Tender for the Procurement of Alloy Steel Scrap for Railway Equipment

Published: Nov 18, 2025 10:49

1. Procurement Conditions

For this procurement project of Steel Scraps (Xichang Steelmaking Second Batch) (PGPWZBHGXHD251114248561), the procuring entity is the Materials Business Division Headquarters of Pangang Group Materials Trading Co., Ltd. The procurement project funds are from self-raised sources. The project has met the procurement conditions and is now conducting an open inquiry and comparison.

2. Project Overview and Procurement Scope

2.1 Project Name: Steel Scraps (Xichang Steelmaking Second Batch)

2.2 Transition to Other Procurement Method after Failed Procurement: Transition to Negotiated Procurement

2.3 The detailed procurement content, scope, and scale for this project are specified in the attachment "Bill of Materials Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Consortium bidding is not permitted for this procurement.

3.2 This procurement requires bidders to meet the following qualification requirements:

Refer to the attachment (if required)

3.3 This procurement requires bidders to meet the following registered capital requirements:

For manufacturing type: Registered capital of 2 million yuan or above

For circulation type: Registered capital of 2 million yuan or above

3.4 This procurement requires bidders to meet the following performance requirements:

When submitting bids, bidders must provide performance proof (scanned copies of VAT invoices) for similar products from January 1, 2022, to the present.

3.5 This procurement requires bidders to meet the following capability requirements, financial requirements, and other requirements:

Financial requirements: Registered capital not less than 2 million yuan.

Capability requirements: Refer to the attachment (if required)

Other requirements: Refer to the attachment (if required)

3.6 For projects that by law must undergo tender procedures, bids submitted by discredited persons subject to enforcement shall be invalid.

4. Procurement Document Acquisition

All interested bidders please log in to the Ansteel Intelligent Tender and Bidding Platform at http://bid.ansteel.cn between 14:00 on November 17, 2025, and 14:00 on November 24, 2025 (Beijing Time, the same hereinafter) to download the electronic procurement documents.

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Steel] SMS Group wins SAIL Durgapur billet caster modernization project
1 hour ago
[SMM Steel] SMS Group wins SAIL Durgapur billet caster modernization project
Read More
[SMM Steel] SMS Group wins SAIL Durgapur billet caster modernization project
[SMM Steel] SMS Group wins SAIL Durgapur billet caster modernization project
[SMM Steel] Germany’s SMS Group secured a contract from India’s SAIL to modernize billet casters at the Durgapur Steel Plant. The upgrade of two six-strand casters is expected to boost production capacity by over 60% and introduce a 150 mm × 150 mm billet section to support downstream rebar and wire rod production. The project will be implemented in two phases, with commissioning planned for Q4 2027 and Q3 2028.
1 hour ago
[SMM Steel] US drawn wire exports rise 12.5% MoM in January 2026
1 hour ago
[SMM Steel] US drawn wire exports rise 12.5% MoM in January 2026
Read More
[SMM Steel] US drawn wire exports rise 12.5% MoM in January 2026
[SMM Steel] US drawn wire exports rise 12.5% MoM in January 2026
[SMM Steel] US drawn wire exports totaled 6,737 mt in January 2026, up 12.5% MoM but down 15% YoY, according to the US Department of Commerce. Canada remained the top destination with 2,831 mt, followed by Mexico at 2,702 mt, while export value reached $18.1 million.
1 hour ago
[SMM Steel] Eurofer urges EU to act fast as global steel overcapacity hits record 2.4 billion mt
2 hours ago
[SMM Steel] Eurofer urges EU to act fast as global steel overcapacity hits record 2.4 billion mt
Read More
[SMM Steel] Eurofer urges EU to act fast as global steel overcapacity hits record 2.4 billion mt
[SMM Steel] Eurofer urges EU to act fast as global steel overcapacity hits record 2.4 billion mt
[SMM Steel] On March 25, 2026, the European Steel Association (Eurofer) issued a stark warning following the release of the latest OECD data, labeling global steel overcapacity an "existential threat" to European steelmaking, investment, and jobs. The data reveals that global steelmaking capacity has climbed to a record 2.4 billion mt, with excess capacity reaching 640 million mt in 2025—exceeding total OECD production by over 200 million mt. Eurofer Director-General Axel Eggert is calling for the immediate adoption of a robust tariff-rate quota (TRQ) system to shield the EU market from trade diversion and stabilize the domestic industry before current measures expire
2 hours ago
Tender for the Procurement of Alloy Steel Scrap for Railway Equipment - Shanghai Metals Market (SMM)