SHFE Zinc Opens Higher with a Gap, Fundamentals Continue to Drag [SMM Zinc Morning Comment]

Published: Oct 30, 2025 08:39
[SMM Zinc Morning Comment: SHFE Zinc Opens Higher with a Gap, Fundamentals Continue to Weigh] Overnight, the most-traded SHFE zinc 2512 contract opened at 22,490 yuan/mt. During the night session, SHFE zinc fluctuated around the daily average line, reaching a high of 22,530 yuan/mt early in the session and touching a low of 22,435 yuan/mt near the close, eventually settling at 22,455 yuan/mt, up 25 yuan/mt.

SMM Oct. 30:

Overnight, LME zinc opened at $3,051/mt. At the beginning of the session, it moved briefly with fluctuations along the daily average line, touching a low of $3,050/mt, then rose all the way to a high of $3,094.5/mt, after which it fluctuated above the daily average. Toward the end of the session, LME zinc turned downward, finally closing up at $3,070/mt, up $13.5/mt or 0.44%. Trading volume decreased to 10,629 lots, and open interest fell by 1,275 lots to 221,000 lots. Overnight, LME zinc formed a bullish candlestick, supported by the 5-day moving average. Low LME zinc inventory continued to boost zinc prices, and LME zinc is expected to continue fluctuating upward. However, US Fed officials dampened expectations for a December interest rate cut, and the US dollar index rose. Continued attention to subsequent macro guidance is needed.

Overnight, the most-traded SHFE zinc 2512 contract opened at 22,490 yuan/mt. During the night session, SHFE zinc fluctuated around the daily average line, reaching a high of 22,530 yuan/mt early in the session and touching a low of 22,435 yuan/mt near the end, finally closing up at 22,455 yuan/mt, up 25 yuan/mt or 0.11%. Trading volume decreased to 47,030 lots, and open interest increased by 1,081 lots to 120,000 lots. Overnight, SHFE zinc formed a bearish candlestick, pressured by the upper Bollinger Band. Boosted by LME zinc's performance, SHFE zinc gapped up to a high in the night session, and the price center shifted upward. However, the fundamental picture of strong supply and weak demand remains unchanged, downstream consumption remains weak, and upward pressure on SHFE zinc persists.

Data source statement: Except for publicly available information, other data are processed by SMM based on public information, market communication, and SMM's internal database model, for reference only and not constituting decision-making advice.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Red Dog life extension gains FAST-41 coverage for development of high-grade zinc-lead resources
36 mins ago
Red Dog life extension gains FAST-41 coverage for development of high-grade zinc-lead resources
Read More
Red Dog life extension gains FAST-41 coverage for development of high-grade zinc-lead resources
Red Dog life extension gains FAST-41 coverage for development of high-grade zinc-lead resources
The U.S. Permitting Council granted FAST-41 coverage to the Red Dog Mine Life Extension Project in northwest Alaska. The project proposes underground long-hole stoping at the Aktigiruq and Anarraaq deposits, with ore to be processed through Red Dog’s existing mill and is intended to extend Red Dog operations by approximately 14 years. The U.S. Army Corps of Engineers will lead the federal permitting review. Teck reports 42.2 Mt of indicated resources grading 15.8% Zn and 18.8 Mt of inferred resources grading 11.8% Zn at Aktigiruq, alongside 17.0 Mt of inferred resources grading 14.0% Zn at Anarraaq. Both deposits also contain lead, silver and germanium. FAST-41 coverage supports a coordinated and transparent permitting process; it does not constitute final permitting approval or commercial production.
36 mins ago
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
1 hour ago
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
Read More
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
On September 2, the Shanghai Futures Exchange (SHFE) announced that it had approved Shanghai Yuqiang Supply Chain Management Co., Ltd. to adjust its designated warehouse capacity for copper, aluminum and zinc futures. At the storage site at No. 3501 Gonghe New Road, Shanghai, the company will cancel its copper and aluminum futures storage qualifications, while its approved zinc futures warehouse capacity will remain unchanged at 20,000 tonnes. At the site at No. 2222 Jichuan Road, Minhang District, Shanghai, its zinc futures storage qualification will be canceled, while approved capacity will be adjusted to 45,000 tonnes of copper and 5,000 tonnes of aluminum.
1 hour ago
Xingye Silver & Tin's Yinman Mining to Resume Operations After Fatal Accident and Safety Inspections
1 hour ago
Xingye Silver & Tin's Yinman Mining to Resume Operations After Fatal Accident and Safety Inspections
Read More
Xingye Silver & Tin's Yinman Mining to Resume Operations After Fatal Accident and Safety Inspections
Xingye Silver & Tin's Yinman Mining to Resume Operations After Fatal Accident and Safety Inspections
On September 2, Xingye Silver & Tin announced that an accident occurred at its wholly owned subsidiary Yinman Mining in West Ujimqin Banner, Inner Mongolia, at around 15:30 on July 26, 2026, resulting in one fatality and no injuries. Following the accident, Yinman Mining conducted comprehensive safety inspections and implemented corrective measures. Recently, the company received approval from the West Ujimqin Banner Emergency Management Bureau to resume operations at its ore-processing tailings system. The processing plant is scheduled to resume operations on September 3, 2026. Meanwhile, Yinman Mining is continuing corrective work at the mining area and aims to resume mining operations as soon as possible.
1 hour ago
SHFE Zinc Opens Higher with a Gap, Fundamentals Continue to Drag [SMM Zinc Morning Comment] - Shanghai Metals Market (SMM)