuses on sulfides (Li₂S-P₂S₅ system, with room temperature conductivity reaching 15mS/cm), while simultaneously developing oxide powder (LLZO) and composite separators.
The capacity plan is clear, aiming for rapid market positioning: The company plans to achieve Phase I production in June 2026, forming an annual capacity of 50 mt of sulfide electrolyte, 200 mt of oxide powder, and 300,000 m² of composite membrane; it also plans to expand sulfide capacity to 300 mt/year by the end of 2027 to match the demand for 1 GWh-level all-solid-state batteries.

"Lithium-Sulfur" Resource Closed Loop
Raw material security and cost reduction: The Suining base's 30 kt battery-grade lithium hydroxide capacity (commenced production in 2024) can provide a high-purity lithium source, with a transport radius of less than 50 km; simultaneously, the controlled sulfur refining unit can co-produce high-purity sulfur for sulfide synthesis. Estimates indicate this closed loop can reduce raw material costs by approximately 8%.
Lithium metal capacity support: The company has completed construction of a 500 mt lithium metal capacity (planned total 3,000 mt). Its ultra-thin lithium strip products can provide a material basis for future solid-state battery anodes (e.g., lithium metal anodes).
Customer channel synergy: The first batch of products (such as composite separators for sampling in Q1 2026) will be directly targeted at the solid-state battery project departments of existing customers CATL, REPT, and Ganfeng, which is expected to shorten the certification cycle and accelerate adoption.

The challenge lies in catching up with industry progress: Currently, Ganfeng LiEnergy has achieved mass production of 300 mt of sulfide electrolyte, and production lines of competitors like Langgu Technology are also under construction. Chengxin Lithium needs to rapidly complete customer verification after production commences in 2026 to solidify its competitive position in the "second tier" of the solid-state battery materials field.

According to SMM forecasts, all-solid-state battery shipments will reach 13.5 GWh by 2028, while semi-solid-state battery shipments will reach 160 GWh. Global lithium-ion battery demand is projected to reach approximately 2,800 GWh by 2030, with the EV sector's lithium-ion battery demand showing a CAGR of around 11% from 2024 to 2030, ESS lithium-ion battery demand at a CAGR of about 27%, and consumer electronics lithium battery demand at a CAGR of roughly 10%. Global solid-state battery penetration is estimated at about 0.1% in 2025, with all-solid-state battery penetration expected to reach around 4% by 2030, and global solid-state battery penetration potentially approaching 10% by 2035.

**Note:** For further details or inquiries regarding solid-state battery development, please contact:
Phone: 021-20707860 (or WeChat: 13585549799)
Contact: Chaoxing Yang. Thank you!

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
1 hour ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
1 hour ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
1 hour ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
1 hour ago