Positive Preliminary Metallurgical Test Work Results at Conchas

Published: Oct 28, 2025 08:00
Berkeley Energia Limited announced that its Conchas Project in Spain has achieved positive preliminary metallurgical test results, indicating strong potential for the recovery of key minerals such as lithium (Li) and rubidium (Rb). The results show that Conchas hosts shallow, thick zones of lithium and rubidium mineralization, with accessory tin, cesium, beryllium, niobium, and tantalum, mainly occurring within muscovitic leucogranite. Metallurgical test work conducted by SLR Consulting included sample characterization, mineralogical analysis, gravity separation, flotation, and magnetic testing. In the flotation tests, samples with particle sizes under 150 microns achieved recoveries of 78% for lithium and 63% for rubidium. Magnetic separation on coarser material (-300 to +150 microns) achieved stage recoveries of 77% lithium and 58% rubidium, suggesting that combining magnetic separation and flotation could enhance overall recovery efficiency. Next, the company plans to conduct 3D modeling of drilling data to refine geological interpretation of the lithium and rubidium mineralization, followed by a second phase of metallurgical testing to optimize processing methods. Rubidium, widely used in defense, aerospace, communications, and renewable energy, is classified as a critical mineral by the U.S. and Japan, reflecting its growing strategic and industrial importance.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Yunnan Energy Wins Bid for 100MW/400MWh Vanadium Flow Battery Storage Project
17 hours ago
Yunnan Energy Wins Bid for 100MW/400MWh Vanadium Flow Battery Storage Project
Read More
Yunnan Energy Wins Bid for 100MW/400MWh Vanadium Flow Battery Storage Project
Yunnan Energy Wins Bid for 100MW/400MWh Vanadium Flow Battery Storage Project
Yunnan Energy announced that it has been selected as the developer of the 100MW/400MWh Ninglang independent shared energy storage project in Lijiang, Yunnan Province. The project, which has been included in Yunnan's 2026 new shared energy storage project list, will adopt a grid-forming vanadium redox flow battery (VRFB) energy storage system and is scheduled to be commissioned within two years. The company said the project will strengthen its new energy business, although it remains subject to regulatory approvals.
17 hours ago
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
17 hours ago
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
Read More
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
SQM, Codelco Outline Expansion Plan to Lift Lithium Output to 470,000 mt/y
SQM and Codelco's lithium joint venture, Novandino, has outlined plans in an environmental impact assessment (EIA) filing to increase annual lithium production capacity from around 270,000 mt currently to as much as 470,000 mt. The expansion is aimed at meeting long-term demand from electric vehicles and grid-scale energy storage. According to the filing, production will first gradually rise to around 300,000 mt before transitioning over seven years to an integrated production system incorporating direct lithium extraction (DLE), with additional capacity expected to come online over several years.
17 hours ago
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
Jul 3, 2026 22:44
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
Read More
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
Congo cobalt exporters fear losing quotas due to administrative glitch, sources say
According to an industry letter seen by Reuters, exporters have been unable to submit export declarations through the customs platform since July 1 because ARECOMS, the Democratic Republic of Congo's strategic minerals regulator, has not formally notified customs to continue processing export quotas. As a result, major producers including CMOC Group, Glencore, Eurasian Resources Group (ERG) and Huayou Cobalt have been unable to complete export procedures. Meanwhile, ARECOMS requires companies to utilize their first-half export quotas by July 5, after which any unused volumes will be withdrawn and reallocated. Industry sources estimate that around 60%–75% of companies are unlikely to meet the deadline due to administrative delays. If the issue is not resolved promptly, up to 20,000 tonnes of cobalt exports, worth approximately US$1.1 billion at current prices, could be affected. CMOC alone could lose almost all of its second-quarter export quota. SMM will continue to monitor developments.
Jul 3, 2026 22:44
Berkeley Energia Limited announced that its Conchas Project in Spain h - Shanghai Metals Market (SMM)