[SMM Analysis] Lithium Battery Recycling Market Procurement Volume Continued to Rise MoM in September

Published: Oct 27, 2025 16:24
The market procurement volume in September was 28,100 mt, up approximately 8.18% MoM, showing an overall active trend.

SMM Oct. 27:

 

Market procurement volume in September was 28,100 mt, up about 8.18% MoM, showing overall active momentum. Sustained release of downstream demand was the main driver: on one hand, most LFP battery hydrometallurgy recycling plants maintained high output against the backdrop of generally stabilizing lithium carbonate prices, driving the volume of recycled lithium chemicals to about 8,000 mt in September, an increase of about 9.7% MoM; on the other hand, ternary hydrometallurgy plants saw further improved procurement enthusiasm as cobalt sulphate prices rose significantly due to supply-side influences while lithium carbonate remained stable, driving nickel salt production from recycling to 5,500 mt in metal content (up about 3.32% MoM) and cobalt salt production from recycling to 1,380 mt in metal content (up 1.1% MoM).

Meanwhile, the proportion of recycled cobalt salts in raw material cobalt sulphate is further increasing. Using recycled materials, especially scrap LCO battery, to produce cobalt sulphate currently offers significantly expanded economic advantages compared to other raw materials.

Supply side, quotations from grinding mills and traders continued to rise following nickel, cobalt, and lithium chemical prices, with black mass prices also increasing in tandem, and overall market transaction sentiment was hotter than last month.

For the outlook, expectations are divided: some predict that hydrometallurgical procurement scale will continue to increase to 30,000 mt next month, up about 6.76% MoM; other views expect the procurement scale to remain stable at around 28,000 mt, basically flat MoM.

 

 

       

 

[For more content, subscribe to SMM Nickel Research Group products "China Nickel-Chrome-Stainless Steel Industry Chain Regular Report" and "China Nickel-Chrome-Stainless Steel Industry Chain High-End Report" to obtainthe latest data analysis and market interpretation related to nickel ore, nickel pig iron (China + Indonesia), refined nickel, nickel sulphate, chrome ore,ferrochrome, stainless steel (China + Indonesia)! For ordering,trial subscription, please call 021-51666863, Contact: Fu Jian]


 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
45 mins ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
45 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
48 mins ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
48 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
49 mins ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
49 mins ago